πŸ”† πŸ“– βž• πŸ‘€

Statutory Instruments

2013 No. 971

Environmental Protection

The Offshore Combustion Installations (Pollution Prevention and Control) Regulations 2013

Made

22nd April 2013

Laid before Parliament

25th April 2013

Coming into force

19th May 2013

Whereas the Secretary of State has consulted the persons required to be consulted by section 2(4) of the Pollution Prevention and Control Act 1999 ;

The Secretary of State, in exercise of the powers conferred by sections 2 and 7(9) of that Act, makes the following Regulations:

PART 1 Introduction

Citation, commencement and review

1. β€”(1) These Regulations may be cited as the Offshore Combustion Installations (Pollution Prevention and Control) Regulations 2013 and come into force on 19th May 2013.

(2) The Secretary of State must from time to timeβ€”

(a) carry out a review of these Regulations;

(b) set out the conclusions of the review in a report; and

(c) publish the report.

(3) The report must in particularβ€”

(a) set out the objectives intended to be achieved by these Regulations;

(b) assess the extent to which those objectives are achieved; and

(c) assess whether those objectives remain appropriate and, if so, the extent to which they could be achieved in a less burdensome way.

(4) The first report under this regulation must be published before the end of the period of five years beginning on the date these Regulations come into force.

(5) Reports under this regulation are afterwards to be published at intervals not exceeding five years.

Interpretation

2. β€”(1) In these Regulationsβ€”

β€œ the 2010 Directive ” means Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions (integrated pollution prevention and control)(Recast) ;

β€œAnnex 1” means Annex I of the MCPD;

β€œAnnex 2” means Annex II of the MCPD;

β€œAnnex 3” means Annex III of the MCPD;

β€œ available techniques ” means those techniques developed on a scale which allows implementation under economically and technically viable conditions, taking into consideration the costs and advantages, whether or not the techniques are used or produced in the United Kingdom, the offshore area or the relevant gas area, as long as they are reasonably accessible to the operator;

β€œ best ” means most effective in achieving a high general level of protection of the environment as a whole;

β€œ best available techniques ” means the most effective and advanced stage in the development of activities and their methods of operation which indicates the practical suitability of particular techniques for providing the basis for emission limit values and other permit conditions designed to prevent and, where that is not practicable, to reduce emissions and the impact on the environment as a whole;

β€œ carbon dioxide storage or unloading platform ” means any fixed or floating structureβ€”

(a)

used for or in connection with an activity within section 17(2) of the Energy Act 2008(β€œa section 17(2) activity”) but not includingβ€”

(i)

a structure the principal purpose of which is an activity within section 17(2)(c) of that Act; or

(ii)

a floating structure unless it is being maintained on station during the course of a section 17(2) activity; and

(b)

where the section 17(2) activity is licensed under section 18 of that Act by the Oil and Gas Authority ;

β€œcombustion installation” means a relevant platform, or a complex of relevant platforms permanently inter-connected by bridges, equipped with offshore combustion plant;

β€œcombustion plant” means any technical apparatus in which fuels are oxidised in order to use the heat generated;

β€œdiesel engine” means an internal combustion engine which operates according to the Diesel cycle and uses compression ignition to burn fuel;

β€œdust” means particles, of any shape, structure or density, dispersed in the gas phase at the sampling point which may be collected by filtration after representative sampling of the gas to be analysed, and which remain on the filter after drying;

β€œ EIA Directive” means Directive 2011/92/EU of the European Parliament and of the Council on the assessment of the effects of certain public and private projects on the environment, as amended by Directive 2014/52/EU of the European Parliament and of the Council;

β€œ emerging technique ” means a novel technique that, if commercially developed, could provideβ€”

(a)

a higher general level of protection of the environment; or

(b)

at least the same level of such protection and higher cost savings,

compared to existing best available techniques;

β€œemission” meansβ€”

(a)

in relation to a large combustion installation, the direct or indirect release of a pollutant listed in Schedule 2 from individual or diffuse sources in the installation into the air or water;

(b)

in relation to a medium combustion plant, the discharge of substances from a medium combustion plant into the air;

β€œemission limit value” meansβ€”

(a)

in relation to a large combustion installation, the mass, concentration or level of an emission, which may not be exceeded during one or more periods of time;

(b)

in relation to a medium combustion plant, the permissible quantity of a substance contained in the waste gases from the combustion plant which may be discharged into the air during a given period;

β€œ enforcement notice ” means, except in regulation 38, a notice given by the Secretary of State under regulation 30;

β€œexisting medium combustion plant” means a medium combustion plantβ€”

(a)

put into operation before 20 December 2018; or

(b)

for which a permit was granted before 19 December 2017, provided that the plant is put into operation no later than 20 December 2018;

β€œ fuel ” means any liquid or gaseous combustible material;

β€œgas engine” means an internal combustion engine which operates according to the Otto cycle and which uses spark ignition to burn fuel;

β€œ Gas Importation and Storage Zone ” has the same meaning as it has in section 1(5) of the Energy Act 2008 ;

β€œ gas storage or unloading platform ” means any fixed or floating structure situated in the relevant gas area β€”

(a)

used for or in connection with an activity within section 2(3) of the Energy Act 2008 except where the principal purpose of the structure is an activity within section 2(3)(e) of that Act; but

(b)

excluding a floating structure which is not being maintained on station during the course of an activity to which paragraph (a) applies;

β€œgas turbine” means any rotating machine which converts thermal energy into mechanical work, consisting mainly of a compressor (a thermal device in which fuel is oxidised in order to heat the working fluid) and a turbine (including both open cycle and combined cycle gas turbines, and gas turbines in cogeneration mode, all with or without supplementary firing);

β€œlarge combustion installation” meansβ€”

(a)

a relevant platform; or

(b)

a complex of relevant platforms permanently inter-connected by bridges,

equipped with an offshore combustion plant which on its own or aggregated together with any other combustion plant on the same platform or complex has a rated thermal input which is equal to or greater than 50 megawatts;;

β€œlarge combustion plant” means an offshore combustion plant with a rated thermal input equal to or greater than 50 megawatts, but does not include gas turbines and gas engines;

β€œthe MCPD” means Directive 2015/2193/EU of the European Parliament and of the Council on the limitation of emissions of certain pollutants into the air from medium combustion plants;

...

β€œmedium combustion installation” meansβ€”

(a)

a relevant platform; or

(b)

a complex of relevant platforms permanently inter-connected by bridges,

which is not a large combustion installation and which is equipped with an offshore combustion plant that has a rated thermal input which is equal to or greater than 1 megawatt and less than 50 megawatts;;

β€œmedium combustion plant” means, subject to regulation 2A, an offshore combustion plant with a rated thermal input which is equal to or greater than 1 megawatt and less than 50 megawatts, but does not includeβ€”

(a)

gas turbines, gas engines and diesel engines; or

(b)

combustion plant in which gaseous products of combustion are used for the direct heating, drying or any other treatment of objects or materials;

β€œ member State ” includes Iceland and Norway;

β€œ mile ” means nautical mile;

β€œnew medium combustion plant” means a medium combustion plant other than an existing medium combustion plant;

β€œNOx” means nitric oxide and nitrogen dioxide;

β€œ offshore area ” means the areas comprisingβ€”

(a)

the sea adjacent to England from the low water mark to the landward baseline of the United Kingdom territorial sea;

(b)

the United Kingdom territorial sea adjacent toβ€”

(i)

England; and

(ii)

Scotland, Wales and Northern Ireland except that part which extends seaward for 3 miles from the landward baseline; and

(c)

the sea in any designated area within the meaning of the Continental Shelf Act 1964 ,

and includes the places above those areas and the bed and subsoil of the sea within those areas;

β€œoffshore combustion installation” means a medium combustion installation or a large combustion installation;

β€œoffshore combustion plant” means a combustion plant which is permanently installed on a relevant platform or complex of relevant platforms permanently inter-connected by bridges;

β€œoperating hours” means the time, expressed in hours, during which a medium combustion plant is operating and discharging emissions into the air, excluding start-up and shut-down periods;

β€œ operator ” means a person who operates or controls, in whole or part, an offshore combustion installation;

β€œ permit ” means a written permission granted by the Secretary of State to operate an offshore combustion installation;

β€œ petroleum ” has the same meaning as it has in section 1 of the Petroleum Act 1998 ;

β€œ petroleum platform ” means any fixed or floating structure situated in the offshore area and used for, or in connection with, the production of petroleum but excludingβ€”

(a)

a floating structure which is not being maintained on station during the course of production; or

(b)

a structure the principal purpose of which isβ€”

(i)

to establish the existence of petroleum;

(ii)

to appraise the characteristics, quality or quantity of petroleum; or

(iii)

to appraise the characteristics or extent of any reservoir in which petroleum occurs;

β€œ pollution ” means the direct or indirect introduction, as a result of human activity, of a pollutant listed in Schedule 2 into a medium, which mayβ€”

(a)

be harmful to human health or the quality of the environment;

(b)

result in damage to material property; or

(c)

impair or interfere with amenities and other legitimate uses of the environment;

β€œ prohibition notice ” means, except in regulation 38, a notice given by the Secretary of State under regulation 31;

β€œrelevant date” meansβ€”

(a)

20th December 2018, in relation to an offshore combustion installation equipped with new medium combustion plant;

(b)

1st January 2024, in relation to an offshore combustion installation equipped with an existing medium combustion plant with a rated thermal input greater than 5 megawatts;

(c)

1st January 2029, in relation to an offshore combustion installation equipped with an existing medium combustion plant with a rated thermal input of not more than 5 megawatts;

β€œ relevant gas area ” means the areas comprisingβ€”

(a)

the sea areas described in paragraphs (a) and (b) of the definition of β€œthe offshore area”; and

(b)

the sea in a Gas Importation and Storage Zone,

and includes the places above those areas and the bed and subsoil of the sea within those areas;

β€œ relevant platform ” means, as appropriate,β€”

(a)

a carbon dioxide storage or unloading platform;

(b)

a gas storage or unloading platform; or

(c)

a petroleum platform;

β€œsecondary abatement” has the same meaning as it has in Article 7(4) of the MCPD;

β€œ surrender offer ” has the meaning given in regulation 17(1);

β€œ techniques ” includes both the technology used and the way in which the offshore combustion installation is designed, built, maintained, operated and decommissioned.

(2) A term used in these Regulations which is not defined in paragraph (1) and which is used in the 2010 Directive, has the same meaning in these Regulations as it has in the 2010 Directive.

(3) Subject to the exception in regulation 11A(b), any provision of the 2010 Directive referred to in these Regulations is to be read as if requirements imposed under the provision on a member State were requirements imposed on the Secretary of State.

