Statutory Instruments

2014 No. 1643

Energy

The Energy Savings Opportunity Scheme Regulations 2014

Made

24th June2014

Laid before Parliament

26th June 2014

Coming into force

17th July 2014

M1,M2The Secretary of State, being a Minister designated for the purposes of section 2(2) of the European Communities Act 1972 in relation to energy and energy sources, makes the following Regulations in exercise of the powers conferred by that section:

PART 1 Introduction

Citation and commencement

1. These Regulations may be cited as the Energy Savings Opportunity Scheme Regulations 2014 and come into force on 17th July 2014.

Interpretation

2.—(1) In these Regulations—

approval body ” has the meaning given in regulation 12(4)(b);

approved list ” has the meaning given in regulation 12(5);

approved register ” has the meaning given in regulation 12(4)(a);

[F1 areas of significant energy consumption ” has the meaning given in regulation 25(2); F1]

certified energy management system ” has the meaning given in regulation 33(1);

Chief Inspector ” has the meaning given in regulation 6(1)(b);

compliance body ” has the meaning given in regulation 6(1);

compliance date ” has the meaning given in regulation 4(4);

compliance notice ” has the meaning given in regulation 35(1);

M3 the Directive ” means Directive 2012/27/EU of the European Parliament and of the Council on energy efficiency ;

display energy certificate ” has the meaning given in regulation 34(4)(a);

employee ” has the meaning given in—

(a)

M4 section 230(1) of the Employment Rights Act 1996 in relation to England, Wales and Scotland, and

(b)

M5 article 3(1) of the Employment Rights (Northern Ireland) Order 1996 in relation to Northern Ireland;

energy ” has the meaning given in Article 2(1) of the Directive;

energy audit ” means an audit carried out, as part of an ESOS assessment, in accordance with Chapter 3 of Part 4;

energy consumption ” has the meaning given in regulation 23(1);

energy efficiency ” has the meaning given in Article 2(4) of the Directive;

[F1 energy intensity ratio ” has the meaning given in regulation 25C(2); F1]

energy measurement unit ” means a unit by which the supply or consumption of energy is commonly measured;

[F1 energy saving category ” means one of the following methods by which a participant can improve its energy efficiency

(a)

an energy management practice,

(b)

a behaviour change intervention,

(c)

training,

(d)

a control,

(e)

capital investment, or

(f)

a method not falling within paragraph (a) to (e);F1]

[F1 energy saving measure ” has the meaning given in regulation 27A(7)(d); F1]

[F1 energy saving opportunity ” has the meaning given in regulation 27(1)(c); F1]

enforcement notice ” has the meaning given in regulation 38(1);

[F1 ESOS action plan ” has the meaning given in regulation 34A(3); F1]

ESOS assessment ” means an assessment carried out in accordance with Part 4;

[F1 ESOS progress update ” has the meaning given in regulation 34B(2); F1]

[F1 ESOS report ” has the meaning given in regulation 27A(4); F1]

evidence pack ” has the meaning given in regulation 28(1);

M6 group undertaking ” has the meaning given in section 1161(5) of the Companies Act 2006 ;

highest parent ” has the meaning given in regulation 17(3);

highest parent group ” has the meaning given in regulation 17(2);

initial compliance period ” has the meaning given in regulation 4(1);

[F1 kWh ” means kilowatt hours; F1]

lead assessor ” has the meaning given in regulation 11;

legislative provision ” means an enactment, including—

(a)

an enactment comprised in, or in an instrument made under, an Act of the Scottish Parliament, and

(b)

Northern Ireland legislation;

Notification System ” has the meaning given in regulation 8(1);

offshore activity ” means activity which includes—

(a)

the exploitation of mineral resources in or under the shore or bed of waters in the offshore area,

(b)

the conversion of a place under the shore or bed of such waters for the purpose of storing gas,

(c)

the storage of gas in, under or over such waters or the recovery of gas so stored,

(d)

the unloading of gas at a place in, under or over such waters, and

(e)

the provision of accommodation for persons who work on or from an offshore installation which is maintained for the production of petroleum or the storage or unloading of gas

M7 where storing gas includes storing gas with a view to its permanent disposal, and “ gas ” means gas within the meaning of section 2(4) of the Energy Act 2008 or carbon dioxide;

offshore area ” means—

(a)

the sea adjacent to England, Scotland, Wales and Northern Ireland from the low water mark to the landward baseline of the United Kingdom territorial sea,

