Statutory Instruments

2003 No. 3318

ELECTRICITY

The Electricity (Exemption from the Requirement for a Generation Licence) (No. 2) Order 2003

Made

17th December 2003

Laid before Parliament

19th December 2003

Coming into force

11th January 2004

The Secretary of State, in exercise of the powers conferred on her by section 5 of the Electricity Act 1989( 1 ) and after giving notice under and considering any representations in accordance with section 5(2) of that Act, hereby makes the following Order:β€”

Citation, commencement and extent

1. β€”(1) This Order may be cited as the Electricity (Exemption from the Requirement for a Generation Licence) (No. 2) Order 2003 and shall come into force on 11th January 2004.

(2) This Order does not extend to Scotland.

Interpretation

2. In this Orderβ€”

β€œthe Act” means the Electricity Act 1989;

β€œCambrian Wind Energy” means Cambrian Wind Energy Limited, registered in England and Wales with number 3343483;

β€œCefn Croes generating station” means the wind farm known as Cefn Croes Wind Farm situated at Ceredigion in Wales;

β€œGlobal Renewable Energy Partners” means Global Renewable Energy Partners UK Marine Limited, registered in England and Wales with number 04130301;

β€œlicensed generator” means the holder of a licence under section 6(1)(a)( 2 ) of the Act;

β€œlicensed transmitter” means the holder of a licence under section 6(1)(b) of the Act;

β€œKentish Flats generating station” means the offshore wind farm known as Kentish Flats Offshore Wind Farm situated in the outer Thames Estuary at Kentish Flats approximately 8.5 kilometres north of Herne Bay, Kent; and

β€œtotal system” means the transmission system in England and Wales of the licensed transmitter and all distribution systems in England and Wales.

Exemption from section 4(1)(a) of the Act

3. Exemption is granted from section 4(1)(a) of the Act to Cambrian Wind Energy in respect of the Cefn Croes generating station.

4. Exemption is granted from section 4(1)(a) of the Act to Global Renewable Energy Partners in respect of the Kentish Flats generating station.

Conditions on exemption

5. β€”(1) The exemption granted by article 3 to Cambrian Wind Energy is subject to compliance with the conditions specified in paragraph (2) below.

(2) (a) Cambrian Wind Energy is not a licensed generator.

(b) the Cefn Croes generating station is connected to the total system and is not normally capable of exporting more electrical power than 100 megawatts to the total system, disregarding power temporarily provided in excess of 100 megawatts due to technical circumstances outside the reasonable control of Cambrian Wind Energy.

6. β€”(1) The exemption granted by article 4 to Global Renewable Energy Partners is subject to compliance with the conditions specified in paragraph (2) below.

(2) (a) Global Renewable Energy Partners is not a licensed generator.

(b) The Kentish Flats generating station is connected to the total system and is not normally capable of exporting more electrical power than 100 megawatts to the total system, disregarding power temporarily provided in excess of 100 megawatts due to technical circumstances outside the reasonable control of Global Renewable Energy Partners.

Stephen Timms,

Minister of State for Energy, E-commerce and Postal Services,

Department of Trade and Industry

17th December 2003

( 1 )

1989 c. 29 ; section 5 was substituted by section 29 of the Utilities Act 2000 (c. 27) .

( 2 )

Section 6 was substituted by section 30 of the Utilities Act 2000.

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Electricity (Exemption from the Requirement for a Generation Licence) (No. 2) Order 2003 (2003/3318)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application
Cambrian Wind Energyart. 2.Cambrian_W_rtJ97WZ
Cefn Croes generating stationart. 2.Cefn_Croes_rtWv0jK
Global Renewable Energy Partnersart. 2.Global_Ren_rtdufJ2
Kentish Flats generating stationart. 2.Kentish_Fl_rtRkRWK
licensed generatorart. 2.licensed_g_rt9dSqb
licensed transmitterart. 2.licensed_t_rtkkjFY
the Actart. 2.the_Act_rtqhucq
total systemart. 2.total_syst_rtvQ3ZB

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.