Aggregation

2A.β€”(1) For the purpose of these Regulations, two or more new medium combustion plant must be treated as a single medium combustion plant (β€œthe combined plant”), and their rated thermal input added together for the purpose of calculating the total rated thermal input of the combined plant, whereβ€”

(a) the waste gases of the combined plant are discharged through a common stack; or

(b) taking into account technical and economic factors, the waste gases of the combined plant could, in the opinion of the Secretary of State, be discharged through a common stack.

(2) Paragraph (1) applies regardless of whether the total rated thermal input of the combined plant is equal to or greater than 50 megawatts, unless Chapter III of the 2010 Directive applies to the combined plant.

PART 2 Applications for permits and conditions in permits

Permits

3.β€”(1) Subject to paragraph (2), a person must not operate an offshore combustion installationβ€”

(a) without a permit; and

(b) otherwise than in accordance with the conditions in that permit.

(2) Where a permit has yet to be granted in respect of an offshore combustion installation which is equipped with a medium combustion plant, paragraph (1) applies from the relevant date.

(3) A person must apply for a permit in writing to the Secretary of State.

Applications for permits : large combustion installations

4. β€” (1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(2) Where an application for a permit relates to the operation of a large combustion installation, the application must include a description ofβ€”

(a) the offshore combustion installation (β€œthe installation”) and its activities;

(b) the relevant platform comprising the installation ;

(c) the materials, substances and energy used in or generated by the installation;

(d) the sources of emissions from the installation;

(e) the conditions of the site of the installation;

(f) the nature and quantities of foreseeable emissions from the installation into each medium and any significant effects of the emissions on the environment;

(g) the proposed technology and other techniques for preventing or, where this is not possible, reducing emissions from the installation;

(h) where necessary, measures for the prevention and recovery of waste generated by the installation;

(i) measures planned to monitor emissions into the environment;

(j) to the extent not otherwise described, measures planned to comply with the principles listed in regulation 7(3); and

(k) the main alternatives (if any) to the technology and techniques referred to in sub-paragraph (g) studied by the applicant, in outline.

(3) Where an application for a permit relates to the operation of a large combustion installation, the application must be accompanied by a non-technical summary of the information which must be provided under paragraph (2).

(4) Where an applicant has an environmental statement which contains information which must be provided under paragraph (2), the applicant may include the statement with the application in order to provide that information.

(5) In paragraph (4), β€œ environmental statement ” has the same meaning as it has in regulation 3(1) of the Offshore Oil and Gas Exploration, Production, Unloading and Storage (Environmental Impact Assessment) Regulations 2020 .

Applications for permits: medium combustion plant

4A. Where an application for a permit relates to the operation of a medium combustion plant an application must include the information listed at Annex 1.

Making applications publicly available : large combustion installations

5. β€”(1) Where the Secretary of State receives an application for a permit that relates to the operation of a large combustion installation , the Secretary of State must make publicly available a notice which contains the matters in paragraph (2)(β€œan application notice”).

(2) The matters referred to in paragraph (1) areβ€”

(a) a copy of the application;

(b) that representations by the public may be sent to the Secretary of State in respect of the application;

(c) where those representations are to be sent;

(d) the date by which those representations must be received, which must be no earlier than 4 weeks after the application notice is made public;

(e) whether or not the operation of the offshore combustion installation which is the subject of the applicationβ€”

(i) is likely to have significant negative effects on the environment of a member State ; and

(ii) requires an environmental impact assessment or consultation with a member State before a decision in respect of the application can be made;

(f) the possible decisions which may be made by the Secretary of State in respect of the application;

(g) when such decisions are likely to be made; and

(h) such other information as the Secretary of State considers relevant to the application.

(3) Where the Secretary of State holds information whichβ€”

(a) was not included in the application notice; and

(b) the Secretary of State considers is relevant to the application,

the Secretary of State must make publicly available as soon as possible a notice which contains the matters in paragraph (4)(β€œa supplemental notice”).

(4) The matters referred to in paragraph (3) areβ€”

(a) the additional information;

(b) reference to the application notice and any previous supplemental notice;

(c) where those notices are publicly available; and

(d) any amendment ofβ€”

(i) the date by which representations from the public must be received, which date must not be earlier than the date given for that purpose in the application notice; and

(ii) the matters in paragraph (2)(e) or (g).

Applications for permits and variation of permits for large combustion installations : effects on the environment of ... member States

6. β€”(1) This regulation applies whereβ€”

(a) the Secretary of State considers that the operation of a large combustion installation which is the subject of an application under regulation 4 or a notice under regulation 12 is likely to have significant negative effects on the environment of a member State ; or

(b) a member State requests details of the operation of a large combustion installation which is the subject of such an application or notice.

(2) The Secretary of State must, as soon as possible afterβ€”

(a) making publicly available the application notice and any supplemental notice; or

(b) receipt of the notice under regulation 12,

provide a copy of the notice to the ... member State.

(3) When complying with paragraph (2), the Secretary of State must inform the ... member State of the date by which any representations by that State must be received by the Secretary of State.

(4) In respect of an application under regulation 4, the date under paragraph (3) must not be earlier thanβ€”

(a) the date included in the application notice under regulation 5(2)(d); or

(b) if applicable, any amendment of that date included in any supplemental notice.

Determining applications : large combustion installations

7. β€”(1) Before granting or refusing an application for a permit for the operation of a large combustion installation , the Secretary of State must take into accountβ€”

(a) representations receivedβ€”

(i) from the public by the date provided for their receipt in the application notice or any supplemental notice; and

(ii) where regulation 6(1) applies, from a member State by the date provided under regulation 6(3);

and

(b) ... any relevant information obtained by or provided to the Secretary of State and any conclusion of the Secretary of State under retained EU law that implemented Articles 4, 5, 6, 7 and 9 of the EIA Directive.

(2) The Secretary of State must grant a permit for the operation of a large combustion installation to an applicant if the Secretary of State is satisfied that the large combustion installation will be operated in compliance with the 2010 Directive.

(3) The Secretary of State must in particular be satisfied that the applicant will operate the large combustion installation in accordance with the principles thatβ€”

(a) all appropriate measures are taken to prevent pollution, including by the application of best available techniques;

(b) no significant pollution will be caused;

(c) the production of non-gaseous waste is avoided where possible by the use ofβ€”

(i) clean technologies which are sparing in their use of natural resources; or

(ii) products designed to reduce the amount or harmfulness of waste;

(d) where non-gaseous waste is produced, it isβ€”

(i) prepared for reuse, recycled or recovered; or

(ii) where compliance with paragraph (i) is not technically and economically possible, disposed of in such a way as to avoid or minimise any impact on the environment;

(e) energy is used efficiently;

(f) necessary measures are taken to prevent accidents which may affect the environment and to limit the environmental consequences of accidents;

(g) necessary measures are taken when the operation finally ceasesβ€”

(i) to decommission and remove the combustion plant ; and

(ii) to avoid any risk of pollution arising in consequence of the decommissioning and removal.

Determining applications: medium combustion plant

7A. Where the Secretary of State receives a duly-made application for a permit that relates to a medium combustion plant but does not relate to a large combustion installation, the Secretary of State mustβ€”

(a) start the procedure for determining the application within one month of the operator providing the information referred to in regulation 4A; and

(b) inform the operator when the procedure has started.

Granting and refusal of applications : large combustion installations

8. β€”(1) Where an applicant has applied for a permit which relates to a large combustion installation the Secretary of State must give notice to the applicant as soon as possible of the decision to grant a permit or to refuse the application, together with reasons for the decision.

(2) The Secretary of State must make publicly available as soon as possible the notice given under paragraph (1) together withβ€”

(a) a summary of the representations received and taken into accountβ€”

(i) from the public; and

(ii) where regulation 6 applies, from a member State ;

and

(b) how the representations described in sub-paragraph (a) were taken into account in making the decision.

Granting and refusal of applications: medium combustion plant

8A. Where the Secretary of State receives an application for a permit that relates to a medium combustion plant, the Secretary of State must give notice to the applicant of the decision to grant a permit or to refuse an application, together with reasons for the decision.

Conditions in permits : large combustion installations

9. β€”(1) Subject to regulation 10, the Secretary of State mustβ€”

(a) set conditions in a permit that relates to a large combustion installation to secure the matters in paragraph (2); and

(b) in setting conditions regarding a large combustion installation on the basis of best available techniques, give particular consideration to the criteria listed in Schedule 1 in determining those techniques but must not prescribe the use of any particular technique or technology.

(2) The matters referred to in paragraph (1)(a) are thatβ€”

(a) the operator complies with the principles in regulation 7(3);

(b) in respect of a pollutant listed in Schedule 2 which is likely to be emitted from the large combustion installation in significant quantities, there are controls on the emissions in the form ofβ€”

(i) emission limit values for the pollutant;

(ii) where the Secretary of State considers it appropriate, equivalent parameters or technical measures; or

(iii) a combination of such values, parameters or measures,

and that those controls have regard to the total mass of the emissions from the large combustion installation , the nature of the pollutant and its potential to transfer pollution from one medium to another;

(c) in respect of waste generated by the large combustion installation , there are appropriate measures to monitor and control that waste;

(d) in respect of a pollutant which may be emitted from the large combustion installation , there are suitable emission monitoring requirements for such an emission, which includeβ€”

(i) measurement methodology, frequency and evaluation procedure;

(ii) where the Secretary of State intends to set less strict emission limit values as provided by regulation 10(1), that the results of emission monitoring are provided for the same periods and with the same reference conditions as would apply to emission levels associated with the best available techniques; and

(iii) the provision at least annually of information on the basis of the results of emission monitoring under paragraphs (i) and (ii) and such other data which enables the Secretary of State to verify compliance with the permit;

(e) in respect of subparagraph (d)(ii) where it applies, there are requirements to provide a summary of the results of emission monitoring which allows a comparison with the emission levels associated with the best available techniques;

(f) in respect of pollution which may travel long distances or to a member State , there are appropriate controls to minimise that travel;

(g) in respect of an operation of the large combustion installation other than a normal operation, including start-up and shutdown, leaks, malfunctions, momentary stoppages and definitive cessation of operation, there are controls which minimise risks to the environment from such an operation;

(h) in respect of any incident or accident which may significantly affect the environment, the operator immediatelyβ€”

(i) informs the Secretary of State and any other public authority which has responsibilities concerning such incidents or accidents; and

(ii) takes the measures required to limit the environmental consequences and to prevent further possible incidents or accidents; and

(i) in respect of any breach of the conditions in a permit, the operator as soon as possible informs the Secretary of State and takes the necessary measures to restore compliance.

(3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Conditions in permits: medium combustion plant

9A.β€”(1) Where a permit relates to a medium combustion plant, the Secretary of State must set conditions in a permit to secure the matters in paragraph (2).

