Loading…eh

🔆 📖 👤

Statutory Instruments

2008 No. 2988

HIGHWAYS, ENGLAND

The Council of the City of Wakefield (Wakefield Waterfront Hepworth Gallery Footbridge) Scheme 2008 Confirmation Instrument 200

Made

13th November 2008

Coming into force in accordance with article 1

The Secretary of State for Transport makes this Instrument in exercise of powers conferred by section 106(3) of the Highways Act 1980 ( 1 )and now vested in him( 2 ).

1. This Instrument may be cited as “The Council of the City of Wakefield (Wakefield Waterfront Hepworth Gallery Footbridge) Scheme 2008 Confirmation Instrument 2008” and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.

2. The Council of the City of Wakefield (Wakefield Waterfront Hepworth Gallery Footbridge) Scheme 2008 (“the Scheme”) is hereby confirmed with modifications.

3. The Scheme as confirmed is set out in the Schedule hereto (including the plans) and copies of the Scheme with its accompanying plans as modified are deposited at the offices of the Department for Transport, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex TN37 7GA, and at the offices of the Council of the City of Wakefield, Reception Desk, County Hall, Wakefield WF1 2QW.

Signed by authority of the Secretary of State for Transport

J Blackie

Regional Director, Government Office for the North East

13th November 2008

THE SCHEDULE

The Council of the City of Wakefield (hereinafter referred to as “the Council” makes this Scheme in exercise of their powers under section 106(3) of the Highways Act 1980 and all other powers enabling them in that behalf.

1. The Council are authorised to construct over the navigable waters of the River Calder the footbridge specified in the Schedule to this Scheme as part of the highway which is to be constructed between Thornes Lane and the Hepworth Gallery in the Metropolitan District of Wakefield.

2. The Scheme may be cited as the Council of the City of Wakefield (Wakefield Waterfront Hepworth Gallery Footbridge) Scheme 2008.

THE SCHEDULE TO THE SCHEME

PLANS AND SPECIFICATIONS OF THE FOOTBRIDGE

The location and general design of the Footbridge are shown on the plan numbered DWG No. 3346 and marked “The Council of the City Wakefield (Wakefield Waterfront Hepworth Gallery Footbridge) Scheme 2008”.

POINTS OF COMMENCEMENT AND TERMINATION

THORNES LANE APPROACH_FROM THRESHOLD

From a point along the northern bank of the River Calder (on Thornes Lane) 106.15 metres west of the top north western parapet of the New Wakefield Bridge and 62.9 metres south. (126.5 metres measured in a direct line, point to point.)

HEPWORTH GALLERY APPROACH_FROM THRESHOLD

To a point on the south bank of the River Calder, 98.55 metres south of the top north western parapet of the New Wakefield Bridge and 69.89 metres west. (122.12 metres measured in a direct line, point to point.)

SPAN

The footbridge is 50.8 metres long, with a single clear span of 43.6 metres.

HEADWAY

Not less than 3.66 metres above normal water level of 22.11 metres A.O.D. over the whole waterway.

WATERWAY

The entire navigable width of the waterway is maintained.

( 1 )

1980 c. 66 .

( 2 )

S.I. 1981/238

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Council of the City of Wakefield (Wakefield Waterfront Hepworth Gallery Footbridge) Scheme 2008 Confirmation Instrument 200 (2008/2988)
Version from: original only

Displaying information

Status of this instrument

in force Provision is in force
in force* In force only for specified purposes (see footnote)
not in force Not in force in England (may be in force in other geographies, see footnotes)
defined term Defined term
dfn Defined term (alternative style)
footnote commentary transitional and savings in force status related provisions geo extent insert/omit source count in force adj
Defined Term Section/Article ID Scope of Application
the Council para THE SCHEDULE def_96fbfcb27f
the Scheme Unknown def_ffc52d05f0

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.

Contains public sector information licensed under the Open Government Licence v3.0.