πŸ”† πŸ“– βž• πŸ‘€

Statutory Instruments

2002 No. 823

ELECTRICITY, ENGLAND AND WALES

The Electricity (Exemption from the Requirement for a Generation Licence) (England and Wales) Order 2002

Made

26th March 2002

Laid before Parliament

26th March 2002

Coming into force

22nd April 2002

The Secretary of State, in exercise of the powers conferred on her by section 5 of the Electricity Act 1989( 1 ) and after giving notice under and considering any representations in accordance with section 5(2) of that Act, hereby makes the following Order:β€”

Citation, commencement and extent

1. β€”(1) This Order may be cited as the Electricity (Exemption from the Requirement for a Generation Licence) (England and Wales) Order 2002 and shall come into force on 22nd April 2002.

(2) This Order does not extend to Scotland.

Interpretation

2. β€”(1) In this Orderβ€”

β€œthe Act” means the Electricity Act 1989;

β€œCastleford generating station” means the plant known as Castleford CHP, situated at Wheldon Road, Castleford, WF10 2JT;

β€œlicensed generator” means the holder of a licence under section 6(1)(a)( 2 ) of the Act;

β€œlicensed transmitter” means the holder of a licence under section 6(1)(b) of the Act;

β€œPowergen CHP” means Powergen CHP Limited registered in England and Wales with number 2584288;

β€œPowergen Cogeneration” means Powergen Cogeneration Limited registered in England and Wales with number 2730697;

β€œStoke generating station” means the plant known as Stoke CHP, situated at Campbell Road, Stoke-on-Trent, ST4 4EY; and

β€œtotal system” means the transmission system in England and Wales of the licensed transmitter and all distribution systems in England and Wales.

(2) For the purposes of this Order a person shall be treated as generating electricity at any time if he is the operator of plant or equipment which at the timeβ€”

(a) is generating or capable of generating electricity; or

(b) is not capable of generating electricity only by reason of the maintenance, repair or testing of the plant or equipment.

Exemptions from section 4(1)(a) of the Act

3. β€”(1) Exemption is granted from section 4(1)(a) of the Act to Powergen CHP in respect of the Stoke generating station.

(2) Exemption is granted from section 4(1)(a) of the Act to Powergen Cogeneration in respect of the Castleford generating station.

Conditions on exemptions

4. β€”(1) The exemption granted by article 3(1) to Powergen CHP is subject to compliance with the conditions specified in paragraph (2) below.

(2) (a) Powergen CHP is not a licensed generator.

(b) The Stoke generating station is connected to the total system and is not normally capable of exporting more electrical power than 100 megawatts to the total system, disregarding power temporarily provided in excess of 100 megawatts due to technical circumstances outside the reasonable control of Powergen CHP.

(3) The exemption granted by article 3(2) to Powergen Cogeneration is subject to compliance with the conditions specified in paragraph (4) below.

(4) (a) Powergen Cogeneration is not a licensed generator.

(b) The Castleford generating station is connected to the total system and is not normally capable of exporting more electrical power than 100 megawatts to the total system, disregarding power temporarily provided in excess of 100 megawatts due to technical circumstances outside the reasonable control of Powergen Cogeneration.

Brian Wilson,

Minister of State for Industry and Energy,

Department of Trade and Industry

26th March 2002

( 1 )

1989 c. 29 ; section 5 was substituted by section 29 of the Utilities Act 2000 (c. 27) .

( 2 )

Section 6 was substituted by section 30 of the Utilities Act 2000.

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Electricity (Exemption from the Requirement for a Generation Licence) (England and Wales) Order 2002 (2002/823)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application
Castleford generating stationart. 2.Castleford_rtPgkIx
licensed generatorart. 2.licensed_g_rtClnBP
licensed transmitterart. 2.licensed_t_rtivGNI
Powergen CHPart. 2.Powergen_C_rt3Qptk
Powergen Cogenerationart. 2.Powergen_C_rt7joam
Stoke generating stationart. 2.Stoke_gene_rtMWmW3
the Actart. 2.the_Act_rtcgncT
total systemart. 2.total_syst_rt0seDj

Status of changes to instrument text