(b)

the United Kingdom territorial sea adjacent to England, Scotland, Wales and Northern Ireland,

(c)

M8 the sea in any designated area within the meaning of section 1(7) of the Continental Shelf Act 1964 , and

(d)

the sea in any area for the time being designated under section 41(3) of the Marine and Coastal Access Act 2009(d)

and includes the places above those areas, and the bed and subsoil of the sea within those areas;

offshore installation ” means an installation or structure used for carrying on an offshore activity, which is situated in the waters of, or on the seabed in, the offshore area, but excluding a ship or a floating structure which is not being maintained on station during the course of an offshore activity;

offshore undertaking ” means an undertaking whose activities consist wholly or mainly of offshore activities;

[F1 organisational purpose ” means one of the following purposes for which energy is consumed by assets held, or activities are carried on, by a participant

(a)

for transport,

(b)

for an industrial process,

(c)

for buildings, or

(d)

for any other purpose not falling within paragraph (a) to (c);F1]

parent undertaking ” has the meaning given in section 1162 of the Companies Act 2006 ;

participant ” has the meaning given in regulation 17(1);

the PAS ” has the meaning given in regulation 12(1);

penalty notice ” has the meaning given in regulation 39(1);

premises ” means any land, vehicle or vessel, or any plant which is designed to move or be moved;

publication penalty ” has the meaning given in regulation 41(1);

qualification date ” has the meaning given in regulation 4(3);

qualifying Green Deal assessment ” has the meaning given in regulation 34(4)(b);

[F1 reference period ” has the meaning given in regulation 22(5); F1]

relevant undertaking ” has the meaning given in regulation 15(1);

responsible officer ” has the meaning given in regulation 30(2);

responsible undertaking ” has the meaning given in regulation 18;

the Scheme ” means the Energy Savings Opportunity Scheme established by these Regulations;

scheme administrator ” has the meaning given in regulation 5;

[F1 significant energy consumption ” has the meaning given in regulation 25(4); F1]

[F1 standard industrial classification ” means the Office for National Statistics’ “UK Standard Industrial Classification of Economic Activities 2007 (SIC 2007); F1]

subsequent compliance period ” has the meaning given in regulation 4(2);

subsidiary undertaking ” has the meaning given in section 1162 of the Companies Act 2006 ;

undertaking ” has the meaning given in section 1161(1) of the Companies Act 2006 ;

working day ” means any day other than—

(a)

a Saturday or a Sunday,

(b)

Christmas Day or Good Friday, or

(c)

M9 a bank holiday within the meaning of section 1 of the Banking and Financial Dealings Act 1971 .

(2) Save as otherwise appears, any reference in these Regulations to a numbered Part, Chapter or regulation is a reference to that numbered Part, Chapter or regulation in these Regulations.

Duty to review

3.—(1) At intervals of no more than 5 years, the Secretary of State must—

(a)carry out a review of the operation and effect of these Regulations,

(b)publish the conclusions of the review in a report.

(2) In carrying out a review the Secretary of State must, so far as is reasonable, have regard to how Article 8(4) to (6) of the Directive is transposed in other Member States.

(3) Any report must in particular—

(a)set out the objectives intended to be achieved by these Regulations,

(b)assess the extent to which those objectives are achieved,

(c)assess whether those objectives remain appropriate, and

(d)where the objectives remain appropriate, assess the extent to which they could be more effectively achieved.

PART 2 The Energy Savings Opportunity Scheme

CHAPTER 1 Scheme compliance periods

Compliance periods

4. —(1) The “ initial compliance period ” means the period which begins on the coming into force of these Regulations and ends on 5th December 2015.

(2) A “ subsequent compliance period ” means a period which—

(a)begins on the 6th December immediately following the end of the preceding compliance period, and

(b)ends on the 5th December four years later.

(3) The “ qualification date ” means—

(a)in relation to the initial compliance period, 31st December 2014,

(b)in relation to a subsequent compliance period, the 31st December immediately preceding the compliance date for that compliance period.

