Statutory Instruments

2010 No. 3032

Highways, England

The Cornwall Council (Hayle North Quay) Bridge Scheme 2010 Confirmation Instrument 2010

Made

16th December 2010

Coming into force in accordance with article 1

The Secretary of State for Transport makes this Instrument in exercise of powers conferred by section 106(3) of the Highways Act 1980( 1 ) and now vested in the Secretary of State( 2 ):

1. This Instrument may be cited as β€œThe Cornwall Council (Hayle North Quay) Bridge Scheme 2010 Confirmation Instrument 2010 ” and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.

2. The Cornwall Council (Hayle North Quay) BridgeScheme 2010 (β€œthe Scheme”) is hereby confirmed without modifications.

3. The Scheme as confirmed is set out in the Schedule hereto (including the plan) and copies of the Scheme with its accompanying plan are deposited at the offices of the Department for Transport, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex, TN37 7GA, and at the offices of the Cornwall Council at New County Hall, Treyew Road, Truro, Cornwall, TR1 3AY; and the Penzance Offices, St Clare, Penzance, Cornwall TR18 3QW.

Signed by authority of the Secretary of State for Transport

J. Blackie

Director

Government Office for the North East

16th December 2010

THE SCHEDULE THE CORNWALL COUNCIL (HAYLE NORTH QUAY) BRIDGE SCHEME 2010

The Cornwall Council (hereinafter referred to as β€œthe Council”) make this scheme in exercise of their powers under section 106(3) of the Highways Act 1980 and of all other powers enabling them in that behalf.

1. The Council are authorised to construct over the navigable waters of Hayle Harbour the bridge specified in the schedule to this Scheme as part of the highway they are proposing to construct between Merchant Curnows Quay, Copperhouse, Hayle and the Renewable Energy Business Park, Hayle Habour, Cornwall.

2. This Scheme may be cited as The Cornwall Council (Hayle North Quay) BridgeScheme 2010.

THE SCHEDULE TO THE SCHEME PLANS AND SPECIFICATIONS OF THE HAYLE NORTH QUAY BRIDGE

The location and general design of the Bridge are shown on the attached plan and marked β€œThe Cornwall Council (Hayle North Quay) Bridge Scheme 2010” sealed with the Common Seal of the Council and deposited at the offices of Cornwall Council, County Hall, Treyew Road, Truro, Cornwall, TR1 3AY and at the Department for Transport, Local Authority Orders, Wellbar House, Gallowgate, Newcastle Upon Tyne, NE1 4TD.

POINTS OF COMMENCEMENT AND TERMINATION

From a point on Merchant Quay, Copperhouse Hayle, 78m west of the junction of St Elwyns Rise with Hayle Terrace (B3301) to a point on North Quay 105m south-east of the junction of King George V Memorial Walk with North Quay Road.

SPANS

The bridge will consist of 3 spans, a northern span of 18.7m, a central span of 20.5m and a southern span of 14.7m giving an overall length of 53.9m.

HEADWAY

Not less than 0.8m above a mean high water springs level of 3.2m above Ordnance datum.

WATERWAY

A minimum clear navigable waterway beneath the centre span of 14.3m.

OVERALL DIMENSIONS

The bridge will accommodate a single two lane carriageway, a footway and a maintenance strip. The bridge will be 10.5m wide at its widest point and will carry a 6.0m wide carriageway, with a 2.5m wide footway to the east of the carriageway and 0.5m maintenance strip on the west of the carriageway.

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Cornwall Council (Hayle North Quay) Bridge Scheme 2010 Confirmation Instrument 2010 (2010/3032)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application
The Cornwall Council (Hayle North Quay) Bridge Scheme 2010 Confirmation Instrument 2010UnknownThe_Cornwa_rtKFdWC
the Councilpara THE SCHEDULEthe_Counci_rtRu2DT
the SchemeUnknown(β€œ_prnpYSCn

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.