๐Ÿ”† ๐Ÿ“– โž• ๐Ÿ‘ค

Statutory Instruments

2013 No. 426

Electricity, England And Wales

The Electricity (Exemption from the Requirement for a Generation Licence) (Middlemoor) (England and Wales) Order 2013

Made

25th February 2013

Laid before Parliament

28th February 2013

Coming into force

28th March 2013

The Secretary of State makes the following Order in exercise of the powers conferred by section 5 of the Electricity Act 1989( 1 ).

In accordance with section 5(2) and (3) of that Act the Secretary of State has given notice of the proposal to make this Order. No representations in respect of the proposal have been made.

Citation, commencement and extent

1. โ€”(1) This Order may be cited as the Electricity (Exemption from the Requirement for a Generation Licence) (Middlemoor) (England and Wales) Order 2013 and shall come into force on 28th March 2013.

(2) This Order extends to England and Wales only.

Interpretation

2. In this Orderโ€”

โ€œthe Actโ€ means the Electricity Act 1989;

โ€œMiddlemoor Wind Farmโ€ means the generating station located at Ordnance Survey map reference NU153227, approximately 12 kilometres north of Alnwick in Northumberland;

โ€œRWE Npower Renewables Limitedโ€ means the company of that name registered in England and Wales with company number 02550622; and

โ€œthe total system in England and Walesโ€ meansโ€”

(a)

the transmission system of the holder of a licence under section 6(1)(b) of the Act; and

(b)

all distribution systems,

in each case, to the extent located in England and Wales.

Exemption from section 4(1)(a) of the Act

3. Subject to article 4, exemption is granted from section 4(1)(a) of the Act (prohibition on unlicensed generation of electricity for supply) to RWE Npower Renewables Limited in respect of Middlemoor Wind Farm.

Conditions on exemption

4. The exemption granted by article 3 is subject to compliance with the following conditionsโ€”

(a) that RWE Npower Renewables Limited does not hold a licence under section 6(1)(a) of the Act( 2 ) (a generation licence);

(b) that Middlemoor Wind Farm is connected to the total system in England and Wales; and

(c) that Middlemoor Wind Farm is not normally capable of exporting more than 100 megawatts to the total system in England and Wales disregarding power temporarily provided in excess of 100 megawatts due to technical circumstances outside the reasonable control of RWE Npower Renewables Limited.

John Hayes

Minister of State,

Department of Energy and Climate Change

25th February 2013

( 1 )

1989 c.29 ; section 5 was substituted by section 29 of the Utilities Act 2000 (c.27) .

( 2 )

Section 6 was substituted by section 30 of the Utilities Act 2000.

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Electricity (Exemption from the Requirement for a Generation Licence) (Middlemoor) (England and Wales) Order 2013 (2013/426)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application
Middlemoor Wind Farmart. 2.Middlemoor_rtk4OM4
RWE Npower Renewables Limitedart. 2.RWE_Npower_rtytLxP
the Actart. 2.the_Act_rtzpOgQ
the total system in England and Walesart. 2.the_total__rtEUaY4

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.