[F2 (4) The “ compliance date ” means—

(a)in relation to the compliance period beginning on 6th December 2019—

(i)for the purposes of regulations 10 (publication of information), 22(3) (exclusion of assets no longer held on the compliance date), 26(4) (period of energy audit), 27A (ESOS report), 29 (notification of compliance) and paragraphs 7 and 7A of Schedule 2 (groups of undertakings - change of group), 5th June 2024,

(ii)for the purposes of regulations 33 (compliance with ISO 50001) and 34 (display energy certificates and green deal assessments), either 5th December 2023 or 5th June 2024, as the participant elects, and

(iii)for all other purposes, 5th December 2023, and

(b)in relation to all other compliance periods, the 5th December on which that compliance period ends.F2]

CHAPTER 2 Scheme administration

Scheme administrator

5. The “scheme administrator” is the Environment Agency.

Compliance bodies

6. —(1) The “ compliance body ” means—

(a)the scheme administrator, in respect of England,

(b) M10 the Chief Inspector constituted under regulation 8(3) of the Pollution Prevention and Control (Industrial Emissions) Regulations (Northern Ireland) 2013 (the “Chief Inspector”), in respect of Northern Ireland,

(c)the Scottish Environment Protection Agency, in respect of Scotland,

(d)the Natural Resources Body for Wales, in respect of Wales,

(e)[F3 the Secretary of State for Energy Security and Net ZeroF3] , in respect of offshore undertakings.

(2) Subject to paragraph (1), two compliance bodies may agree which of them will act as the compliance body in relation to a participant.

Co-operation and sharing of information

7.—(1) The compliance bodies must—

(a)co-operate with each other in the exercise of their functions under these Regulations,

(b)provide each other with such of the information provided to, or obtained by them, under these Regulations or any other legislative provision, as is required to enable them to carry out their functions under these Regulations.

(2) A compliance body must, when requested by another compliance body, assist it in the exercise of its functions under these Regulations, by taking any action specified in the request where it is reasonable to do so.

(3) In this regulation a reference to “ functions ” means, in relation to the Environment Agency, its functions as scheme administrator and as a compliance body.

Notification System

8. —(1) The scheme administrator must [F4 ensure the establishment of F4] a system (the “Notification System”) which enables responsible undertakings to—

(a)notify information as required by these Regulations, and

(b)voluntarily notify such additional information as the scheme administrator considers appropriate.

(2) The scheme administrator must take reasonable steps to ensure that the Notification System is available for use by responsible undertakings at such times as the scheme administrator considers reasonable.

(3) The scheme administrator may establish administrative arrangements in relation to the operation of the Notification System.

Provision of information to the Secretary of State

9. The scheme administrator must provide to the Secretary of State any information held by it by virtue of these Regulations as is requested.

Publication of information

10.[F5—(1)F5] The scheme administrator must publish the following information [F6to the extent that it isF6] held on the Notification System

(a)the number of undertakings that have complied with the Scheme[F7 excluding Part 6AF7] ,

(b)F8a list of responsible undertakings which have notified information in accordance with regulation 8(1)(a) and, where they have notified additional information under regulation 8(1)(b), ... that information.

[F9 (c)the information specified in column 3 of Tables A to I in Schedule 3,

(d)each ESOS action plan, and

(e)each ESOS progress update.F9]

[F10 (2) The scheme administrator must publish the information referred to in—

(a)paragraph (1)(a), (b) and (c), within the period of 6 months beginning with the compliance date for the compliance period to which the information relates, or within the period of 6 months beginning with the date of notification of the information using the Notification System, whichever is the later,

(b)paragraph (1)(d), within the period of 6 months beginning with the date by which the responsible undertaking must notify the ESOS action plan in accordance with regulation 34A(6), or within the period of 6 months beginning with the date of notification of the information using the Notification System, whichever is the later, and

(c)paragraph (1)(e), within the period of 6 months beginning with the date by which the responsible undertaking must notify the ESOS progress update in accordance with regulation 34B(6), or within the period of 6 months of beginning with the date of notification of the information using the Notification System, whichever is the later.F10]

CHAPTER 3 Lead assessors

Lead assessors

11. In these Regulations “ lead assessor ” means an individual whose name appears on an approved register.

Approval bodies and approved registers

M11 12. —(1) The scheme administrator must determine whether an individual meets the competence requirements (the “competence requirements”) set out in Publicly Available Specification 51215 (“the PAS”) , in accordance with this regulation and regulation 13.

(2) The scheme administrator must consider an application by a professional body for a determination that the individuals on a register maintained by that body meet the competence requirements.

(3) Where the scheme administrator is not satisfied that a register is a register of individuals who meet the competence requirements, it must make a determination to that effect and notify the professional body maintaining that register accordingly.