(2) The matters referred to in paragraph (1) are thatβ€”

(a) the operator carries out monitoring of emissions in accordance with, as a minimum, Part 1 of Annex 3;

(b) the operator monitors emissions while firing a fuel or fuel mix that is likely to result in the highest level of emissions and during a period representing normal operating conditions;

(c) the emissions do not exceed the emission limit values set out in Annex 2;

(d) the operator keeps a record of and processes all monitoring results in such a way as to enable the verification of compliance with the emission limit values in accordance with Part 2 of Annex 3;

(e) for medium combustion plant using secondary abatement equipment in order to meet the emission limit values for the medium combustion plant, the operator keeps a record of, or information proving, the effective continuous operation of that equipment;

(f) the operator keeps a copy of the permit and, if relevant, any varied permit and related information;

(g) the operator keeps the following for a period of at least six years from the date the result, information or record was createdβ€”

(i) the monitoring results and information referred to in sub-paragraphs (d) and (e);

(ii) where applicable, a record of operating hours as referred to in regulations 11C and 11D;

(iii) a record of the type and quantities of fuels used in the plant and of any malfunctions or breakdown of secondary abatement equipment; and

(iv) a record of the events of non-compliance with the emission limit values and the measures taken to address that non-compliance;

(h) there are suitable reporting requirements, which include the provision of the results of emission monitoring and such other data which enables the Secretary of State to verify compliance with the permit;

(i) the operator, without undue delay, makes available the data and information described in sub-paragraphs (f) and (g) to the Secretary of State upon request;

(j) the operator keeps the periods of start-up and shut-down of the medium combustion plant as short as possible;

(k) in respect of any breach of the conditions in a permit, the operator as soon as possible informs the Secretary of State and takes the necessary measures to restore compliance; and

(l) where any breach of the conditions in a permit causes a significant degradation of local air quality, the operator suspends operation of the medium combustion plant until compliance is restored.

Conditions in permits: large and medium combustion plant

9B. The Secretary of Stateβ€”

(a) must include conditions in a permit which enable the Secretary of State to assess compliance with any relevant emission limit values; and

(b) may include such other conditions in a permit as the Secretary of State thinks fit.

Emission limit values : large combustion installations

10. β€”(1) Where paragraph (2) applies and subject to paragraph (3), the Secretary of State may set emission limit values as a condition of a permit which are less strict than the values required by Article 15(3) of the 2010 Directive (β€œthe Article 15(3) values”).

(2) The Secretary of State mustβ€”

(a) assess that to impose the Article 15(3) values would lead to disproportionately higher costs compared to the environmental benefits because ofβ€”

(i) the geographical location of, or the local environmental conditions at, the large combustion installation ; or

(ii) the technical characteristics of the large combustion installation ;

and

(b) be satisfied that by setting the emission limit values, no significant pollution will be caused and a high level of protection of the environment as a whole will be achieved.

(3) The Secretary of State must include in an annex to the permitβ€”

(a) the result of the assessment under paragraph (2)(a); and

(b) the justification for being satisfied under paragraph (2)(b).

Greenhouse gases : large combustion installations

11. β€”(1) A condition must not be included in a permit which relates to the operation of a large combustion installation to secure the matters in regulation 9(2) in respect of the emissions of a greenhouse gas specified in Annex I to the 2003 Directive, except to the extent that a condition is required in order to ensure no significant local pollution is caused.

(2) In paragraph (1), β€œ the 2003 Directive ” means Directive emission allowance trading within the Community, as amended .

Industrial Emissions Directive: large combustion plant

11A. Where a permit relates to a large combustion plant, the Secretary of State must exercise the Secretary of State’s functions under these Regulations so as to ensure compliance with the following provisions of the 2010 Directiveβ€”

(a) Article 29;

(b) Article 30(1) and 30(3) to (8) except that the Secretary of State has no obligation to inform the Commission of any derogation granted under paragraph (5) or (6) ;

(c) Article 37;

(d) Article 38;

(e) Article 39;

(f) Article 40(1).

Emission limit values: medium combustion plant

11B.β€”(1) Paragraphs (2) to (4) apply subject to regulations 11C to 11G.

(2) From 20th December 2018, emissions into the air of sulphur dioxide, NOx and dust from a new medium combustion plant must not exceed the emission limit values set out in Part 2 of Annex 2.

(3) From 1st January 2025, emissions into the air of sulphur dioxide, NOx and dust from an existing medium combustion plant with a rated thermal input greater than 5 megawatts must not exceed the emission limit values set out in Tables 2 and 3 of Part 1 of Annex 2.

(4) From 1st January 2030, emissions into the air of sulphur dioxide, NOx and dust from an existing medium combustion plant with a rated thermal input of 5 megawatts or less must not exceed the emission limit values set out in Tables 1 and 3 of Part 1 of Annex 2.

Limited operating hours – existing medium combustion plant

11C.β€”(1) An existing medium combustion plant which operates for no more than 500 operating hours per year, as a rolling average over a period of five years, is not required to comply with the emission limit values set out in Part 1 of Annex 2 during that period of five years, provided that the operator has signed a declaration in accordance with paragraph 7 of Annex 1 before the start of that period of five years.

(2) An existing medium combustion plant which operates for no more than 1,000 operating hours per year, as a rolling average over a period of five years, is not required to comply with the emission limit values set out in Part 1 of Annex 2 where it operates to produce heat in cases of exceptionally cold weather events during that period of five years, provided that the operator has signed a declaration in accordance with paragraph 7 of Annex 1 before the start of that period of five years.

Limited operating hours: new medium combustion plant

11D. A new medium combustion plant which operates for no more than 500 operating hours per year, as a rolling average over a period of three years, is not required to comply with the emission limit values set out in Part 2 of Annex 2 during that period of three years, provided that the operator has signed a declaration in accordance with paragraph 7 of Annex 1 before the start of that period of three years.

Temporary derogations: medium combustion plant

11E.β€”(1) This paragraph applies in relation to a medium combustion plant which normally uses low sulphur fuel whereβ€”

(a) the operator is unable to comply with the relevant emission limit values for sulphur dioxide in regulation 11B, because of an interruption in the supply of low-sulphur fuel resulting from a serious shortage; and

(b) the operator requests a temporary derogation from the requirement to comply with those emission limit values.

(2) Where paragraph (1) applies, the Secretary of State may grant a derogation from the obligation to comply with the emission limit values for a maximum of six months.

(3) This paragraph applies in relation to a medium combustion plant using only gaseous fuel whereβ€”

(a) the installation has to resort exceptionally to the use of other fuels because of an interruption in the supply of gas resulting from a serious shortage; and

(b) the installation would need to be equipped with secondary abatement equipment in order to comply with those emissions limit values.

(4) Where paragraph (3) applies, the Secretary of State may grant a derogation from the obligation to comply with the relevant emissions limit values in regulation 11Bβ€”

(a) for a maximum of 10 days; or

(b) for such longer period as the operator satisfies the Secretary of State is justified under the circumstances.

Simultaneous use of fuels: medium combustion plant

11F. Where a medium combustion plant simultaneously uses two or more fuels, the emission limit value for each pollutant must be calculated byβ€”

(a) taking the emission limit value relevant for each individual fuel as set out in Annex 2;

(b) determining the fuel-weighted emission limit value, which is obtained by multiplying the individual emission limit value referred to in paragraph (a) by the thermal input delivered by each fuel, and dividing the product of multiplication by the sum of the thermal inputs delivered by all fuels; and

(c) aggregating the fuel-weighted emission limit values.

Emission limit values: compliance

11G. The emission limit values shall be regarded as having been complied with if the results of monitoring conducted in accordance with the conditions of the permit show that the emissions for the combustion installation and the pollutant concerned do not exceed the emission limit value which applies in respect of that installation and that pollutant.

PART 3 Variations of conditions in permits

Variation of operation of large combustion installations

12. β€”(1) Where an operator proposes to vary the operation of a large combustion installation (β€œthe proposed variation”), the operator mustβ€”

(a) give notice to the Secretary of State of the proposed variation; and

(b) supply such information as the Secretary of State requests in order that the Secretary of State may consider whether or not to approve the variation and what, if any, variation of the permit may be required.

(2) The operator must not put into effect the proposed variation unless and until the operator receives a notice under paragraph (4) approving the variation.

(3) Whereβ€”

(a) the Secretary of State considers that the proposed variation would be a substantial change in operation of the large combustion installation ; ...

(b) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

the Secretary of State must take into account any relevant information obtained by or provided to the Secretary of State and any conclusion of the Secretary of State under retained EU law that implemented Articles 4, 5, 6, 7 and 9 of the EIA Directive when deciding to approve or refuse the proposed variation.

(4) Subject to paragraph (5), the Secretary of State must, as soon as possible after the notice under paragraph (1) is received, give notice to the operatorβ€”

(a) approving the proposed variation, together with any varied conditions in the permit; or

(b) refusing the proposed variation, together with reasons for that decision.

(5) Whereβ€”

(a) a notice is received under paragraph (1); and

(b) regulation 6(1) applies,

the Secretary of State must take account of representations received from a member State by the date provided under regulation 6(3) before giving notice to the operator under paragraph (4).

(6) Where the Secretary of State approves a proposed variationβ€”

(a) the conditions in the permit may be varied as the Secretary of State thinks fit; but

(b) regulation 9(1) must be complied with when making any variation.

(7) In this regulation, β€œ substantial change in operation ” means a change in the nature or functioning, or an extension, of a large combustion installation whichβ€”

(a) may have significant negative effects on the environment; or

(b) in itself is equal to or greater than a rated thermal input of 50 megawatts.

Variation of existing permits: medium combustion plant

12A. In any case where there is a permit granted before the relevant date which relates to a medium combustion plant, the Secretary of State mustβ€”

(a) review the permit before the relevant date; and

(b) if necessary, vary the permit to ensure that it complies with the relevant requirements of regulation 9A on the relevant date.

Variation of operation of medium combustion plant

12B.β€”(1) Where an operator proposes to vary (β€œthe proposed variation”) the operation of a medium combustion plant, the operator mustβ€”

(a) give notice to the Secretary of State of the proposed variation; and

(b) supply such information as the Secretary of State requests in order that the Secretary of State may consider whether or not to approve the variation and what, if any, variation of the permit may be required.

(2) The operator must not put into effect the proposed variation unless and until the operator receives a notice under paragraph (3) approving the variation.

(3) The Secretary of State must, as soon as possible after the notice under paragraph (1) is received, give notice to the operatorβ€”

(a) approving the proposed variation, together with any varied conditions in the permit; or

(b) refusing the proposed variation, together with reasons for that decision.

(4) Subject to regulation 9A(1), where the Secretary of State approves a proposed variation, the conditions in the permit may be varied as the Secretary of State thinks fit.

Review of permits : large combustion installations

13. β€”(1) Subject to paragraph (2), the Secretary of State must review the conditions of a permit that relates to the operation of a large combustion installation at such intervals as the Secretary of State thinks fit.

