Loading…eh

🔆 📖 👤

Statutory Instruments

2005 No. 2242

ELECTRICITY, ENGLAND AND WALES

The Electricity (Exemption from the Requirement for a Generation Licence) (England and Wales) Order 2005

Made

14th July 2005

Laid before Parliament

11th August 2005

Coming into force

1st September 2005

The Secretary of State, in exercise of the powers conferred on him by section 5 of the Electricity Act 1989( 1 ) and after giving notice under and considering any representations in accordance with section 5(2) of that Act, hereby makes the following Order:—

Citation, commencement and extent

1. —(1) This Order may be cited as the Electricity (Exemption from the Requirement for a Generation Licence) (England and Wales) Order 2005 and shall come into force on 1 st September 2005.

(2) This Order does not extend to Scotland.

Interpretation

2. In this Order—

the Act” means the Electricity Act 1989 ;

Barrow generating station” means the offshore wind farm known as Barrow Offshore Wind Farm situated offshore approximately 7 kilometres south-west of Walney Island in Cumbria;

Barrow Offshore Wind” means Barrow Offshore Wind Limited registered in England and Wales with number 4145993;

licensed generator” means the holder of a licence under section 6(1)(a)( 2 ) of the Act;

licensed transmitter” means the holder of a licence under section 6(1)(b) of the Act; and

total system” means the transmission system in England and Wales of the licensed transmitter and all distribution systems in England and Wales.

Exemption from section 4(1)(a) of the Act

3. Exemption is granted from section 4(1)(a) of the Act to Barrow Offshore Wind in respect of the Barrow generating station.

Conditions on exemption

4. The exemption granted by article 3 to Barrow Offshore Wind is subject to compliance with the conditions specified in sub paragraphs (a) and (b) below—

(a) Barrow Offshore Wind is not a licensed generator;

(b) the Barrow generating station is connected to the total system and is not normally capable of exporting more electrical power than 100 megawatts to the total system, disregarding power temporarily provided in excess of 100 megawatts due to technical circumstances outside the reasonable control of Barrow Offshore Wind.

Malcolm Wicks

Minister for Energy,

Department of Trade and Industry

14th July 2005

( 1 )

1989 c. 29 ; section 5 was substituted by section 29 of the Utilities Act 2000 (c. 27) .

( 2 )

Section 6 was substituted by section 30 of the Utilities Act 2000.

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Electricity (Exemption from the Requirement for a Generation Licence) (England and Wales) Order 2005 (2005/2242)
Version from: original only

Displaying information

Status of this instrument

in force Provision is in force
in force* In force only for specified purposes (see footnote)
not in force Not in force in England (may be in force in other geographies, see footnotes)
defined term Defined term
dfn Defined term (alternative style)
footnote commentary transitional and savings in force status related provisions geo extent insert/omit source count in force adj
Defined Term Section/Article ID Scope of Application
Barrow generating station art. 2. def_9b2e0d2f4e
Barrow Offshore Wind art. 2. def_b5007f1fd0
licensed generator art. 2. def_8e641cf459
licensed transmitter art. 2. def_0529f5ce43
the Act art. 2. def_1e28dab3c6
total system art. 2. def_7bac886b7e

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.

Contains public sector information licensed under the Open Government Licence v3.0.