(4) Where the scheme administrator is satisfied that a register is a register of individuals who meet the competence requirements, it must make a determination to that effect and notify the professional body maintaining that register accordingly, and—

(a) approved register ” means a register which the scheme administrator has determined is a register of individuals who meet the competence requirements, and

(b) approval body ” means a professional body that maintains an approved register.

(5) The scheme administrator must publish a list of approved registers (the “approved list”) by 5th December 2014, and must keep that list up to date in accordance with regulation 13.

(6) An approval body must—

(a)take reasonable steps to ensure that an individual on its approved register continues to meet the competence requirements,

(b)ensure that its approved register contains an up to date record of individuals who meet the competence requirements,

(c)maintain a record of the name of any individual who is removed from its approved register, including the date on which they were removed and the reason for their removal, for four years after that removal,

(d)respond to reasonable requests from the scheme administrator, the compliance bodies and participants, for confirmation that an individual is on its approved register,

(e)notify the scheme administrator of any substantive changes to the process for including an individual on its approved register.

(7) In making a determination under paragraph (3) or (4), or reviewing the approved list under regulation 13(1), the scheme administrator may require such information from the professional body as is necessary to make its determination.

(8) For the purposes of this Chapter “ professional body ” means—

(a)a professional association, membership of which is wholly or mainly restricted to individuals who have, or are seeking to attain, a recognised level of competence appropriate to the practice of the profession concerned, or

(b)an association, the primary purpose of which is the advancement of a particular branch of knowledge or the fostering of professional expertise, connected with the past or present professions or employments of its members (whether individuals, or a body of persons corporate or unincorporated).

Reviews of approval

13.—(1) The scheme administrator

(a)must review the approved list once in every subsequent compliance period, by requiring every approval body to renew its application for approval, and

(b)may review its determination that a register is an approved register, at any time.

(2) In any case where the scheme administrator is no longer satisfied that individuals on an approved register meet the competence requirements, it must—

(a)notify the professional body maintaining that register accordingly, and of the fact that the register will be removed from the approved list in accordance with sub-paragraph (b), and

(b)remove that register from the approved list after the expiry of the time specified for appeal in regulation 14(1).

(3) The scheme administrator may, at any time, direct an approval body to review whether an individual on its approved register continues to meet the competence requirements.

Appeals

14.—(1) Where the professional body maintaining a register is notified of—

(a)a determination under regulation 12(3), or

(b)the proposed removal of that register from the approved list under regulation 13(2)(a),

that body may, within 28 days (or where that period expires on a day other than a working day, by no later than the next working day), appeal to the Secretary of State against the decision.

(2) The removal of a register from the approved list is suspended pending the resolution of the appeal referred to in paragraph (1).

PART 3 Undertakings

CHAPTER 1 Relevant undertakings

Relevant undertakings

15. —(1) Subject to regulation 16, an undertaking is a “ relevant undertaking ” in relation to a compliance period if, on the qualification date for that compliance period, it is—

(a)a large undertaking, or

(b)a small or medium undertaking which is a group undertaking in respect of a relevant undertaking falling within sub-paragraph (a).

(2) For the purposes of these Regulations whether an undertaking is a large undertaking, or is a small or medium undertaking, is to be determined in accordance with Schedule 1.

Excluded undertakings

16.—(1) The following are not relevant undertakings

(a)a public body,

(b)an undertaking to which an insolvency procedure is applied.

(2) In this regulation—

(a)M12an insolvency procedure is applied to an undertaking in the circumstances described by paragraph 120(7) of Schedule 6 to the Finance Act 2000 ,

[F11 (b) public body ” means—

(i)a public authority within the meaning of the Procurement Act 2023 (see section 2 of that Act) that is not an excluded authority within the meaning of section 2(5)(a), (c) or (d) of that Act, but as if in section 2(5)(d)(ii) the reference to paragraph (b) were omitted, or

(ii)in respect of a devolved Scottish authority, a contracting authority as defined in regulation 2(1) of the Public Contracts (Scotland) Regulations 2015;

(c) devolved Scottish authority ” has the same meaning as in section 2(6) of the Procurement Act 2023 . F11]

Participants

17. —(1) In these Regulations “ participant ” means—

(a)a relevant undertaking required to comply with the Scheme on its own behalf,

(b)where two or more relevant undertakings comply with the Scheme as a group in accordance with paragraph (2), or paragraph 1, 3, 7 [F12, 7A, 7B,F12] or 10 of Schedule 2, that group of undertakings.