(2) The Secretary of State must review the conditions in a permit that relates to the operation of a large combustion installation where the Secretary of State considers thatβ€”

(a) developments in best available techniques allow for the significant reduction of emissions without incurring excessive costs;

(b) the operational safety of the large combustion installation requires techniques, other than best available techniques to be used; or

(c) the pollution caused by the large combustion installation is of such significance that the existing emission limit values, equivalent parameters or technical measures in the permit need to be revised.

(3) Where further to a review the Secretary of State considers a variation of the conditions in the permit are required, the Secretary of State must comply with regulation 9(1) in setting those conditions.

(4) The Secretary of State must in carrying out a reviewβ€”

(a) encourage the development and application of emerging techniques for the reduction of emissions in relation to large combustion installations ; and

(b) consider the results of monitoring and inspections of the large combustion installation .

(5) An operator must provide to the Secretary of State such information as the Secretary of State requests which may be needed to review the conditions of a permit.

(6) The information which may be requested under paragraph (5) includes, where the application of best available techniques is appropriate to the large combustion installation , the results of emission monitoring and other data which enables a comparison of the operation of the large combustion installation with the emission levels associated with the best available techniques.

Variation of conditions in permits for large combustion installations following a review except further to regulation 13(2)(c)

14. β€”(1) This regulation applies where the Secretary of State considers that a variation of the conditions in a permit which relates to the operation of a large combustion installation is required further to a review of the conditions, except where the review was undertaken (in whole or part) further to regulation 13(2)(c).

(2) The Secretary of State must give the operator notice of the intended variation of the conditions (β€œvariation notice”).

(3) The variation notice mustβ€”

(a) be given at least 14 days before the Secretary of State intends that the variation is to have effect (β€œthe variation date”); and

(b) state the date by which any representations from the operator must be received.

(4) The Secretary of State must take into account any such representations received from the operator.

(5) The Secretary of State mustβ€”

(a) give effect to a variation of the conditions in the permit in such amended form and on the variation date or such later date, as the Secretary of State considers appropriate; or

(b) withdraw the variation notice.

(6) The Secretary of State must as soon as possible give notice to the operator of the decision made under paragraph (5) and make that notice publicly available.

Variation of conditions in permits for large combustion installations following a review further to regulation 13(2)(c)

15. β€”(1) This regulation applies where the Secretary of State considers that a variation of the conditions in a permit which relates to the operation of a large combustion installation is required further to a review of the conditions, where the review was undertaken (in whole or part) further to regulation 13(2)(c).

(2) The Secretary of State must make publicly available a notice which contains the matters in paragraph (3)(β€œvariation notice”).

(3) The matters referred to in paragraph (2) areβ€”

(a) a copy of the intended variation of the conditions;

(b) that representations by the operator and the public may be sent to the Secretary of State in respect of the variation;

(c) where those representations are to be sent;

(d) the date by which those representations must be received, which must be no earlier than 4 weeks after the variation notice is made public;

(e) when the intended variation of the conditions is to take effect (β€œvariation date”);

(f) the possible decisions which may be made by the Secretary of State in response to representations; and

(g) such other information as the Secretary of State considers relevant.

(4) Where the Secretary of Stateβ€”

(a) holds information which was not included in the variation notice; and

(b) which the Secretary of State considers is relevant to the intended variation,

the Secretary of State must make publicly available as soon as possible a notice which contains the matters in paragraph (5)(β€œa supplemental notice”).

(5) The matters referred to in paragraph (4) areβ€”

(a) the additional information;

(b) reference to the variation notice and any previous supplemental notice;

(c) where those notices are publicly available; and

(d) any amendment ofβ€”

(i) the date by which representations from the operator and public must be received, which date must not be earlier than the date given for that purpose in the variation notice; or

(ii) the variation date.

(6) The Secretary of State must take into account any representations from the operator and public received by the date set out in the variation notice or any supplemental notice.

(7) The Secretary of State mustβ€”

(a) give effect to a variation of the conditions in such amended form and on the variation date or such later date, as the Secretary of State considers appropriate; or

(b) withdraw the variation notice.

(8) The Secretary of State must as soon as possible give notice of a decision under paragraph (7) to the operator and make that notice publicly available.

Review of permits: medium combustion plant

15A.β€”(1) The Secretary of State may at any time review the conditions of a permit which relates to the operation of a medium combustion plant.

(2) An operator must provide, without undue delay, to the Secretary of State such information as the Secretary of State requests which may be needed to review the conditions of a permit.

PART 4 Revocation, surrenders and assignments

Revocation

16. β€”(1) The Secretary of State may revoke a permit whereβ€”

(a) that permit was obtained by the provision of false or misleading information in a material particular; or

(b) the conditions in a permit are breached.

(2) The Secretary of State must give notice to the operator as soon as possibleβ€”

(a) that the permit is revoked from the date set out in the notice; and

(b) of the reasons for the revocation.

(3) Where the permit relates to the operation of a large combustion installation the Secretary of State must as soon as possible make publicly available a notice given under paragraph (2).

Surrenders

17. β€”(1) An operator may give notice to the Secretary of State that it intends to surrender a permit on a date set out in the notice (β€œsurrender offer”).

(2) A surrender offer must be accompanied by any fee which is provided under regulation 22.

(3) The Secretary of State must as soon as possible after receipt of the surrender offer give notice to the operator thatβ€”

(a) the permit will be treated as surrendered from the date set out in the notice, which may be other than the date set out in the surrender offer; or

(b) the surrender offer is refused, together with the reasons for that decision.

(4) Where the permit relates to the operation of a large combustion installation the Secretary of State must as soon as possible make publicly available a notice given under paragraph (3).

Assignments

18. β€”(1) An operator may apply to the Secretary of State by notice for permission to assign a permit.

(2) The Secretary of State must as soon as possible after receipt of the application give notice to the operator thatβ€”

(a) the permit may be assigned within a time period specified in the notice (β€œpermission notice”); or

(b) the application is refused, together with the reasons for that decision.

(3) Whereβ€”

(a) a permission notice is given; and

(b) the permit is assigned within the time period specified in that notice,

the assignor and assignee must give notice to the Secretary of State as soon as possible of the completion of the assignment and the date it completed.

(4) Where the permit relates to the operation of a large combustion installation the Secretary of State must as soon as possible make publicly available a notice given under paragraph (2).

Revocation, surrenders and assignments: additional matters

19. β€”(1) The Secretary of State may agree to a surrender or assignment subject to such conditions as the Secretary of State thinks fit.

(2) Where a permit is revoked, surrendered or assigned, that does not affect the liability of the operator in respect of any breach of the permit conditions which occurs before the revocation, surrender or assignment has effect.

PART 5 Transboundary projects, registers, fees and information notices

Transboundary projects in ... member States

20. β€”(1) This regulation applies where the Secretary of State receives information from a member State concerning the operation (or proposed operation) of a large combustion installation in that member State which is likely to have significant negative effects on the transboundary area (β€œtransboundary effects”).

(2) The Secretary of State mustβ€”

(a) consult the ... member State about the transboundary effects;

(b) promptly make available to the public and such authorities as the Secretary of State thinks fit the information received from the ... member State and any additional information derived from the consultation with that State;

(c) give the public and the authorities a reasonable opportunity to provide written comments to the Secretary of State concerning the transboundary effects.

(3) The Secretary of State must provide to the ... member State any comments it receives under paragraph (2)(c).

(4) To the extent that the Secretary of State is informed by the ... member State ofβ€”

(a) that State's decision concerning the operation of the installation referred to in paragraph (1); and

(b) the reasons for that decision,

the Secretary of State must as soon as possible make that information available to the public and such authorities as the Secretary of State thinks fit.

(5) In this regulation, β€œ transboundary area ” means the areas described inβ€”

(a) paragraphs (a), (b) and (c) of the definition of the offshore area; and

(b) paragraph (b) of the definition of the relevant gas area, where that lies beyond the area described in paragraph (a).

Register of large combustion installations

21. β€”(1) The Secretary of State must maintain a register of large combustion installations which includes information onβ€”

(a) application notices and supplemental notices given by the Secretary of State under regulation 5;

(b) notices given by the Secretary of State under regulation 8(1);

(c) the matters described in regulation 8(2);

(d) permits granted and the conditions in those permits, together with any annexes to the permits as described in regulation 10(3);

(e) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(f) notices given by the Secretary of State under regulation 12(4) , together with the proposed variation to which a notice relates ;

(g) variation notices given by the Secretary of State under regulation 14(3) and any representations received from operators in response to such a notice;

(h) notices given by the Secretary of State under regulation 14(6);

(i) variation notices and supplemental notices given by the Secretary of State under regulation 15 and any representations received in response to such notices;

(j) notices given by the Secretary of State under regulation 15(8);

(k) the revocation, surrender or assignment of a permit;

(l) environmental inspection plans and programmes for routine inspections made under regulation 27;

(m) inspection reports made by the Secretary of State under regulation 29;

(n) enforcement and prohibition notices.

(2) The register maintained under paragraph (1) must be kept up to date at reasonable intervals and the register or copies of it must be made readily accessible to the public.

Register of medium combustion plant

21A.β€”(1) The Secretary of State must maintain a register of medium combustion plant which includesβ€”

(a) in relation to each medium combustion plant in the register, the information listed in Annex 1; and

(b) information on variations to the medium combustion plant that affect the applicable emission limit values.

(2) The register maintained under paragraph (1) must be kept up to date at reasonable intervals and it, or copies of it, must be made readily accessible to the public, including via the internet.

Fees

22. β€”(1) Subject to paragraphs (2) and (5), the Secretary of State may charge a fee in respect ofβ€”

(a) determiningβ€”

(i) an application for a permit under regulation 4 or 4A ;

(ii) an application for a variation under regulation 12 or 12B ;

(iii) a surrender offer;

(iv) an application for assignment under regulation 18;

(b) the subsistence of a permit;

(c) carrying outβ€”

(ai) a variation under regulation 12A;

(i) a variation of the conditions of a permit further to a review under regulation 13 or 15A ;

(ii) a revocation of a permit;

(iii) a test or analysis of a substance;

(iv) a verification of the validity of, or the results of, a test or analysis of a substance;

(v) an assessment of the effect upon the environment of the operation of an offshore combustion installation.

(d) the provision of advice in respect ofβ€”

(i) an application or potential application for a permit under regulation 4 or 4A;

(ii) an application or potential application for a variation under regulation 12 or 12B;

(iii) a variation under regulation 12A;

(iv) a variation of the conditions of a permit further to a review under regulation 13 or 15A;

(v) a surrender offer;

(vi) an application or potential application for assignment under regulation 18;

(vii) a revocation of a permit;

(viii) a test or analysis of a substance;

(ix) a verification of the validity of, or the results of, a test or analysis of a substance;

(x) an assessment of the effect upon the environment of the operation of an offshore combustion installation.

