Statutory Instruments

2005 No. 1656

OFFSHORE INSTALLATIONS

The Offshore Installations (Safety Zones) Order 2005

Made

21st June 2005

Coming into force

12th July 2005

The Secretary of State, in exercise of the powers conferred upon him by sections 22(1) and (2) of the Petroleum Act 1987( 1 ) (“the Act”), and for the purpose of giving effect to proposals submitted to him by the Health and Safety Commission under section 24(2A) of the Act, hereby makes the following Order:

Citation and commencement

1. This Order may be cited as the Offshore Installations (Safety Zones) Order 2005 and shall come into force on 12th July 2005.

Establishment of safety zones

2. A safety zone is established around each installation specified in column 1 of the Schedule (being an installation stationed in waters to which subsection (7) of section 21 of the Petroleum Act 1987 applies) having a radius of five hundred metres from the point as respects that installation which has the co-ordinates of latitude and longitude according to European Datum (1950) specified in columns 2 and 3 of the Schedule.

Amendment to the Offshore Installations (Safety Zones) (No. 3) Order 2004

3. In the Schedule to the Offshore Installations (Safety Zones) Order 2004( 2 ) the entry relating to Nevis Central Lewis Well, Block 9/13a, Beryl Field shall be omitted.

Philip A. Hunt

Parliamentary Under-Secretary of State

Department for Work and Pensions

21st June 2005

Article 2

SCHEDULE SAFETY ZONES

(1) (2) (3)
Name or other designation of the offshore installation Latitude North Longitude
Brechin Well, Block 22/23a , Brechin Field 57° 18.38' 01° 34.13' E
Callanish Well Centre, Block 15/29b, Callanish Field 58° 00.13' 00° 43.59' E
Brodgar Well Centre, Block 21/3, Brodgar Field 57° 54.99' 00° 30.65' E
Johnston Field Extension Well J4, Block 43/27a, Johnston Field 54° 00.88' 01° 17.75' E
Central Water Injection Manifold, Block 20/6, Buzzard Field 57° 49.61' 00° 56.13'W
Southern Water Injection Manifold, Block 20/6, Buzzard Field 57° 48.04' 00° 56.37'W
Gannet GB03, Block 21/25, Gannet Field 57° 10.77' 00° 55.41' E
9/13a-LP6 Well, Block 9/13a, Nevis Field 59° 31.29' 01° 25.44' E
Rhum Manifold, Block 3/29a, Rhum Field 60° 07.79' 01° 44.19' E
Xmas Tree for Well 3/29a-4, Block 3/29a, Rhum Field 60° 08.23' 01° 42.83' E
Xmas Tree for Well 3/29a-5, Block 3/29a, Rhum Field 60° 09.9' 01° 44.82' E
Xmas Tree for Well 3/29a-SF1, Block 3/29a, Rhum Field 60° 08.94' 01° 43.38' E
( 1 )

1987 c. 12 ; section 24(2A) was inserted by S.I. 1993/1823 .

( 2 )

S.I. 2004/343 .

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Offshore Installations (Safety Zones) Order 2005 (2005/1656)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application
04para SCHEDULE04_msquKxAR
19para SCHEDULE19_msqGykLV
23para SCHEDULE23_msqcDV7e
29para SCHEDULE29_msq1RJwF
41para SCHEDULE41_msqPN974
44para SCHEDULE44_msqTVKkU
59para SCHEDULE59_msqJT5Cr
61para SCHEDULE61_msqwCyc3
65para SCHEDULE65_msqJZY6q
75para SCHEDULE75_msqw9H0q
77para SCHEDULE77_msqeWMhM
79para SCHEDULE79_msqZPu9I
82para SCHEDULE82_msqmNqA5
83para SCHEDULE83_msqtIsSu
88para SCHEDULE88_msqKHQ5L
94para SCHEDULE94_msqjvdTe
99para SCHEDULE99_msq3vQEg
the ActUnknown(“_prnF3Nub
This instrument is derived from the version at www.legislation.gov.uk. To see a list of all amendments (including any to be made) check the resources page for this instrument on their website. Note, the status of this instrument is given above.
This instrument is derived from the version at www.legislation.gov.uk. To see original commencement information, check the resources page associated with this instrument. n.b. commencement information for marked amendments is embedded in the relevant footnote.

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.