2013 No. 2429

Electricity

Gas

The Electricity and Gas Appeals (Designation and Exclusion) Order 2013

Made

24th September 2013

Laid before Parliament

26th September 2013

Coming into force

21st October 2013

The Secretary of State, in exercise of the powers conferred by section 173(2)(b) and (d), and (7) of the Energy Act 2004( 1 ), and having consulted the Gas and Electricity Markets Authority( 2 ) and such other persons as the Secretary of State considers appropriate, makes the following Order:

Citation and commencement

1. This Order may be cited as the Electricity and Gas Appeals (Designation and Exclusion) Order 2013 and comes into force on 21st October 2013.

Interpretation

2. In this Orderβ€”

β€œthe Act” means the Energy Act 2004;

β€œChange Board” has the same meaning as in section A1 of the Smart Energy Code;

β€œPanel” has the same meaning as in section A1 of the Smart Energy Code;

β€œPath 1 Modification” has the same meaning as in section A1 of the Smart Energy Code;

β€œPath 2 Modification” has the same meaning as in section A1 of the Smart Energy Code;

β€œPath 3 Modification” has the same meaning as in section A1 of the Smart Energy Code;

β€œSmart Energy Code” means the document of that title required to be maintained and in force pursuant to condition 21 of the smart meter communication licences( 3 ); and

β€œsmart meter communication licences” meansβ€”

(a)

the licence granted to Smart DCC Limited( 4 ) on 20th September 2013 under section 7AB(2) of the Gas Act 1986( 5 ); and

(b)

the licence granted to Smart DCC Limited on 20th September 2013 under section 6(1A) of the Electricity Act 1989( 6 ).

Designation of Smart Energy Code

3. The Smart Energy Code is designated for the purposes of section 173 of the Act.

Exclusion of decisions

4. β€”(1) A right of appeal under section 173 of the Act is excluded in respect of a decision by GEMA relating to the Smart Energy Code whereβ€”

(a) the decision accords withβ€”

(i) a recommendation by the relevant body in respect of a Path 1 Modification or a Path 2 Modification; or

(ii) a decision by the Panel in respect of a Path 3 Modification; or

(b) GEMA determines that the delay caused by the holding of the appeal against that decision is likely to have a material adverse effect on the availability of electricity or gas for meeting the reasonable demands of consumers in Great Britain.

(2) Where GEMA makes a determination under paragraph (1)(b), it shall give notice of the determination in such manner as it considers appropriate for the purpose of bringing it to the attention of persons likely to be interested in it.

(3) In paragraph (1)(a)(i), β€œrelevant body” meansβ€”

(a) the Change Board where, in accordance with section D8.1 of the Smart Energy Code, the Change Board has been established; or

(b) the Panel where, in accordance with section X2.3(d) of the Smart Energy Code, the Change Board has not been established and the Panel is performing the functions of the Change Board.

Verma

Parliamentary Under Secretary of State

Department of Energy and Climate Change

24th September 2013

( 1 )

2004 c.20 . Section 173 was amended by section 81(4) of the Energy Act 2011 (c.16) .

( 2 )

The Gas and Electricity Markets Authority, referred to as β€œGEMA” in accordance with section 196 of the Energy Act 2004, was established by section 1 of the Utilities Act 2000 (c.27) .

( 3 )

The Smart Energy Code came into force on 23rd September 2013 and is available at www.gemserv.com .

( 4 )

A company registered in England and Wales with number 08641679.

( 5 )

1986 c.44 . Section 7AB was inserted by the Electricity and Gas (Smart Meters Licensable Activity) Order 2012 ( S.I.2012/2400 ), Part 3, article 21. A smart meter communication licence authorises the carrying out of a smart meter communication service within the meaning of section 5(1)(d) of the Gas Act 1986.

( 6 )

1989 c.29 . Section 6 was substituted by the Utilities Act 2000 (c.27) , section 30, and section 6(1A) was inserted by the Electricity and Gas (Smart Meters Licensable Activity) Order 2012 ( S.I. 2012/2400 ), Part 2, article 6(3). A smart meter communication licence authorises the carrying out of a smart meter communication service within the meaning of section 4(1)(e) of the Electricity Act 1989.

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Electricity and Gas Appeals (Designation and Exclusion) Order 2013 (2013/2429)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application
Change Boardart. 2.Change_Boa_rt9YVcq
Panelart. 2.Panel_rtOdKLB
Path 1 Modificationart. 2.Path_1_Mod_rtj7PD1
Path 2 Modificationart. 2.Path_2_Mod_rtyYrqM
Path 3 Modificationart. 2.Path_3_Mod_rtNo7hh
relevant bodyart. 4.relevant_b_rtOcVdE
Smart Energy Codeart. 2.Smart_Ener_rtwTaZO
smart meter communication licencesart. 2.smart_mete_rtGbgtx
the Actart. 2.the_Act_rtfkG2h
This instrument is derived from the version at www.legislation.gov.uk. To see a list of all amendments (including any to be made) check the resources page for this instrument on their website. Note, the status of this instrument is given above.
This instrument is derived from the version at www.legislation.gov.uk. To see original commencement information, check the resources page associated with this instrument. n.b. commencement information for marked amendments is embedded in the relevant footnote.

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.