(2) A fee may only be charged under paragraph (1) whereβ€”

(a) the Secretary of State has set out the fee in a charging scheme; and

(b) the charging scheme has been made publicly available before the scheme takes effect.

(3) A fee is payable at the time provided in the charging scheme.

(4) A charging schemeβ€”

(a) may be varied from time to time; and

(b) must be so framed such that the fees set out in the scheme are sufficient, taking one year with another, to meet the costs incurred by or on behalf of the Secretary of State in relation to the matters in respect of which a fee is payable.

(5) A fee may only be charged in respect of the matters in paragraph (1)(c)(iii) to (v) and (d)(viii) to (x) where those matters are carried out by the Secretary of Stateβ€”

(a) in anticipation of or in connection with an application for a permit under regulation 4 or 4A or an application for a variation under regulation 12 or 12B ; or

(b) pursuant to the conditions in a permit.

Information notices and reporting

23. β€”(1) The Secretary of State may by notice (β€œinformation notice”) require a person to provide to the Secretary of State such information as the Secretary of State considers is reasonably required by the Secretary of Stateβ€”

(a) to perform the functions of the Secretary of State under Parts 1 to 4 of these Regulations; and

(b) to monitor compliance with the 2010 Directive and the MCPD in relation to offshore combustion installations.

(2) Where the Secretary of State considers that a person has access to information on emissions from an offshore combustion installation, an information notice may require that person to compile and provide information on those emissions, notwithstanding that the information is not held by that person at the time the notice is received.

(3) An operator must report by notice to the Secretary of State as soon as possibleβ€”

(a) planned changes in the nature, functioning or extension of an offshore combustion installation which may have consequences for the environment;

(b) any accident or incident affecting an offshore combustion installation which has or may have a significant negative effect on the environment; and

(c) any breach of the conditions in the permit.

(4) Where a member of the public requests access to data and information listed in regulation 9A(2)(e) and (f), the Secretary of State must make a request for that data or information.

PART 6 Enforcement, appeals, and offences

Appointment of inspectors

24. β€”(1) The Secretary of State may authorise in writing a person who appears suitable (β€œan inspector”) to act on the Secretary of State's behalf to exercise functions of the Secretary of State under these Regulations, subject to any limitations or conditions as the Secretary of State thinks fit.

(2) Unless the Secretary of State provides to the contrary, a person is an inspector for the purposes of paragraph (1) where that person is authorised as an inspector under regulation 13(1) of the Offshore Combustion Installations (Prevention and Control of Pollution) Regulations 2001 .

Powers of inspectors

25. To assist in the exercise of the functions of the Secretary of State under these Regulations, an inspector mayβ€”

(a) at any reasonable time (or in case of emergency, at any time) board any relevant platform, together with any equipment or material as may be required, and may be accompanied by any other person authorised by the Secretary of State;

(b) make such examination and investigation as the inspector considers necessary and may install or maintain monitoring or other apparatus on the relevant platform;

(c) direct that any part of the relevant platform be left undisturbed for so long as may be necessary to effect any examination or investigation;

(d) take such measurements and photographs and record such information as the inspector considers necessary in relation to any examination or investigation;

(e) take samples of any thing found on the relevant platform and of the atmosphere, land, seabed (including its subsoil) or water in the vicinity of the relevant platform;

(f) in the case of any thing found on or in the vicinity of the relevant platform and which appears to the inspector to have caused, or to be likely to cause, significant pollution, cause it to be dismantled or subjected to any process or test (but not so as to damage or destroy the thing unless that is necessary);

(g) take possession of any thing to which subparagraph (f) applies and detain it for so long as is necessaryβ€”

(i) to examine it and do to it anything provided by this regulation;

(ii) to ensure it is not tampered with before its examination is completed;

(iii) to ensure that it is available for use as evidence in any proceedings for an offence under regulation 34;

(h) require any person (β€œP1”) whom the inspector has reasonable cause to believe is able to give information relevant to any examination or investigationβ€”

(i) to attend at a place and time specified by the inspector;

(ii) to answer (in the absence of any persons other than those whom the inspector may allow to be present and a person nominated by P1) such questions as the inspector thinks fit to ask; and

(iii) to sign a declaration of truth of the answers given by P1;

(i) require the production of, and inspect and take copies of, or any entry in,β€”

(i) any records which are required to be kept by virtue of these Regulations;

(ii) any records which the inspector considers it necessary to see for the purposes of any examination or inspection;

and

(j) require any person (β€œP2”) to afford the inspector such facilities and assistance with respect to any matter or thing within P2's control or in relation to which P2 has responsibilities, as the inspector considers necessary to enable the exercise of any powers provided under this regulation.

Admissible evidence

26. β€”(1) An answer given by a person in compliance with a requirement imposed under regulation 25 is admissible in evidence in England and Wales or Northern Ireland against that person in any proceedings or, in Scotland, against that person in criminal proceedings.

(2) In criminal proceedings in which such person as is mentioned in paragraph (1) is charged with an offence to which this paragraph applies, no evidence relating to that person's answer may be adduced and no question relating to it may be asked by or on behalf of the prosecution unless evidence relating to it is adduced by or on behalf of that person.

(3) Paragraph (2) applies to any offence other than one underβ€”

(a) regulation 34(2)(b);

(b) section 5 of the Perjury Act 1911 (false statements made otherwise than on oath);

(c) section 44(2) of the Criminal Law (Consolidation) (Scotland) Act 1995 (false statements made otherwise than on oath); or

(d) article 10 of the Perjury (Northern Ireland) Order 1979 (false statutory declarations and other false unsworn statements).

(4) Nothing in regulation 25 compels the production by any person of a document whichβ€”

(a) except in relation to Scotland, that person would on grounds of legal professional privilege be entitled to withhold production on an order for discovery in an action in the County Court, High Court or High Court in Northern Ireland; or

(b) in relation to Scotland, contains confidential information made by or to an advocate or solicitor in that capacity and which that person would be entitled to withhold production on an order for the production of documents in an action in the Court of Session.

Environmental inspection plans and programmes : large combustion installations

27. β€”(1) The Secretary of State must ensure than a large combustion installation is covered by an environmental inspection plan.

(2) In paragraph (1), β€œ environmental inspection plan ” means a plan which includes the followingβ€”

(a) a general assessment of relevant significant environmental issues;

(b) the geographical area covered by the plan;

(c) a register of the large combustion installations covered by the plan;

(d) procedures for drawing up programmes for routine environmental inspections;

(e) procedures for non-routine environmental inspections; and

(f) where necessary, provisions on the cooperation between the Secretary of State and other persons or bodies responsible for inspection of relevant platforms.

(3) The Secretary of State must review regularly and keep up to date environmental inspection plans.

(4) Programmes for routine environmental inspections mustβ€”

(a) be regularly drawn up by the Secretary of State;

(b) be based on the environmental inspections plans; and

(c) include the frequency of inspections.

Inspections : large combustion installations

28. β€”(1) The Secretary of State must carry out routine inspections of large combustion installations in accordance with the programmes provided for under regulation 27(4).

(2) The frequency of inspections of large combustion installations must be based on a systematic appraisal by the Secretary of State of the environmental risks of the installations and, subject to paragraph (5), the period between inspections must not exceedβ€”

(a) one year, for installations posing the highest environmental risks; and

(b) three years, for installations posing the lowest environmental risks.

(3) Where an inspection of a large combustion installation identifies important non-compliance with the conditions in the permit, a further inspection must be carried out within six months of that inspection.

(4) The systematic appraisal referred to in paragraph (2) must be based on at least the followingβ€”

(a) the impact and potential impact of the large combustion installation on the environment, taking into accountβ€”

(i) the levels and types of emissions;

(ii) the sensitivity of the local environment; and

(iii) the risk of accidents;

(b) the record of compliance by the operator with the conditions in the permit for the large combustion installation ;

(c) if applicable, whether or not the operator participates in EMAS or an equivalent scheme.

(5) The Secretary of State must carry out non-routine inspections of large combustion installations as soon as possible to investigateβ€”

(a) complaints made to the Secretary of State of serious environmental incidents;

(b) serious environmental accidents or incidents; or

(c) occurrences of serious non-compliance by the operator with the conditions in the permit.

(6) Where appropriate, an inspection under paragraph (5) must take place before the Secretary of State decides whether or not to vary the conditions in a permit pursuant to regulations 12 or 13.

Reports further to inspections : large combustion installations

29. β€”(1) The Secretary of State must prepare a report (β€œan inspection report”) after an inspection of a large combustion installation which describesβ€”

(a) the relevant findings of the inspection concerning the compliance by the operator with the conditions in the permit for that installation; and

(b) the conclusions on whether or not any further action is required by the operator to ensure such compliance.

(2) The Secretary of State must take the necessary steps to ensure the operator carries out any such further action within a reasonable period.

(3) The Secretary of State mustβ€”

(a) give a notice to the operator which includes a copy of the inspection report within two months of the date of the inspection giving rise to the report; and

(b) make the inspection report publicly available within fourth months of the date of the inspection giving rise to the report.

Enforcement notices

30. β€”(1) If the Secretary of State is of the opinion that a person has contravened, is contravening or is likely to contravene the conditions in a permit, the Secretary of State may give that person an enforcement notice.

(2) An enforcement notice mustβ€”

(a) state the opinion referred to in the preceding paragraph;

(b) specify the matters constituting the contravention or the matters making it likely that the contravention will arise, as the case may be;

(c) specify the steps that must be taken to remedy the contravention or to remedy the matters making it likely that the contravention will arise, as the case may be; and

(d) specify the period within which those steps must be taken.

(3) An enforcement notice may be varied or withdrawn at any time.

Prohibition notices

31. β€”(1) If the Secretary of State is of the opinion that the activities of a person, in relation to a contravention or likely contravention of the conditions in a permit, are such that they involve an imminent risk of serious pollution of the environment, the Secretary of State may give that person a prohibition notice.

(2) A prohibition notice mustβ€”

(a) state the opinion referred to in the preceding paragraph;

(b) specify the risk involved in the activity; and

(c) specify the steps that must be taken to remove it and the period within which they must be taken.

(3) A prohibition notice may be varied or withdrawn at any time.

Action by the Secretary of State on failure to comply with enforcement or prohibition notices

32. Where a person fails to comply with an enforcement notice or prohibition notice, the Secretary of State mayβ€”

(a) do what that person was required to do; and

(b) recover from that person any expenses reasonably incurred in doing so.

