Energy Conservation

The Green Deal (Qualifying Energy Improvements) Order 2012

Made

6th August 2012

Coming into force

28th January 2013

A draft of this instrument has been laid before Parliament in accordance with section 40(5) of the Energy Act 2011( 1 ) and approved by a resolution of each House of Parliament.

To the extent required by section 40(8)(a) of the Energy Act 2011, the Scottish Ministers have given consent and in accordance with section 40(8)(b) they have been consulted.

The Welsh Ministers have been consulted in accordance with section 40(12) of the Energy Act 2011.

Accordingly, the Secretary of State, in exercise of the power conferred by section 1(4)(b) of the Energy Act 2011, makes the following Order:

Citation and commencement

1. This Order may be cited as the Green Deal (Qualifying Energy Improvements) Order 2012 and comes into force on 28th January 2013.

Interpretation

2. In this Orderβ€”

β€œthe Act” means the Energy Act 2011;

β€œbiomass” means material, other than fossil fuel or peat, which is, or is derived directly or indirectly from, plant matter, animal matter, fungi or algae;

β€œmicro combined heat and power” means a combined heat and power system with an electrical capacity of 50 kilowatts or less;

β€œmicro wind generation” means a wind turbine or turbines with a nominal output of 300 watts or more but no more than 50 kilowatts measured at a wind speed of 11m/s.

Qualifying energy improvements under section 1(4)(b) of the Act

3. The energy efficiency improvements in the Schedule to this Order are specified for the purposes of section 1(4)(b) of the Act as qualifying energy improvements.

Edward Davey

Secretary of State

Department of Energy and Climate Change

6th August 2012

Article 3

SCHEDULE Qualifying energy improvements

The energy efficiency improvements specified by article 3 areβ€”

(a) air source heat pumps;

(b) biomass boilers;

(c) biomass room heaters (with radiators);

(d) cavity wall insulation;

(e) chillers;

(f) cylinder thermostats;

(g) draught proofing;

(h) duct insulation;

(i) gas-fired condensing boilers;

(j) ground source heat pumps;

(k) hot water showers;

(l) hot water systems;

(m) hot water taps;

(n) external wall insulation systems;

(o) fan-assisted storage heaters;

(p) flue gas heat recovery devices;

(q) heating controls for wet central heating systems or warm air systems;

(r) heating ventilation and air-conditioning controls (including zoning controls);

(s) high performance external doors;

(t) hot water controls (including timers and temperature controls);

(u) hot water cylinder insulation;

(v) internal wall insulation systems (for external walls);

(w) lighting systems, fittings and controls (including rooflights, lamps and luminaires);

(x) loft or rafter insulation (including loft hatch insulation);

(y) mechanical ventilation with heat recovery systems;

(z) micro combined heat and power;

(aa) micro wind generation;

(bb) oil-fired condensing boilers;

(cc) photovoltaics;

(dd) pipework insulation;

(ee) radiant heating;

(ff) replacement glazing;

(gg) roof insulation;

(hh) room in roof insulation;

(ii) sealing improvements (including duct sealing);

(jj) secondary glazing;

(kk) solar blinds, shutters and shading devices;

(ll) solar water heating;

(mm) transpired solar collectors;

(nn) under-floor heating;

(oo) under-floor insulation;

(pp) variable speed drives for fans and pumps;

(qq) warm-air units;

(rr) waste water heat recovery devices attached to showers;

(ss) water source heat pumps.

( 1 )

2011 c.16 .

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Green Deal (Qualifying Energy Improvements) Order 2012 (2012/2105)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application
biomassart. 2.biomass_rt6xaNt
micro combined heat and powerart. 2.micro_comb_rt1L0I7
micro wind generationart. 2.micro_wind_rtJrqzu
the Actart. 2.the_Act_rtyFDz0
This instrument is derived from the version at www.legislation.gov.uk. To see a list of all amendments (including any to be made) check the resources page for this instrument on their website. Note, the status of this instrument is given above.
This instrument is derived from the version at www.legislation.gov.uk. To see original commencement information, check the resources page associated with this instrument. n.b. commencement information for marked amendments is embedded in the relevant footnote.

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.