(2) Where, on the qualification date for a compliance period—

(a)two or more relevant undertakings are group undertakings in respect of each other, and

(b)one of those group undertakings is a highest parent in respect of all the other group undertakings

those undertakings constitute a “ highest parent group ” for the purposes of these Regulations and must comply with the Scheme as one participant unless paragraph 1, 3, 7 [F13 , 7A, 7B, F13] or 10 of Schedule 2 apply.

(3) For the purposes of these Regulations—

(a) a parent undertaking is a “highest parent” where it has no parent undertaking which is a relevant undertaking,

(b)a highest parent is the highest parent in respect of any group undertaking in relation to which it is a parent, and

(c)an undertaking (A) is the parent undertaking of an undertaking (C) within the meaning of section 1162(5) of the Companies Act 2006, where any of A's subsidiary undertakings (B) are, or are to be treated as, parent undertakings of C, notwithstanding B is not a relevant undertaking.

CHAPTER 2 Responsible undertakings

Role of the responsible undertaking

18. The “ responsible undertaking ” in relation to a participant means the relevant undertaking which is responsible for a participant's compliance with the Scheme, determined in accordance with regulation 19 or Schedule 2.

Determination of the responsible undertaking

19.—(1) Where a relevant undertaking falls within regulation 17(1)(a), it is the responsible undertaking in relation to its own compliance with the Scheme.

(2) Subject to paragraph (3), where a highest parent group complies with the Scheme as one participant in accordance with regulation 17(2), the highest parent is the responsible undertaking in relation to that participant's compliance with the Scheme.

(3) All the relevant undertakings in a highest parent group may agree in writing that an undertaking within the group, other than the highest parent, is to be the responsible undertaking in relation to the participant's compliance with the Scheme.

(4) Where paragraph 1, 3, 7 [F14, 7A, 7B,F14] or 10 of Schedule 2 applies, the responsible undertaking is to be determined in accordance with that Schedule.

(5) Any reference in these Regulations to a responsible undertaking is to be construed in accordance with this regulation and Schedule 2.

(6) The agreements referred to in paragraph (3) and in paragraphs 2, 4, 6, 7 [F15, 7A, 7B,F15] and 11 of Schedule 2 must be made between the responsible officers of the relevant undertakings.

PART 4 ESOS Assessments

CHAPTER 1 General

Duty to carry out ESOS assessment

20. A responsible undertaking must carry out an ESOS assessment, which includes an energy audit, in accordance with this Part.

Role of the lead assessor

21.—(1) A responsible undertaking must—

(a)appoint at least one lead assessor for the purposes of the ESOS assessment,

(b)provide any appointed lead assessor with a copy of the evidence pack maintained in accordance with regulation 28 in relation to any previous ESOS assessment in relation to the participant,

(c)ensure that the ESOS assessment is reviewed by a lead assessor.

(2) In reviewing an ESOS assessment the lead assessor must—

(a)consider whether the ESOS assessment meets the requirements of these Regulations, and

(b)notify the responsible undertaking accordingly.

[F16 (3) This regulation does not apply in relation to a participant whose total energy consumption as calculated in accordance with Chapter 2 is less than 40,000 kWh of energy.F16]

[F17Estimates

21A.—(1) Where a responsible undertaking uses an estimate in accordance with these Regulations it must record details of the method used to make the estimate.

(2) Where a responsible undertaking uses an estimate in accordance with regulations 23(7), 25A(2), 25B(3) or 26(7)(b) it must—

(a)notify the scheme administrator that an estimate was used, and

(b)record in the evidence pack, the reasons why an estimate was used.F17]

CHAPTER 2 Energy consumption

Duty to calculate total energy consumption

F1822.—(1) A responsible undertaking must ... calculate the participant's total energy consumption.

(2) The calculation referred to in paragraph (1) must—

(a)be carried out on or after the qualification date for the compliance period,

(b)subject to paragraph (3), be based on the energy consumption of assets held, and activities carried on, by the participant on the qualification date for that compliance period, and

(c)be based on the participant's energy consumption during the reference period.

(3) A responsible undertaking may elect to exclude from the calculation referred to in paragraph (1) energy consumed by any asset which is no longer held by it, or by any activity which is no longer carried on by it (or, in the case of two or more relevant undertakings complying with the Scheme as one participant, any asset which is no longer held, or any activity which is no longer carried on, by any of those relevant undertakings) on the compliance date.