Appeals

33. β€”(1) This regulation applies to a decision (β€œa relevant decision”) made by the Secretary of State which is contained in a notice made underβ€”

(a) regulation 8(1) (granting and refusal of applications for permits of large combustion installations );

(aa) regulation 8A (granting and refusal of applications for permits for medium combustion plant);

(b) regulation 12(4) (variation of operation of large combustion installations );

(ba) regulation 12B(3) (variation of operation of medium combustion plant);

(c) regulation 14(6) (variation of conditions in large combustion installationpermits following a review except further to regulation 13(2)(c));

(d) regulation 15(8) (variation of conditions in permits following a review further to regulation 13(2)(c));

(e) regulation 16(2) (revocation);

(f) regulation 17(3) (surrenders);

(g) regulation 18(2) (assignments).

(2) A person with a sufficient interest may appeal to the court against a relevant decision but must do so within 28 days of the date of the notice.

(3) A relevant decision remains in force until the court orders otherwise.

(4) In paragraph (2), β€œ the court ” means in respect of an offshore combustion installation situated inβ€”

(a) the English area, the High Court;

(b) the Northern Ireland area, the High Court in Northern Ireland;

(c) the Scottish area, the Court of Session.

(5) Where an offshore combustion installation is situated in more than one of the areas listed in paragraph (4), any of the courts which has jurisdiction for that area under paragraph (4) is β€œ the court ” for the purposes of paragraph (2).

(6) In this regulation β€œ the English area ”, β€œ the Northern Ireland area ” and β€œ the Scottish area ” have the same meaning as in the Civil Jurisdiction (Offshore Activities) Order 1987 .

Offences

34. β€”(1) It is an offence for a person to operate an offshore combustion installationβ€”

(a) without a permit; or

(b) in breach of the conditions in a permit.

(2) It is an offence for a personβ€”

(a) to fail to comply with an information notice, an enforcement notice or a prohibition notice;

(b) to make a statementβ€”

(i) which that person knows to be false or misleading in a material particular; or

(ii) recklessly and which is false or misleading in a material particular,

where the statement is made in purported compliance with a requirement to furnish any information imposed by or under these Regulations;

(c) intentionally to obstruct an inspector in the exercise or performance of the powers or duties of an inspector;

(d) to fail to comply with any requirement imposed pursuant to regulation 25; or

(e) to prevent any other person from appearing before an inspector, or answering any question to which an inspector may require an answer.

(3) It is a defence for a person (β€œA”) charged with an offence under paragraph (2) to prove that the contravention aroseβ€”

(a) because of a matter which A could not have reasonably prevented; or

(b) by reason of something done as a matter of urgency and which was carried out for securing the safety of a person.

(4) Where the commission by a person (β€œB”) of an offence under paragraph (1) or (2) is due to the act or default of another person (β€œC”), C may be charged with and convicted of the offence, whether or not proceedings for the offence are taken against B.

(5) Proceedings for an offence under paragraph (1) or (2) may be taken, and the offence may be treated as having been committed, in any part of the United Kingdom.

(6)Section 3 (restriction on institution of proceedings for punishment of offence) of the Territorial Waters Jurisdiction Act 1878 does not apply to any proceedings for an offence under paragraph (1) or (2).

Penalties

35. A person guilty of an offence under regulation 34 is liableβ€”

(a) on summary conviction, to a fine not exceeding the statutory maximum;

(b) on conviction on indictment, to a fine.

Bodies corporate and Scottish partnerships

36. β€”(1) Where an offence under regulation 34 is committed by a body corporate andβ€”

(a) it is committed with the consent or connivance of an officer; or

(b) it is attributable to any neglect on the officer's part,

the officer as well as the body corporate is guilty of the offence and is liable to be proceeded against and punished accordingly.

(2) β€œ Officer ”, in relation to a body corporate, means a director, manager, secretary or other similar officer of the body, or a person purporting to act in any such capacity.

(3) If the affairs of a body corporate are managed by its members, paragraph (1) applies in relation to the acts or defaults of a member in connection with that member's functions of management as if the member were a director of the body corporate.

(4) Where an offence under regulation 34 is committed by a Scottish partnership andβ€”

(a) it is committed with the consent or connivance of a partner; or

(b) it is attributable to any neglect on the partner's part,

the partner as well as the partnership is guilty of the offence and is liable to be proceeded against and punished accordingly.

(5) In paragraph (4) β€œ partner ” includes a person purporting to act as a partner.

PART 7 Notices, revocation, transitional provision and environmental information

Notices

37. β€”(1) A notice under these Regulationsβ€”

(a) must be in writing; and

(b) may be given to a person byβ€”

(i) delivering it to that person in person;

(ii) leaving it at that person's proper address, or

(iii) sending it by post or electronic means to that person's proper address.

(2) In the case of a body corporate, a notice may be served on or given to the secretary or clerk of that body.

(3) In the case of a partnership, a notice may be served on or given to a partner or a person having control or management of the partnership business.

(4) If a person to be served with or given a notice has specified an address in the United Kingdom (other than that person's proper address) at which that person or someone on that person's behalf will accept notices, that address must instead be treated as that person's proper address.

(5) In this regulationβ€”

(a) β€œperson” (except in subparagraph (b)(ii)) includes an unincorporated association other than a partnership;

(b) β€œ proper address ” meansβ€”

(i) in the case of a body corporate or their secretary or clerkβ€”

(aa) the registered or principal office of that body, or

(bb) the email address of the secretary or clerk;

(ii) in the case of a partnership or a partner or person having control or management of the partnership businessβ€”

(aa) the principal office of the partnership, or

(bb) the email address of a partner or a person having that control or management;

(iii) in any other case, a person's last known address, which includes an email address.

(6) For the purposes of paragraph (5), the principal office of a company registered outside the United Kingdom or of a partnership established outside the United Kingdom is their principal office in the United Kingdom.

(7) Where the Secretary of State specifies an electronic address for submission of a notice to the Secretary of State, it may be submitted electronically to that address.

Revocation and transitional provision

38. β€”(1) Subject to paragraphs (3), (5) and (6), the following (referred to in paragraphs (3), (5) and (6) as β€œthe existing regulations”) are revokedβ€”

(a) the Offshore Combustion Installations (Prevention and Control of Pollution) Regulations 2001 (β€œ the 2001 Regulations ”);

(b) regulation 19 of, and Schedule 1 to, the Offshore Petroleum Activities (Oil Pollution Prevention and Control) Regulations 2005 ;

(c) the Offshore Combustion Installations (Prevention and Control of Pollution) (Amendment) Regulations 2007 ;

(d) article 5 of the Energy Act 2008 (Consequential Modifications) (Offshore Environmental Protection) Order 2010 .

(2) References to numbered regulations in paragraphs (3) and (7) are to the regulations so numbered in the 2001 Regulations as amended.

(3) The existing regulations continue to have effect to determine an application made under regulation 5β€”

(a) where the application was made before these Regulations came into force; and

(b) the application was not refused or determined before that date.

(4) A permit granted further to an application to which paragraph (3) applies is a β€œnew permit”.

(5) Subject to paragraph (6), the existing regulations continue to have effect up to and including 7th January 2014 in respect of an offshore combustion installationβ€”

(a) where immediately before these Regulations came into force, a permit subsisted in respect of that installation; or

(b) to which a new permit applies,

provided that the offshore combustion installation is in operation on or before 7th January 2014.

(6) Where in respect of an offshore combustion installationβ€”

(a) the existing regulations continue to have effect under paragraph (5); and

(b) any of the matters in paragraph (7) are not determined on or before 7th January 2014,

the existing regulations continue to have effect after 7th January 2014 for the purposes of determining that matter.

(7) The matters referred to in paragraph (6) areβ€”

(a) an appeal made under regulation 17;

(b) an application by an operator to vary the terms and conditions of a permit under regulation 8(1);

(c) a notice to surrender under regulation 10(2);

(d) a request to assign a permit under regulation 10(3);

(e) a notice of intention to issue a revised permit under regulation 9(3)(a) or (4)(a);

(f) a notice to revoke a permit under regulation 10(1);

(g) a notice to provide information under regulation 12(3);

(h) an enforcement notice under regulation 14;

(i) a prohibition notice under regulation 15;

(j) proceedings commenced before the date these Regulations come into force in respect of an offence under regulation 18.

Environmental information

39. β€”(1) Paragraph (2) applies in respect of any provision of these Regulations under which the Secretary of State is required to make environmental information accessible or available to the public (β€œa relevant provision”).

(2) A relevant provision does not require the Secretary of State to make accessible or available to the public any information which, were a request for its disclosure to be made under the Environmental Information Regulations 2004 , the Secretary of State would be entitled to refuse to disclose under those regulations.

Michael Fallon

Minister of State

Department for Energy and Climate Change

Regulation 9(1)(b)

SCHEDULE 1 Criteria for determining best available techniques

The criteria referred to in regulation 9(1)(b) for determining best available techniques areβ€”

(1) the use of low-waste technology;

(2) the use of less hazardous substances;

(3) the furthering of recovery and recycling of substances generated and used in the process and of waste, where appropriate;

(4) comparable processes, facilities or methods of operation which have been tried with success on an industrial scale;

(5) technological advances and changes in scientific knowledge and understanding;

(6) the nature, effects and volume of the emissions concerned;

(7) the commissioning dates for new or existing offshore combustion installations;

(8) the length of time needed to introduce the best available technique;

(9) the consumption and nature of raw materials (including water) used in the process and energy efficiency;

(10) the need to prevent or reduce to a minimum the overall impact of the emissions on the environment and the risks to it;

(11) the need to prevent accidents and to minimise the consequences for the environment; and

(12) information published by public international organisations.

Regulation 9(2)

SCHEDULE 2 Pollutants

The pollutants referred to in regulation 9(2) areβ€”

(1) sulphur dioxide and other sulphur compounds;

(2) oxides of nitrogen and other nitrogen compounds;

(3) carbon monoxide;

(4) volatile organic compounds;

(5) metals and their compounds;

(6)dust, including fine particulate matter;

(7) asbestos (suspended particulates, fibres);

(8) chlorine and its compounds;

(9) fluorine and its compounds;

(10) arsenic and its compounds;

(11) cyanides;

(12) substances and mixtures which have been proved to possess carcinogenic or mutagenic properties or properties which may affect reproduction via the air; and

(13) polychlorinated dibenzodioxins and polychlorinated dibenzofurans.

