Statutory Instruments
2012 No. 2706
Highways, England
The Sunderland City Council (Sunderland Strategic Transport Corridor – New Wear Bridge) Scheme 2009 Confirmation Instrument 2012
Made
18th October 2012
Coming into force in accordance with article 1
1. This Instrument may be cited as The Sunderland CityCouncil (Sunderland Strategic Transport Corridor – New Wear Bridge) Scheme 2009 Confirmation Instrument 2012 and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.
2. The Sunderland CityCouncil (Sunderland Strategic Transport Corridor – New Wear Bridge) Scheme 2009 Confirmation Instrument 2012 (“the Scheme”) is hereby confirmed with modifications.
3. The Scheme as confirmed is set out in the Schedule hereto (including the plans) and copies of the Scheme with its accompanying plans as modified are deposited at the offices of the Department for Transport, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex, TN37 7GA, and at the offices of Sunderland CityCouncil at Civic Centre, Sunderland, SR2 7DN.
Signed by authority of the Secretary of State for Transport
M R Fawcett
A Senior Civil Servant in the
Department for Transport
18th October 2012
THE SCHEDULE Highways Act 1980, Section 106(3)
The Sunderland City Council (Sunderland Strategic Transport Corridor – New Wear Bridge) Scheme 2009
The Council of the City of Sunderland (“the Council”) make this Scheme in exercise of their powers under Section 106(3) of the Highways Act 1980 and of all other powers enabling them in that behalf:-
2. This Scheme may be cited as The Sunderland CityCouncil (Sunderland Strategic Transport Corridor – New Wear Bridge) Scheme 2009.
Given under the seal of the Council on the 4th day of November 2009
THE SEAL of THE COUNCIL OF THE CITY OF SUNDERLAND was hereunto affixed in the presence of:-
R C Rayner
Authorised Signatory
THE SCHEDULE TO THE SCHEME PLAN AND SPECIFICATIONS OF THE NEW WEAR BRIDGE
The location and general design of the Bridge are shown on the plans numbered 8132/100 and 8132/101 marked The Sunderland CityCouncil (Sunderland Strategic Transport Corridor – New Wear Bridge) Scheme 2009.
POINTS OF COMMENCEMENT AND TERMINATION
From a point on the South Bank of the River Wear 155 metres east of the centre of the roundabout junction between A1231 Wessington Way and Castletown Way located on the north bank.
To a point on the North Bank of the River Wear 30 metres east of the centre of the roundabout junction between A1231 Wessington Way and Castletown Way.
SPAN
A double span of 336 metres overall.
HEADWAY
Not less than 12.9 metres above the mean high water spring tide level (MHWS) of 2.5 metres AOD.
WATERWAY
A minimum clear navigable waterway of 30 metres.
OVERALL DIMENSIONS
The Bridge will be 25.2 metres wide overall and will carry a dual 7.3 metre wide carriageway with a 1.8 metre central reserve with a footway of 2 metres width on the east side, separated from the carriageway by a 1 metre median, and a footway and cycleway of 4 metres width on the west side of the structure, separated from the carriageway by a 1 metre median.