(4) In these Regulations—

(a) activities carried on ” includes offshore activities,

(b) assets held ” includes offshore installations.

(5) The “ reference period ”, in relation to a compliance period, means a period of 12 consecutive months which—

(a)begins no more than 12 months before the qualification date, and

(b)ends on or before the compliance date.

Energy consumption – general

23. —(1) Subject to regulation 24, the “energy consumption” of a participant means energy that is—

(a)supplied to the participant, and

(b)consumed by assets held, or activities carried on, by the participant

but excludes any energy which is supplied by the participant to another person.

(2) For the purposes of paragraph (1)—

(a)energy is supplied to a participant where—

(i) the participant (or, in the case of two or more relevant undertakings complying with the Scheme as one participant, one or more of them) agrees with a person (“S”) that S will supply energy to the participant, and the participant is supplied with energy further to that agreement,

(ii)two or more relevant undertakings agree with S that S will supply energy to them and they are supplied with energy further to that agreement, and one or more of them agrees to be the participant in relation to some or all of that energy supply, or

(iii)the participant supplies energy, other than surplus heat, to itself, and

(b) energy is supplied by a participant to another person (“R”), where the participant (or, in the case of two or more relevant undertakings complying with the Scheme as one participant, one or more of them) agrees with R that the participant will supply energy to R, and R is supplied with energy further to that agreement,

and the amount of the supply is measured.

(3) In this regulation “ surplus heat ” means heat generated as a by-product of an industrial process carried on by the participant (or, in the case of two or more relevant undertakings complying with the Scheme as one participant, carried on by one or more of them).

(4) Subject to regulation 24(3) and (4), the energy consumption of a participant

(a)in the case of an offshore undertaking, excludes energy which is consumed by the participant outside the United Kingdom and offshore area,

(b)in any other case, excludes energy which is consumed by the participant outside the United Kingdom.

(5) In this regulation energy supplied or consumed is “measured” where—

(a)the amount of energy is measured in energy measurement units, or

(b) the cost of the energy is measured (“energy spend”).

(6) In calculating measured energy supplied or consumed for the purposes of this Chapter, a responsible undertaking must base that calculation—

(a)(except in the case of energy supplied by the participant to another person) on only one of the methods set out in paragraph (5), and

(b)where reasonably practicable, on verifiable data.

(7) Where verifiable data is not available for all of the reference period

(a)F19the calculation may be based on reasonable estimates of the amount of energy consumed, or the energy spend ...

F20(b). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Energy consumption - transport

24.—(1) In relation to energy consumed for the purposes of transport, the energy consumption of a participant also includes energy that is—

(a)supplied to an individual who is authorised by the participant (or, in the case of two or more relevant undertakings complying with the Scheme as one participant, authorised by one or more of them) to receive the supply of energy for the purposes of transport, and

(b)consumed for the purposes of transport by that individual in the course of their employment by, or acting on the business of, the participant.

(2) For the purposes of these Regulations—

(a) energy consumed for the purposes of transport ” means energy used by a road going vehicle, a vessel, an aircraft or a train,

(b) aircraft ” means a self-propelled machine that can move through the air other than against the earth's surface,

(c) road going vehicle ” means any vehicle—

(i)M13in respect of which a vehicle licence is required under the Vehicle Excise and Registration Act 1994 , or

(ii)which is an exempt vehicle under that Act,

(d) M14 train ” has the meaning given in section 83 of the Railways Act 1993 , and

(e) vessel ” means any boat or ship which is self-propelled and operates in or under water.

(3) The energy consumption of a participant includes energy which is consumed for the purposes of transport by an aircraft or a vessel during the course of any journey which—

(a)starts,

(b)ends, or

(c)both starts and ends

within the United Kingdom.

(4) Notwithstanding regulation 23(4), a participant may elect to include—

(a)energy consumed for the purposes of transport by an aircraft or a vessel, during the course of a journey which both starts, and ends, outside the United Kingdom,

(b)energy consumed outside the United Kingdom for the purposes of transport by a road going vehicle or a train.

Identification of areas of significant energy consumption

25. —(1) After calculating the participant's total energy consumption in accordance with this Chapter, the responsible undertaking may elect to identify the participant's “ areas of significant energy consumption ” for the purposes of [F21 Chapters 2A and 3 F21] of this Part.

