Statutory Instruments

2011 No. 1150

Electricity

The Electricity (Individual Generation Exemptions) Order 2011

Made

26th April 2011

Laid before Parliament

27th April 2011

Coming into force

18th May 2011

The Secretary of State makes the following Order in exercise of the powers conferred by section 5 of the Electricity Act 1989( 1 ).

The Secretary of State has given notice of the proposal to make this Order in accordance with section 5(2) and (3) of that Act. No representations in respect of the proposal have been made.

Citation and commencement

1. This Order may be cited as the Electricity (Individual Generation Exemptions) Order 2011 and comes into force on 18th May 2011.

Interpretation

2. In this Orderβ€”

β€œthe Act” means the Electricity Act 1989;

β€œtotal system” means all transmission systems and distribution systems, located in Great Britain, of holders of licences under section 6(1)(b) and (c) of the Act( 2 ) (transmission and distribution licences).

Exemptions

3. β€”(1) Subject to paragraph (2), a person mentioned in column 1 of the Table in the Schedule (β€œthe relevant person”) is exempt from section 4(1)(a) of the Act (prohibition of unlicensed generation of electricity for supply) in respect of the generating station described in the corresponding entry in column 2 of that Table (β€œthe relevant generating station”).

(2) The exemption granted in paragraph (1) is subject to compliance with the following conditionsβ€”

(a) that the relevant generating station is connected to the total system;

(b) that, except in circumstances outside the reasonable control of the relevant person, the relevant generating station does not export more than 100 megawatts of electrical power to the total system; and

(c) that the relevant person does not hold any licence under section 6(1)(a) of the Act.

Charles Hendry

Minister of State

Department of Energy and Climate Change

26th April 2011

Article 3

SCHEDULE

Table

Column 1 Column 2
Devon Wind Power Limited (company registered number 03536976) Fullabrook Windfarm, a generating station of that name located at Ordnance Survey map reference SS526363, on Fullabrook Down in Devon.
Riverside Resource Recovery Limited (company registered number 3723386). Riverside Resource Recovery Energy From Waste Facility, a generating station of that name located at Ordance Survey map reference TQ497806, in Belvedere in the London Borough of Bexley.
Teeside Windfarm Limited (company registered number 6708759). Teeside Offshore Windfarm, an offshore generating station of that name located at Ordnance Survey map reference NZ584282, approximately 1.5 kilometres offshore from Coatham Sands in Redcar.
( 1 )

1989 c.29 . Section 5 was substituted by section 29 of the Utilities Act 2000 (c.27) .

( 2 )

Section 6 was substituted by section 30 of the Utilities Act 2000.

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Electricity (Individual Generation Exemptions) Order 2011 (2011/1150)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application
the Actart. 2.the_Act_rtWG5t0
the relevant generating stationart. 3.(β€œ_prnsOJnn
the relevant personart. 3.the_releva_rt1Z8qY
total systemart. 2.total_syst_rtFCVUd

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.