2012 No. 2710

Highways, England

The Sunderland City Council (Sunderland Strategic Transport Corridor – Temporary Works New Wear Bridge) Scheme 2009 Confirmation Instrument 2012

Made

18th October 2012

Coming into force in accordance with article 1

The Secretary of State for Transport makes this Instrument in exercise of powers conferred by section 106(3) of the Highways Act 1980( 1 ) and now vested in the Secretary of State( 2 ):

1. This Instrument may be cited as “The Sunderland CityCouncil (Sunderland Strategic Transport Corridor – Temporary Works New Wear Bridge) Scheme 2009 Confirmation Instrument 2012” and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.

2. The Sunderland CityCouncil (Sunderland Strategic Transport Corridor – Temporary Works New Wear Bridge) Scheme 2009 Confirmation Instrument 2012 (“the Scheme”) is hereby confirmed with modifications.

3. The Scheme as confirmed is set out in the Schedule hereto (including the plans) and copies of the Scheme with its accompanying plans as modified are deposited at the offices of the Department for Transport, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex, TN37 7GA, and at the offices of Sunderland CityCouncil at Civic Centre, Sunderland, SR2 7DN.

Signed by authority of the Secretary of State for Transport

M R Fawcett

A Senior Civil Servant in the

Department for Transport

18th October 2012

THE SCHEDULE Highways Act 1980, Section 106(3)

The Sunderland City Council (Sunderlnd Strategic Transport Corridor – Temporary Works New Wear Bridge) Scheme 2009

The Council of the City of Sunderland (“the Council”) make this Scheme in exercise of their powers under Section 106(3) of the Highways Act 1980 and of all other powers enabling them in that behalf:-

1. The Council are authorised to construct over the navigable waters of the River Wear the bridge specified in the Schedule to this Scheme as part of the highway which they are proposing to construct/improve between the Wessington Way/Castletown Way roundabout and the Woodbine Terrace/Pallion New Road junction in the City of Sunderland.

2. This Scheme may be cited as The Sunderland CityCouncil (Sunderland Strategic Transport Corridor – Temporary Works New Wear Bridge) Scheme 2009.

Given under the seal of the Council on the 4th day of November 2009

THE SEAL of THE COUNCIL OF THE CITY OF SUNDERLAND was hereunto affixed in the presence of:-

R C Rayner

Authorised Signatory

THE SCHEDULE TO THE SCHEME PLAN AND SPECIFICATIONS OF THE NEW WEAR BRIDGE

The location and general design of the Bridge are shown on the plans numbered 8132/107 and 8132/705 marked The Sunderland CityCouncil (Sunderland Strategic Transport Corridor – Temporary Works New Wear Bridge) Scheme 2009.

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Sunderland City Council (Sunderland Strategic Transport Corridor – Temporary Works New Wear Bridge) Scheme 2009 Confirmation Instrument 2012 (2012/2710)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application
the Councilpara THE SCHEDULE(“_prnxHA4i
the SchemeUnknown(“_prne6kDH

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.