Status: The Offshore Combustion Installations (Pollution Prevention and Control) Regulations 2013 is up to date with all changes known to be in force on or before 23 February 2025. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations.
The Offshore Combustion Installations (Pollution Prevention and Control) Regulations 2013 (2013/971)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
C1Reg. 34(2)(d)(e) applied by SI 2012/3038 reg. 17(3) (as substituted (22.12.2014) by The Greenhouse Gas Emissions Trading Scheme (Amendment) Regulations 2014 (S.I. 2014/3125) , regs. 1(1) , 3 )
F1Words in reg. 2(1) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 3(a)inserted
F2Words in reg. 2(1)(b) substituted (1.10.2016) by The Energy (Transfer of Functions, Consequential Amendments and Revocation) Regulations 2016 (S.I. 2016/912) , regs. 1(1) , 21substituted
F3Words in reg. 2(1) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 3(c)substituted
F4Words in reg. 2(1) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 3(d)substituted
F5Words in reg. 2(1) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 3(e)substituted
F6Words in reg. 2(1) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 3(f)substituted
F7Words in reg. 2(1) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 3(g)inserted
F8Words in reg. 2(1) omitted (18.7.2018) by virtue of The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 3(b)omitted
F9Words in reg. 2(1) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 3(h)substituted
F10Words in reg. 2(1) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 3(i)inserted
F11Reg. 2(3) inserted (31.12.2020) by The Pipe-lines, Petroleum, Electricity Works and Oil Stocking (Miscellaneous Amendments) (EU Exit) Regulations 2018 (S.I. 2018/1325) , regs. 1(1) , 8(2) ; 2020 c. 1 , Sch. 5 para. 1(1)inserted
F12Reg. 2A inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 4inserted
F13Reg. 3 substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 5substituted
F14Words in reg. 4 heading inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 6(a)inserted
F15Reg. 4(1) omitted (18.7.2018) by virtue of The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 6(b)omitted
F16Words in reg. 4(2) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 6(c)substituted
F17Words in reg. 4(2)(b) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 6(d)substituted
F18Words in reg. 4(3) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 6(c)substituted
F19Words in reg. 4(5) substituted (31.12.2020 immediately before 11 p.m.) by The Offshore Oil and Gas Exploration, Production, Unloading and Storage (Environmental Impact Assessment) Regulations 2020 (S.I. 2020/1497) , reg. 1(1) , Sch. 7 para. 5 (with reg. 1(2)-(6) , 20 )this amendment (text substituted) should be read in conjunction with other related provisions, see the commentary.substituted
F20Reg. 4A inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 7inserted
F21Words in reg. 5 heading inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 8(a)inserted
F22Words in reg. 5(1) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 8(b)inserted
F23Words in reg. 5(2)(e) substituted (31.12.2020) by The Pipe-lines, Petroleum, Electricity Works and Oil Stocking (Miscellaneous Amendments) (EU Exit) Regulations 2018 (S.I. 2018/1325) , regs. 1(1) , 8(4) ; 2020 c. 1 , Sch. 5 para. 1(1)substituted
F24Words in reg. 6 heading inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 9(a)inserted
F25Word in reg. 6 heading omitted (31.12.2020) by virtue of The Pipe-lines, Petroleum, Electricity Works and Oil Stocking (Miscellaneous Amendments) (EU Exit) Regulations 2018 (S.I. 2018/1325) , regs. 1(1) , 8(3) ; 2020 c. 1 , Sch. 5 para. 1(1)omitted
F26Words in reg. 6(1) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 9(b)substituted
F27Words in reg. 6(1) substituted (31.12.2020) by The Pipe-lines, Petroleum, Electricity Works and Oil Stocking (Miscellaneous Amendments) (EU Exit) Regulations 2018 (S.I. 2018/1325) , regs. 1(1) , 8(4) ; 2020 c. 1 , Sch. 5 para. 1(1)substituted
F28Word in reg. 6(2) (3) omitted (31.12.2020) by virtue of The Pipe-lines, Petroleum, Electricity Works and Oil Stocking (Miscellaneous Amendments) (EU Exit) Regulations 2018 (S.I. 2018/1325) , regs. 1(1) , 8(3) ; 2020 c. 1 , Sch. 5 para. 1(1)omitted
F29Words in reg. 7 heading inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 10(a)inserted
F30Words in reg. 7(1) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 10(b)inserted
F31Words in reg. 7(1)(a)(ii) substituted (31.12.2020) by The Pipe-lines, Petroleum, Electricity Works and Oil Stocking (Miscellaneous Amendments) (EU Exit) Regulations 2018 (S.I. 2018/1325) , regs. 1(1) , 8(4) ; 2020 c. 1 , Sch. 5 para. 1(1)substituted
F32Words in reg. 7(1)(b) omitted (31.12.2020) by virtue of The Pipe-lines, Petroleum, Electricity Works and Oil Stocking (Miscellaneous Amendments) (EU Exit) Regulations 2018 (S.I. 2018/1325) , regs. 1(1) , 8(5)(a) ; 2020 c. 1 , Sch. 5 para. 1(1)omitted
F33Words in reg. 7(1)(b) substituted (31.12.2020) by The Pipe-lines, Petroleum, Electricity Works and Oil Stocking (Miscellaneous Amendments) (EU Exit) Regulations 2018 (S.I. 2018/1325) , regs. 1(1) , 8(5)(b) ; 2020 c. 1 , Sch. 5 para. 1(1)substituted
F34Words in reg. 7(2) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 10(c)(i)inserted
F35Words in reg. 7(2) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 10(c)(ii)substituted
F36Words in reg. 7(3) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 10(d)substituted
F37Words in reg. 7(3)(g)(i) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 10(e)substituted
F38Reg. 7A inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 11inserted
F39Words in reg. 8 heading inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 12(a)inserted
F40Words in reg. 8(1) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 12(b)inserted
F41Words in reg. 8(2)(a)(ii) substituted (31.12.2020) by The Pipe-lines, Petroleum, Electricity Works and Oil Stocking (Miscellaneous Amendments) (EU Exit) Regulations 2018 (S.I. 2018/1325) , regs. 1(1) , 8(4) ; 2020 c. 1 , Sch. 5 para. 1(1)substituted
F42Reg. 8A inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 13inserted
F43Words in reg. 9 heading inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 14(a)inserted
F44Words in reg. 9(1)(a) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 14(b)(i)inserted
F45Words in reg. 9(1)(b) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 14(b)(ii)inserted
F46Words in reg. 9(2) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 14(c)substituted
F47Words in reg. 9(2)(f) substituted (31.12.2020) by The Pipe-lines, Petroleum, Electricity Works and Oil Stocking (Miscellaneous Amendments) (EU Exit) Regulations 2018 (S.I. 2018/1325) , regs. 1(1) , 8(4) ; 2020 c. 1 , Sch. 5 para. 1(1)substituted
F48Reg. 9(3) omitted (18.7.2018) by virtue of The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 14(d)omitted
F49Regs. 9A , 9B inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 15inserted
F49Regs. 9A , 9B inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 15inserted
F50Words in reg. 10 heading inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 16(a)inserted
F51Words in reg. 10(2)(a)(i) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 16(b)(i)substituted
F52Words in reg. 10(2)(a)(ii) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 16(b)(ii)substituted
F53Words in reg. 11 heading inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 17(a)inserted
F54Words in reg. 11 inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 17(b)inserted
F55Regs. 11A-11G inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 18inserted
F55Regs. 11A-11G inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 18inserted
F55Regs. 11A-11G inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 18inserted
F55Regs. 11A-11G inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 18inserted
F55Regs. 11A-11G inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 18inserted
F55Regs. 11A-11G inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 18inserted
F55Regs. 11A-11G inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 18inserted
F56Words in reg. 11A(b) inserted (31.12.2020) by The Pipe-lines, Petroleum, Electricity Works and Oil Stocking (Miscellaneous Amendments) (EU Exit) Regulations 2018 (S.I. 2018/1325) , regs. 1(1) , 8(6) ; 2020 c. 1 , Sch. 5 para. 1(1)inserted
F57Words in reg. 12 heading substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 19(a)substituted
F58Words in reg. 12(1) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 19(b)substituted
F59Words in reg. 12(3)(a) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 19(c)substituted
F60Reg. 12(3)(b) and word omitted (31.12.2020) by virtue of The Pipe-lines, Petroleum, Electricity Works and Oil Stocking (Miscellaneous Amendments) (EU Exit) Regulations 2018 (S.I. 2018/1325) , regs. 1(1) , 8(7)(a) ; 2020 c. 1 , Sch. 5 para. 1(1)omitted
F61Words in reg. 12 substituted (31.12.2020) by The Pipe-lines, Petroleum, Electricity Works and Oil Stocking (Miscellaneous Amendments) (EU Exit) Regulations 2018 (S.I. 2018/1325) , regs. 1(1) , 8(7)(b) ; 2020 c. 1 , Sch. 5 para. 1(1)substituted
F62Words in reg. 12(5) substituted (31.12.2020) by The Pipe-lines, Petroleum, Electricity Works and Oil Stocking (Miscellaneous Amendments) (EU Exit) Regulations 2018 (S.I. 2018/1325) , regs. 1(1) , 8(4) ; 2020 c. 1 , Sch. 5 para. 1(1)substituted
F63Words in reg. 12(7) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 19(b)substituted
F64Regs. 12A , 12B inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 20inserted
F64Regs. 12A , 12B inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 20inserted
F65Words in reg. 13 heading inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 21(a)inserted
F66Words in reg. 13(1) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 21(b)inserted
F67Words in reg. 13(2) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 21(c)inserted
F68Words in reg. 13 substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 21(e)substituted
F69Words in reg. 13(4)(a) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 21(d)substituted
F70Words in reg. 14 heading inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 22(a)inserted
F71Words in reg. 14(1) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 22(b)inserted
F72Words in reg. 15 heading inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 23(a)inserted
F73Words in reg. 15(1) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 23(b)inserted
F74Reg. 15A inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 24inserted
F75Words in reg. 16(3) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 25inserted
