Loading…eh

🔆 📖 👤

Statutory Instruments

2003 No. 3318

ELECTRICITY

The Electricity (Exemption from the Requirement for a Generation Licence) (No. 2) Order 2003

Made

17th December 2003

Laid before Parliament

19th December 2003

Coming into force

11th January 2004

The Secretary of State, in exercise of the powers conferred on her by section 5 of the Electricity Act 1989( 1 ) and after giving notice under and considering any representations in accordance with section 5(2) of that Act, hereby makes the following Order:—

Citation, commencement and extent

1. —(1) This Order may be cited as the Electricity (Exemption from the Requirement for a Generation Licence) (No. 2) Order 2003 and shall come into force on 11th January 2004.

(2) This Order does not extend to Scotland.

Interpretation

2. In this Order—

the Act” means the Electricity Act 1989 ;

Cambrian Wind Energy” means Cambrian Wind Energy Limited, registered in England and Wales with number 3343483;

Cefn Croes generating station” means the wind farm known as Cefn Croes Wind Farm situated at Ceredigion in Wales;

Global Renewable Energy Partners” means Global Renewable Energy Partners UK Marine Limited, registered in England and Wales with number 04130301;

licensed generator” means the holder of a licence under section 6(1)(a)( 2 ) of the Act;

licensed transmitter” means the holder of a licence under section 6(1)(b) of the Act;

Kentish Flats generating station” means the offshore wind farm known as Kentish Flats Offshore Wind Farm situated in the outer Thames Estuary at Kentish Flats approximately 8.5 kilometres north of Herne Bay, Kent; and

total system” means the transmission system in England and Wales of the licensed transmitter and all distribution systems in England and Wales.

Exemption from section 4(1)(a) of the Act

3. Exemption is granted from section 4(1)(a) of the Act to Cambrian Wind Energy in respect of the Cefn Croes generating station.

4. Exemption is granted from section 4(1)(a) of the Act to Global Renewable Energy Partners in respect of the Kentish Flats generating station.

Conditions on exemption

5. —(1) The exemption granted by article 3 to Cambrian Wind Energy is subject to compliance with the conditions specified in paragraph (2) below.

(2) (a) Cambrian Wind Energy is not a licensed generator.

(b) the Cefn Croes generating station is connected to the total system and is not normally capable of exporting more electrical power than 100 megawatts to the total system, disregarding power temporarily provided in excess of 100 megawatts due to technical circumstances outside the reasonable control of Cambrian Wind Energy.

6. —(1) The exemption granted by article 4 to Global Renewable Energy Partners is subject to compliance with the conditions specified in paragraph (2) below.

(2) (a) Global Renewable Energy Partners is not a licensed generator.

(b) The Kentish Flats generating station is connected to the total system and is not normally capable of exporting more electrical power than 100 megawatts to the total system, disregarding power temporarily provided in excess of 100 megawatts due to technical circumstances outside the reasonable control of Global Renewable Energy Partners.

Stephen Timms,

Minister of State for Energy, E-commerce and Postal Services,

Department of Trade and Industry

17th December 2003

( 1 )

1989 c. 29 ; section 5 was substituted by section 29 of the Utilities Act 2000 (c. 27) .

( 2 )

Section 6 was substituted by section 30 of the Utilities Act 2000.

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Electricity (Exemption from the Requirement for a Generation Licence) (No. 2) Order 2003 (2003/3318)
Version from: original only

Displaying information

Status of this instrument

in force Provision is in force
in force* In force only for specified purposes (see footnote)
not in force Not in force in England (may be in force in other geographies, see footnotes)
defined term Defined term
dfn Defined term (alternative style)
footnote commentary transitional and savings in force status related provisions geo extent insert/omit source count in force adj
Defined Term Section/Article ID Scope of Application
Cambrian Wind Energy art. 2. def_44049a5a22
Cefn Croes generating station art. 2. def_950834bd81
Global Renewable Energy Partners art. 2. def_8a131b72d6
Kentish Flats generating station art. 2. def_f58d358006
licensed generator art. 2. def_dff975485f
licensed transmitter art. 2. def_9dde5c2bfa
the Act art. 2. def_0fc534d3b9
total system art. 2. def_fde8a91bc6

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.

Contains public sector information licensed under the Open Government Licence v3.0.