(2) In these Regulations a participant's “ areas of significant energy consumption ” means those assets held, or activities carried on, by the participant which together account for not less than [F22 95% F22] of the participant's total energy consumption

(a)measured in energy measurement units, or

(b)measured by energy spend.

[F23 (3) Where the responsible undertaking elects to identify the participant’s areas of significant energy consumption, the responsible undertaking must calculate the participant’s significant energy consumption.

(4) In these Regulations “ significant energy consumption, ” in relation to a participant, means the amount of the participant’s total energy consumption that is accounted for by the participant’s areas of significant energy consumption. F23]

[F24Conversion into kWh units

25A.—(1) Where a participant’s total energy consumption, or, if applicable, significant energy consumption, as calculated in accordance with this Chapter, is not measured in kWh, the responsible undertaking must convert the participant’s total energy consumption, or significant energy consumption into kWh.

(2) The conversion under paragraph (1) must—

(a)where reasonably practicable, be based on verifiable data, or

(b)otherwise, be based on a reasonable estimate of the amount of energy consumed in kWh.F24]

[F25Chapter 2A Calculations related to organisational purposes

Amount of energy consumption related to organisational purposes

25B.—(1) After calculating the participant’s total energy consumption in accordance with Chapter 2, the responsible undertaking must calculate—

(a)in any case where the responsible undertaking has elected to identify the participant’s areas of significant energy consumption, the amount of the participant’s significant energy consumption that is attributable to each organisational purpose expressed in kWh, or

(b)in any other case, the amount of the participant’s total energy consumption that is attributable to each organisational purpose, expressed in kWh.

(2) When added together, the results of the calculations—

(a)under paragraph (1)(a) must equal the participant’s significant energy consumption, or

(b)under paragraph (1)(b) must equal the participant’s total energy consumption.

(3) The calculations under paragraph (1)(a) or (b) must—

(a)where reasonably practicable, be based on verifiable data, or

(b)otherwise, be based on a reasonable estimate of the amount of the participant’s significant energy consumption or the amount of the participant’s total energy consumption, as the case may be, that is attributable to the organisational purpose.

Energy Intensity Ratio

25C.—(1) After carrying out the calculations referred to in regulation 25B(1)(a) or (b), the responsible undertaking must calculate at least one energy intensity ratio in relation to each organisational purpose.

(2) Paragraph (1) does not apply in relation to an organisational purpose if the result of the calculation carried out under regulation 25B(1) in respect of the organisational purpose is zero.

(3) In these Regulations, an “ energy intensity ratio ” in relation to an organisational purpose, is a ratio which expresses A in relation to B, where—

A ” is the result of the calculation carried out under regulation 25B(1) in respect of the organisational purpose, and

B ” is a quantifiable factor associated with assets held, or activities carried out by the participant for the organisational purpose, over the reference period. F25]

CHAPTER 3 Energy savings opportunities

Duty to carry out an energy audit

26.—(1) Subject to Part 6, a responsible undertaking must carry out an energy audit in accordance with this Chapter—

(a)in any case where the responsible undertaking has identified the participant's areas of significant energy consumption, in relation to those areas of significant energy consumption, or

(b)in any other case, in relation to the participant's total energy consumption.

(2) A responsible undertaking may elect to comply with the requirements of paragraph (1) by carrying out two or more energy audits, each relating to a different area of the participant's energy consumption.

(3) So far as reasonably practicable, an energy audit must be based on verifiable data evidencing the participant's energy consumption in relation to its areas of significant energy consumption (or, where paragraph (1)(b) applies, its total energy consumption), measured in energy measurement units, over a 12 month period.

[F26 (3A) An energy audit must include visits to sites that the responsible undertaking considers are representative of how energy is used by the assets held, and activities carried on, by the participant during the 12 month period referred to in paragraph (3).F26]

(4) Subject to paragraph (5), the 12 month period referred to in paragraph (3) must be a period of 12 consecutive months which—

(a)in relation to the initial compliance period, begins—

(i)no earlier than 6th December 2010, and

(ii)no more than 24 months before the commencement of the energy audit,

(b)in relation to a subsequent compliance period, begins—

(i)no more than 12 months before the start of the compliance period, and

(ii)no more than 24 months before the commencement of the energy audit, and

ends on or before the compliance date for that compliance period.

(5) The 12 month period must be such that no data is used as the basis for energy audits carried out in more than one compliance period.

