Statutory Instruments
2008 No. 2253
HIGHWAYS, ENGLAND
The A1 Motorway (Dishforth to Barton Section and Connecting Roads) Scheme 2008
Made
18th August 2008
Coming into force
25th September 2008
1. This Scheme may be cited as the A1 Motorway (Dishforth to Barton Section and Connecting Roads) Scheme 2008 and shall come into force on 25th September 2008.
2. In this Schemeβ
(1) All measurements of distance are measured along the route of the relevant highway:
(i) βconnecting roadβ means a special road along a route described in Schedule 3 to this Scheme;
(ii) βthe Motorwayβ means a special road along a route described in Schedules 1 and 2 to this Scheme;
(iii) βthe planβ means the plan folio, containing 6 site plans bound together and respectively numbered 1 to 6, numbered HA.16/MP/11, marked βThe A1 Motorway (Dishforth to Barton Section and Connecting Roads) Scheme 2008β, signed by authority of the Secretary of State for Transport and deposited at Communities & Local Government Deposited Document Services, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex TN37 7GA; and
(iv) βthe special roadsβ means the Motorway and each connecting road.
3. The Secretary of State is authorised to provide the special roads for the exclusive use of traffic of Classes I and II of the classes of traffic set out in Schedule 4 to the Highways Act 1980.
4. The centre line of each of the special roads is indicated by a heavy black line on the plan.
5. Each of the special roads shall become a trunk road on the date when this Scheme comes into force.
6. The A1 Motorway (North of Leeming to Scotch Corner and Connecting Roads) Scheme 1996( 3 ) is hereby revoked.
Signed by authority of the Secretary of State for Transport
John Bagley
Divisional Director Highways Agency
18th August 2008
SCHEDULE 1 ROUTE OF THE MOTORWAY
The route of the motorway is about 10.47 kilometres in length, which follows the route of the existing A1 from a point 410 metres north of where it crosses the C233 Dishforth Road, (marked βAβ on the plan numbered 1 in the deposited plan) in the County of North Yorkshire, then going in a generally north-north-westerly direction to a point on the existing A1 trunk road, 188 metres north of Street Lane, (marked βBβ on the plan numbered 2 in the deposited plan) in the County of North Yorkshire.
The route of the motorway is about 14.33 kilometres in length, which follows the route of the existing A1 from a point 240 metres north of Healam Beck, (marked βCβ on the plan numbered 2 in the deposited plan) in the County of North Yorkshire, then going in a generally north-north-westerly direction to a point on the existing A1 trunk road 160 metres north of Leases Lane, (marked βDβ on the plan numbered 5 in the deposited plan) in the County of North Yorkshire.
The route of the motorway is about 10.69 kilometres in length, which follows the route of the existing A1 from a point 10 metres south of Manor House Bridge, (marked βEβ on the plan numbered 5 in the deposited plan) in the County of North Yorkshire, then going in a generally north-north-westerly direction to a point on the existing A1 trunk road 350 metres south of the centre of Barton Interchange, (marked βFβ on the plan numbered 6 in the deposited plan) in the County of Durham.
SCHEDULE 2 ROUTE OF THE MOTORWAY
The route of the motorway is about 1.22 kilometres in length from a point 150 metres north of Street Lane, (marked βBβ on the plan numbered 2 in the deposited plan) in the County of North Yorkshire, then going in a generally north-north-westerly direction to a point 240 metres north of Healam Beck, (marked βCβ on the plan numbered 2 in the deposited plan) in the County of North Yorkshire. The route of the motorway is about 2.22 kilometres in length from a point 160 metres north of Leases Lane, (marked βDβ on the plan numbered 5 in the deposited plan) in the County of North Yorkshire, then going in a generally north-north-westerly direction to a point 10 metres south of Manor House Bridge, (marked βEβ on the plan numbered 5 in the deposited plan) in the County of North Yorkshire.
SCHEDULE 3 ROUTES OF THE CONNECTING ROADS
The routes of the connecting roads are routes in the Districts of Harrogate, Hambleton and Richmondshire, all in the County of North Yorkshire as followsβ
(1) Junction with the C233 at Dishforth
One route to connect the northbound carriageway of the motorway and one route to connect the southbound carriageway of the motorway, both with the C233 at Dishforth, (the special roads along these routes being given the reference numbers 1 and 2 on the plan numbered 1 in the deposited plan).
(2) Junction with the A61 at Baldersby
Two routes to connect the northbound carriageway of the motorway with the A61, as proposed to be improved, (the special roads along these routes being given the reference numbers 3 and 4 on the plan numbered 1 in the deposited plan) and two routes to connect the southbound carriageway of the motorway with the A61, as proposed to be improved, (the special roads along these routes being given the reference numbers 5 and 6 on the plan numbered 1 in the deposited plan);
(3) Junction north of the A684
Two routes to connect the northbound carriageway of the motorway with a roundabout to be constructed as part of the new Leeming Junction, (the special roads along these routes being given the reference numbers 7 and 8 on the plan numbered 4 in the deposited plan) and two routes to connect the southbound carriageway of the motorway with a roundabout to be constructed as part of the new Leeming Junction, (the special roads along these routes being given the reference numbers 9 and 10 on the map numbered 4 in the deposited plan);
(4) Junction at Catterick Central
Two routes to connect the northbound carriageway of the motorway with a roundabout to be constructed as part of the new Catterick Central Junction, (the special roads along these routes to be given the reference numbers 11 and 12 on the plan numbered 5 in the deposited plan) and two routes to connect the southbound carriageway of the motorway with a roundabout to be constructed as part of the new Catterick Central Junction, (the special roads along these routes to be given the reference numbers 13 and 14 on the plan numbered 5 in the deposited plan).
(5) Junction with the B6275 at Barton
One route to connect the northbound carriageway of the motorway and one route to connect the southbound carriageway of the motorway, both with the existing roundabout at Barton (the special roads along these routes being given the reference numbers 15 and 16 on the plan numbered 6 in the deposited plan).