Statutory Instruments

2001 No. 2416

HIGHWAYS, ENGLAND

The A5 London to Holyhead Trunk Road (Nutts Lane Junction Improvement) Order 2001

Made

28th June 2001

Coming into force

19th July 2001

The Secretary of State for Transport, Local Government and the Regions makes this Order in exercise of powers conferred by section 10 of the Highways Act 1980( 1 ) and now vested in him( 2 ), and of all other enabling powers enabling him in that behalfโ€”

1. โ€”(1) This Order may be cited as the A5 London to Holyhead Trunk Road (Nutts Lane Junction Improvement) Order 2001 and shall come into force on 19th July 2001.

(2) In this Order all measurements of distance are measured along the route of the relevant highway.

2. The new highway which the Secretary of State proposes to construct along the route described in the Schedule to this Order, shall become a trunk road from the date when this Order comes into force.

3. The centre line of the new trunk road is indicated by a heavy black line on the plan numbered HA 10/PS/236, marked โ€œThe A5 London to Holyhead Trunk Road (Nutts Lane Junction Improvement) Order 2001โ€, signed by authority of the Secretary of State for the Environment, Transport and the Regions, and deposited at DETR, Records Management Branch, Floor 13 (IMD), Ashdown House, St Leonards-on-Sea, Hastings, East Sussex TN37 7GA.

4. The Secretary of State directs as respects any part of a highway which crosses the route of the new trunk road thatโ€”

(a) where the highway is maintainable at the public expense by a local highway authority, the part in question shall be maintained by that authority, and

(b) where the highway is not so maintainable and is not maintainable under a special enactment or by reason of tenure, enclosure or prescription, the Secretary of State shall be under no duty to maintain the part in question,

until in either case a date to be specified in a notice given by the Secretary of State to the highway authority for that highway. The date specified will not be later than the date on which the new trunk road is opened for traffic.

Signed by authority of the Secretary of State for Transport, Local Government and the Regions

Nick Carter

Divisional Director, Highways Agency

28th June 2001

THE SCHEDULE ROUTE OF THE NEW TRUNK ROAD AT NUTTS LANE NEAR HINCKLEY

A new trunk road roundabout to connect the eastbound and westbound carriageway of the A5 with Nutts Lane. (The new trunk road being given the reference letters A and B on the site plan).

( 1 )

1980 c. 66 .

( 2 )

S.I. 1997/2971 .

( 1 )

1980 c. 66 .

( 2 )

S.I. 1997/2971 .

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The A5 London to Holyhead Trunk Road (Nutts Lane Junction Improvement) Order 2001 (2001/2416)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.