Statutory Instruments
2001 No. 2528
OFFSHORE INSTALLATIONS
The Offshore Installations (Safety Zones) (No. 2) Order 2001
Made
11th July 2001
Coming into force
1st August 2001
The Secretary of State, in exercise of the powers conferred on him by section 22(1) and (2) of the Petroleum Act 1987(1) (hereinafter referred to as “the Act”) and of all powers enabling him in that behalf, hereby makes the following order:
Citation and commencement
1. This order may be cited as the Offshore Installations (Safety Zones) (No. 2) Order 2001 and shall come into force on 1st August 2001.
Establishment of safety zones
2. A safety zone is hereby established around each installation specified in column 1 of the Schedule hereto (being an installation stationed in waters to which subsection (7) of section 21 of the Act applies) having a radius of five hundred metres from the point as respects that installation which has the co-ordinates of latitude and longitude according to European Datum (1950) specified in columns 2 and 3 of the Schedule.
Signed by authority of the Secretary of State
Alan Whitehead
Parliamentary Under Secretary of State,
Department for Transport, Local Government and the Regions
11th July 2001
Article 2
SCHEDULESafety Zones
(1) | (2) | (3) |
---|---|---|
Name or other designation of the offshore installation | Latitude North | Longitude |
South Everest Subsea Installation | 57°41'22.511" | 01°45'27.727"E |
Pipe Line End Manifold, Magnus EOR Development | 60°16'56.2" | 03°48'21.1"W |
Clair Tee, Magnus EOR Development | 60°36'45" | 02°27'19.1"W |
Nevis Facility Lewis 1 Well | 59°31'18.13" | 01°25'25.25"E |
Hamilton East Wellhead | 53°36'03" | 03°25'05.92"W |
. . . | . . . | . . . |
. . . | . . . | . . . |
. . . | . . . | . . . |
. . . | . . . | . . . |
East Telford Well | 58°12'31.32" | 0°18'32.298"E |