Loading…eh

🔆 📖 👤

Statutory Instruments

2009 No 16

Electronic Communications

The Wireless Telegraphy (Crown Recognised Spectrum Access) Regulations 2009

Made

9th January 2009

Coming into force

23rd January 2009

The Office of Communications (“OFCOM”) make the following Regulations in exercise of the powers conferred by section 18(1)(b) and Schedule 2, paragraph 1 of the Wireless Telegraphy Act 2006( 1 ) (“the Act”).

Before making the Regulations OFCOM have given notice of their proposal to do so in accordance with section 122(4)(a) of the Act, published notice of their proposal in accordance with section 122(4)(b) of the Act and have considered the representations made to them before the time specified in the notice in accordance with section 122(4)(c) of the Act.

Citation, commencement and extent

1. —(1) These Regulations may be cited as the Wireless Telegraphy (Crown Recognised Spectrum Access) Regulations 2009 and shall come into force on 23rd January 2009.

(2) These Regulations shall not extend to the Channel Islands or to the Isle of Man.

Circumstances of use

2. The circumstances of the use of a wireless telegraphy station or wireless telegraphy apparatus, specified for the purpose of section 18(1)(b) of the Wireless Telegraphy Act 2006, are circumstances where the station or apparatus is operated within any of the frequency bands listed in the Schedule by or on behalf of the Crown.

Time limit for dealing with grants of recognised spectrum access

3. A decision on an application for a grant of recognised spectrum access which is made to the Office of Communications (“OFCOM”) will be made, notified to the applicant and published not more than six weeks after the day of the receipt of the application by OFCOM.

Requirements that must be met for a grant of recognised spectrum access

4. —(1) Before a grant of RSA is made, OFCOM must receive an application by or on behalf of the Crown which contains—

(a) the name and address of the person applying; and

(b) the frequency band in the Schedule in respect of which it is proposed that the grant is made.

Restrictions and conditions to which a grant of recognised spectrum access is subject

5. A grant of recognised spectrum access may be subject to—

(a) a condition providing for the duration of the grant;

(b) a restriction on the exercise by OFCOM of their power to revoke or modify the grant;

(c) a condition requiring payment of fees; and

(d) conditions describing the limits of the use of the electromagnetic spectrum which is recognised by the grant by reference to—

(i) the location of the wireless telegraphy station or wireless telegraphy apparatus;

(ii) the purpose of use of the electromagnetic spectrum;

(iii) the frequencies for that use; and

(iv) the strength and type of signal.

Ed Richards

Chief Executive of the Office of Communications

for and by the authority of the Office of Communications

9th January 2009

Regulation 2

SCHEDULE

Frequency bands

406.1–410 Megahertz

410–412 Megahertz

414–420 Megahertz

420–422 Megahertz

424–425 Megahertz

429–430 Megahertz

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Wireless Telegraphy (Crown Recognised Spectrum Access) Regulations 2009 (2009/16)
Version from: original only

Displaying information

Status of this instrument

in force Provision is in force
in force* In force only for specified purposes (see footnote)
not in force Not in force in England (may be in force in other geographies, see footnotes)
defined term Defined term
dfn Defined term (alternative style)
footnote commentary transitional and savings in force status related provisions geo extent insert/omit source count in force adj
Defined Term Section/Article ID Scope of Application
OFCOM Preamble def_0e0ed73a5b
OFCOM reg. 3. def_d36950ca38
the Act Preamble def_f6ff6b24ed

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.

Contains public sector information licensed under the Open Government Licence v3.0.