🔆 📖 👤

Statutory Instruments

2006 No. 2388

ELECTRICITY

The Electricity from Non-Fossil Fuel Sources Arrangements (England and Wales) Order 2006

Made

5th September 2006

Laid before Parliament

8th September 2006

Coming into force

1st October 2006

The Secretary of State, in exercise of the powers conferred by section 67(1)(c) of the Utilities Act 2000( 1 ), makes the following Order:—

Citation, commencement and extent

1. —(1) This Order may be cited as the Electricity from Non-Fossil Fuel Sources Arrangements (England and Wales) Order 2006 and shall come into force on 1st October 2006.

(2) This Order extends to England and Wales only.

Interpretation

2. In this Order—

generator” has the meaning given to that term by the NFFO Savings Order;

new arrangements” has the meaning given to that term by the NFFO Savings Order;

NFFO 4 Order” means the Electricity (Non-Fossil Fuel Sources) (England and Wales) Order 1997( 2 );

NFFO 5 Order” means the Electricity (Non-Fossil Fuel Sources) (England and Wales) Order 1998( 3 );

NFFO Savings Order” means the Electricity from Non-Fossil Fuel Sources Saving Arrangements Order 2000( 4 );

nominated person” has the meaning given to that term by the NFFO Savings Order; and

relevant contracts” means the replacement power purchase agreements which constitute part of the new arrangements made by the nominated person pursuant to the NFFO Savings Order with a generator of a non-fossil fuel generating station described in Part V of Schedule 1 to the NFFO 4 Order or in Part III of Schedule 1 to the NFFO 5 Order and which are described further in the Schedule.

Contracts

3. With effect from the coming into force of this Order, clause 14.2 of each of the relevant contracts shall be amended by deleting the final sentence of clause 14.2 and substituting the following—

If the Seller is not entitled to the Premium Price the price for Relevant Metered Output for the relevant Period of the Order shall be the lower of the Premium Price and the Reference Price within the meaning of the following sentence. For the purposes of this clause 14.2 “Reference Price” shall mean “Reference Price” as defined in clause 1.1 except that the reference to the “ NFFO Contracts” in paragraph (A)(i) of that definition shall be a reference only to those NFFO Contracts within the Relevant Technology Band. .

Maragaret Hodge

Minister for Industry and the Regions

Department of Trade and Industry

5th September 2006

Article 2

SCHEDULE Relevant contracts

Contract Date entered into Facility Generator
1. Renewables NFFO 4 Replacement Power Purchase Agreement non BSC Party Contract 08.03.2001 Edmonton B CHP Plant London Waste Limited
2. Renewables NFFO 4 Replacement Power Purchase Agreement non BSC Party Contract 08.03.2001 City Energy CHP Dreh Resources Limited
3. Renewables NFFO 4 Replacement Power Purchase Agreement non BSC Party Contract 08.03.2001 City Energy Portsmouth CHP Dreh Resources Limited
4. Renewables NFFO 4 Replacement Power Purchase Agreement BSC Exemptible Contract 08.03.2001 Start Regen Heron Trust Limited
5. Renewables NFFO 4 Replacement Power Purchase Agreement non BSC Party Contract 08.03.2001 City Energy Sheffield CHP Dreh Resources Limited
6. Renewables NFFO 4 Replacement Power Purchase Agreement non BSC Party Contract 08.03.2001 Coventry Waste to Energy Plant Coventry and Solihull Waste Disposal Company Limited
7. Renewables NFFO 4 Replacement Power Purchase Agreement non BSC Party Contract 08.03.2001 Raikes Lane CHP Greater Manchester Waste Limited
8. Renewables NFFO 4 Replacement Power Purchase Agreement BSC Exemptible Contract 08.03.2001 Fibrepower (Slough) Fibrepower (Slough) Limited
9. Renewables NFFO 4 Replacement Power Purchase Agreement non BSC Party Contract 04.03.2002 Huddersfield Waste to Energy Facility SITA Kirklees Limited
10. Renewables NFFO 5 Replacement Power Purchase Agreement non BSC Party Contract 08.03.2001 Eastcroft WasteNotts (Reclamation) Limited
11. Renewables NFFO 5 Replacement Power Purchase Agreement BSC Exemptible Party Contract 08.03.2001 Nine Elms CHP Gent Fairhead Environmental Services Limited
12. Renewables NFFO 5 Replacement Power Purchase Agreement BSC Exemptible Contract 08.03.2001 Acorn Energy Supplies Acorn Energy Supplies Limited
13. Renewables NFFO 5 Replacement Power Purchase Agreement non BSC Party Contract 08.03.2001 Philadelphia Power Project Compact Power Limited
14. Renewables NFFO 5 Replacement Power Purchase Agreement non BSC Party Contract 08.03.2001 Chapel Renewable Energy Centre Veolia es Aurora Limited
15. Renewables NFFO 5 Replacement Power Purchase Agreement BSC Exemptible Contract 08.03.2001 Windwhistle Energy Project Atlantic Energy Limited
16. Renewables NFFO 5 Replacement Power Purchase Agreement BSC Exemptible Contract 08.03.2001 Dolcoath Energy Atlantic Energy Limited
Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Electricity from Non-Fossil Fuel Sources Arrangements (England and Wales) Order 2006 (2006/2388)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application
generatorart. 2.generator_rtl2FTc
new arrangementsart. 2.new_arrang_rtCvdSc
NFFO 4 Orderart. 2.NFFO_4_Ord_rtPf2Xf
NFFO 5 Orderart. 2.NFFO_5_Ord_rtBnpHR
NFFO Savings Orderart. 2.NFFO_Savin_rtvuldW
nominated personart. 2.nominated__rtkx1AY
relevant contractsart. 2.relevant_c_rttoCDa

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.