F76Words in reg. 17(4) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 26inserted
F77Words in reg. 18(4) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 27inserted
F78Word in reg. 20 heading omitted (31.12.2020) by virtue of The Pipe-lines, Petroleum, Electricity Works and Oil Stocking (Miscellaneous Amendments) (EU Exit) Regulations 2018 (S.I. 2018/1325) , regs. 1(1) , 8(3) ; 2020 c. 1 , Sch. 5 para. 1(1)omitted
F79Words in reg. 20(1) substituted (31.12.2020) by The Pipe-lines, Petroleum, Electricity Works and Oil Stocking (Miscellaneous Amendments) (EU Exit) Regulations 2018 (S.I. 2018/1325) , regs. 1(1) , 8(4) ; 2020 c. 1 , Sch. 5 para. 1(1)substituted
F80Word in reg. 20(1) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 28inserted
F81Word in reg. 20(2)(a) (b) (3) (4) omitted (31.12.2020) by virtue of The Pipe-lines, Petroleum, Electricity Works and Oil Stocking (Miscellaneous Amendments) (EU Exit) Regulations 2018 (S.I. 2018/1325) , regs. 1(1) , 8(3) ; 2020 c. 1 , Sch. 5 para. 1(1)omitted
F82Words in reg. 21 heading inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 29(a)inserted
F83Words in reg. 21(1) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 29(b)(i)inserted
F84Reg. 21(1)(e) omitted (18.7.2018) by virtue of The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 29(b)(ii)omitted
F85Words in reg. 21(1)(f) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 29(b)(iii)inserted
F86Reg. 21A inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 30inserted
F87Words in reg. 22(1)(a)(i) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 31(a)inserted
F88Words in reg. 22(1)(a)(ii) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 31(b)inserted
F89Reg. 22(1)(c)(ai) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 31(c)(i)inserted
F90Words in reg. 22(1)(c) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 31(c)(ii)inserted
F91Reg. 22(1)(d) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 31(d)inserted
F92Words in reg. 22(5) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 31(e)(i)inserted
F93Words in reg. 22(5) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 31(e)(ii)inserted
F94Words in reg. 22(5) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 31(e)(iii)inserted
F95Words in reg. 23(1)(b) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 32(a)inserted
F96Reg. 23(4) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 32(b)inserted
F97Words in reg. 25(d) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 33substituted
F98Words in reg. 27 heading inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 34(a)inserted
F99Words in reg. 27(1) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 34(b)substituted
F100Words in reg. 27(2)(c) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 34(c)substituted
F101Words in reg. 28 heading inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 35(a)inserted
F102Words in reg. 28(1) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 35(b)substituted
F103Words in reg. 28(2) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 35(b)substituted
F104Words in reg. 28(3) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 35(c)substituted
F105Words in reg. 28(4) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 35(d)substituted
F106Words in reg. 28(5) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 35(b)substituted
F107Words in reg. 29 heading inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 36(a)inserted
F108Words in reg. 29(1) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 36(b)substituted
F109Words in reg. 33(1)(a) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 37(a)inserted
F110Reg. 33(1)(aa) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 37(b)inserted
F111Words in reg. 33(1)(b) substituted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 37(c)substituted
F112Reg. 33(1)(ba) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 37(d)inserted
F113Words in reg. 33(1)(c) inserted (18.7.2018) by The Offshore Combustion Installations (Pollution Prevention and Control) (Amendment) Regulations 2018 (S.I. 2018/798) , regs. 1 , 37(e)inserted
M11999 c. 24 .
M2OJ No L 334, 17.12.2010, p17.
M32008 c. 32 .
M42008 c. 32 .
M51964 c. 29 .
M61998 c. 17 .
M7OJ No L 275, 25.10.2003, p32. This Directive has been amended by Directive 2004/101/EC of the European Parliament and of the Council in respect of the Kyoto Protocol's project mechanisms (OJ No L 338, 13.11.2004, p18), Directive 2008/101/EC of the European Parliament and of the Council so as to include aviation activities in the scheme for greenhouse gas emission allowance trading within the Community (OJ No L 8, 13.1.2009, p3) and Directive 2009/29/EC of the European Parliament and of the Council so as to improve and extend the greenhouse gas emission allowance trading scheme of the Community (OJ L 140, 5.6.2009, p63).
M8S.I. 2001/1091 , to which there are various amendments, none of which affect regulation 13(1).
M91911 c. 6 .
M101995 c. 39 .
M11S.I. 1979/1714 (N.I. 19) .
M12EMAS is the eco-management and audit scheme established pursuant to EU Regulation 1221/2009 of the European Parliament and of the Council on the voluntary participation by organisations in a Community eco-management and audit scheme (OJ L 342, 22.12.2009, p1).
M13S.I. 1987/2197 .
M141878 c. 73 .
M15S.I. 2001/1091 .
M16S.I. 2005/2055 .
M17S.I. 2007/938 .
M18S.I. 2010/1513 .
M19S.I. 2004/3391 .
Defined TermSection/ArticleIDScope of Application
a relevant decisionreg. 33. of PART 6(β€œ_prnFG2IK
a relevant provisionreg. 39. of PART 7(β€œ_prnhgcpE
a section 17(2) activityreg. 2. of PART 1(β€œ_prnx5pzX
a supplemental noticereg. 15. of PART 3(β€œ_prnWw4xI
a supplemental noticereg. 5. of PART 2(β€œ_prnzMMDb
an application noticereg. 5. of PART 2(β€œ_prndvF6J
an inspection reportreg. 29. of PART 6(β€œ_prn0rrxE
an inspectorreg. 24. of PART 6an_inspect_rtdZQIx
Annex 1reg. 2. of PART 1Annex_1_rtjZHH8
Annex 2reg. 2. of PART 1Annex_2_rt8baGk
Annex 3reg. 2. of PART 1Annex_3_rtFXJmF
available techniquesreg. 2. of PART 1legTermRFTyyUrd
bestreg. 2. of PART 1legTermwQOare1d
best available techniquesreg. 2. of PART 1legTermHV8SUpEo
carbon dioxide storage or unloading platformreg. 2. of PART 1legTermCvZz9E4G
combustion installationreg. 2. of PART 1combustion_rt7vEO8
combustion plantreg. 2. of PART 1combustion_rtRbAbI
diesel enginereg. 2. of PART 1diesel_eng_rtbtcHB
dustreg. 2. of PART 1dust_rtQ055Q
emerging techniquereg. 2. of PART 1legTermycnb0zVI
emissionreg. 2. of PART 1emission_rt9w4H7
emission limit valuereg. 2. of PART 1emission_l_rtxX3p3
enforcement noticereg. 2. of PART 1legTermXvYFUPa0
environmental inspection planreg. 27. of PART 6legTermdiR4sVNA
environmental statementreg. 4. of PART 2legTermFjeq1sPN
existing medium combustion plantreg. 2. of PART 1existing_m_rt7TkJt
fuelreg. 2. of PART 1legTermURzx3hKa
gas enginereg. 2. of PART 1gas_engine_rtRXLfZ
Gas Importation and Storage Zonereg. 2. of PART 1legTermGHvWum91
gas storage or unloading platformreg. 2. of PART 1legTerm1kNNkXBH
gas turbinereg. 2. of PART 1gas_turbin_rtCPMW1
information noticereg. 23. of PART 5informatio_rtHUmVb
large combustion installationreg. 2. of PART 1large_comb_rtMlOgI
large combustion plantreg. 2. of PART 1large_comb_rtwP4iX
medium combustion installationreg. 2. of PART 1medium_com_rttNrod
medium combustion plantreg. 2. of PART 1medium_com_rtslfZN
member Statereg. 2. of PART 1legTermckBpNoKm
milereg. 2. of PART 1legTermuMRH9mNg
new medium combustion plantreg. 2. of PART 1new_medium_rtZAbHc
new permitreg. 38. of PART 7new_permit_rtv6iPv
NOxreg. 2. of PART 1NOx_rttJ8Dn
Officerreg. 36. of PART 6legTermm1Ko3hg3
offshore areareg. 2. of PART 1legTermEHKqwX8H
offshore combustion installationreg. 2. of PART 1offshore_c_rtEFXNu
offshore combustion plantreg. 2. of PART 1offshore_c_rtZdcMh
operating hoursreg. 2. of PART 1operating__rtprcnu
operatorreg. 2. of PART 1legTermCNZbSwQl
P1reg. 25. of PART 6(β€œ_prnOx7QF
P2reg. 25. of PART 6(β€œ_prnLqnFU
partnerreg. 36. of PART 6legTermpVdj9wk5
permission noticereg. 18. of PART 4(β€œ_prn2iVEL
permitreg. 2. of PART 1legTermgqzOEtRa
personreg. 37. of PART 7person_rt6ApC6
petroleumreg. 2. of PART 1legTermggyKihah
petroleum platformreg. 2. of PART 1legTermoAv6Ry9j
pollutionreg. 2. of PART 1legTermyq4jxroY
prohibition noticereg. 2. of PART 1legTermsWoX7biJ
proper addressreg. 37. of PART 7legTerm88sc3Xpe
relevant datereg. 2. of PART 1relevant_d_rtfXQuc
relevant gas areareg. 2. of PART 1legTermtZ303RrL
relevant platformreg. 2. of PART 1legTermjbOoVsyl
secondary abatementreg. 2. of PART 1secondary__rtoLBJl
substantial change in operationreg. 12. of PART 3legTerm2rO2hOTU
surrender offerreg. 17. of PART 4(β€œ_prnHteC0
surrender offerreg. 2. of PART 1legTermm3avHcyD
techniquesreg. 2. of PART 1legTermwcNiOvgX
the 2001 Regulationsreg. 38. of PART 7legTermrcQMu303
the 2003 Directivereg. 11. of PART 2legTermvVt5MKuS
the 2010 Directivereg. 2. of PART 1legTermULtlKlm5
the Article 15(3) valuesreg. 10. of PART 2(β€œ_prnY44NX
the combined plantreg. 2A. of PART 1(β€œ_prnpiFBz
the courtreg. 33. of PART 6legTermQrH9WDIF
the courtreg. 33. of PART 6legTermEz4n3KEk
the English areareg. 33. of PART 6legTermuo6Pj2iG
the existing regulationsreg. 38. of PART 7the_existi_rthACxN
the installationreg. 4. of PART 2(β€œ_prnZk212
the MCPDreg. 2. of PART 1the_MCPD_rtCzOLr
the Northern Ireland areareg. 33. of PART 6legTermKoKh18XF
the offshore areareg. 2. of PART 1the_offsho_rtX0UZr
the proposed variationreg. 12. of PART 3(β€œ_prnq2VC3
the proposed variationreg. 12B. of PART 3(β€œ_prnqVQjb
the Scottish areareg. 33. of PART 6legTermREPsfqxM
the variation datereg. 14. of PART 3(β€œ_prnc9zB4
transboundary areareg. 20. of PART 5legTermSFe7pSER
transboundary effectsreg. 20. of PART 5(β€œ_prn4i2x6
variation datereg. 15. of PART 3(β€œ_prngC5Oz
variation noticereg. 14. of PART 3(β€œ_prnWdkG7
variation noticereg. 15. of PART 3(β€œ_prnzWnf3
Changes that affect Made by
Sort descending by Changed Legislation Sort descending by Year and Number Changed Provision Type of effect Sort descending by Affecting Legislation Title Sort descending by Year and Number Affecting Provision Sort descending by Changes made to website text Note
The Offshore Combustion Installations (Pollution Prevention and Control) Regulations 2013 2013Β No. 971 reg. 7(1)(b) word substituted The Retained EU Law (Revocation and Reform) Act 2023 (Consequential Amendments) Regulations 2025 2025Β No. 82 Sch. 13 para. 6(2)(a) Not yet
The Offshore Combustion Installations (Pollution Prevention and Control) Regulations 2013 2013Β No. 971 reg. 12(3) word substituted The Retained EU Law (Revocation and Reform) Act 2023 (Consequential Amendments) Regulations 2025 2025Β No. 82 Sch. 13 para. 6(2)(b) Not yet

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.