(6) Where a responsible undertaking elects, in accordance with paragraph (2), to carry out two or more energy audits in relation to different areas of its energy consumption, the participant may use different 12 month periods for each of those audits.

(7) In any case where verifiable data evidencing the participant's energy consumption is not available for a 12 month period in accordance with paragraph (3), the energy audit may be based on—

(a)verifiable data evidencing the participant's energy consumption over a shorter period, provided that the requirements of paragraph (4) are complied with, or

(b)a reasonable estimate of the participant's energy consumption over the 12 month period referred to in paragraph (3).

F27(8) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

[F28 (9) The responsible undertaking must record details of how it has carried out each energy audit in accordance with this Chapter including—

(a)the period during which the energy audit was carried out,

(b)the 12 month period to which the energy audit relates,

(c)as measured in accordance with paragraph (3)—

(i)the participant’s energy consumption in relation to its areas of significant energy consumption, or

(ii)where paragraph (1)(b) applies, the participant’s total energy consumption,

(d)the number of sites at which the participant holds assets, or carries on activities, to which the energy audit relates,

(e)the number of sites visited for the energy audit,

(f)the reasons why the sites visited for the energy audit are considered to be representative of how energy is used by the range of assets held, and activities carried on, by the participant during the 12 month period to which the energy audit relates, and

(g)where paragraph (7)(a) applies, details of the extent to which, and the reasons why, 12 months’ verifiable data was not used.F28]

Identification of energy saving opportunities

27.—(1) An energy audit must, so far as reasonably practicable—

(a)analyse the participant's energy consumption and energy efficiency,

(b)identify any way in which the participant can improve its energy efficiency,

(c) F29 recommend any measure falling within sub-paragraph (b) which is reasonably practicable and cost effective for the participant to implement (an “energy saving opportunity”), ...

[F30 (d)in respect of each energy saving opportunity

(i)identify the organisational purpose to which the energy saving opportunity most closely relates,

(ii)identify the energy saving category to which the energy saving opportunity most closely relates,

(iii)identify any considerations relevant to the implementation of the energy saving opportunity, including, if applicable—

(aa)any considerations arising from an obligation of any person under Part 3 of the Energy Efficiency (Private Rented Property) (England and Wales) Regulations 2015, in relation to any buildings used by the participant, and

(bb)information on any schemes under which grants or public funds from the United Kingdom Government, Scottish Government, Welsh Government or Northern Ireland Government may be available to support implementation of the energy saving opportunity,

(iv)estimate, in pounds, the costs and benefits of implementing the energy saving opportunity,

(v)identify any other non-financial costs and benefits that are not included in the estimate referred to in sub-paragraph (iv),

(vi)estimate the annual reduction in energy spend and the annual reduction in energy consumption which would be achieved as a result of implementing the energy saving opportunity, and

(vii)calculate the payback period for the energy saving opportunity, andF30]

[F31 (e)recommend a programme for implementation of the energy saving opportunities (if any), including—

(i)a timescale for implementation of the energy saving opportunities,

(ii)the estimated costs and benefits of implementing the programme, and

(iii)the payback period calculated for the programme.F31]

(2) The analysis required by paragraph (1)(a) must, where appropriate and reasonably practicable, be based on “energy consumption profiles”.

(3) For the purposes of this regulation, “ energy consumption profile ” means—

(a)a breakdown of the different ways in which energy is consumed by activities carried on, and assets held, by the participant, and

(b)where appropriate, an analysis of any variations in that energy use.

(4) For the purposes of paragraph (1)(c), whether a measure is cost effective to implement must be determined by reference to—

(a)the estimated reduction in energy consumption which would be achieved as a result of the measure being implemented, calculated in terms of energy measurement units or energy spend, and

(b)the estimated cost of implementing the measure.

(5) Whenever practicable, the cost of implementing a measure must be based on an analysis of whether the investment in the measure will be economical over its entire life, taking into account the costs of implementing the measure, including the costs of purchase, installation, maintenance, and depreciation.

(6) In any case where the energy audit does not include an analysis based on energy consumption profiles, the responsible undertaking must—

(a)notify the scheme administrator accordingly, and

(b)record details of the alternative method of analysis used and the extent to which, and the reasons why, the energy audit does not include an analysis based on energy consumption profiles.

[F32 (7) In these Regulations—

payback period ” in relation to an energy saving opportunity or programme means the period of time in years calculated as—

where—

[F33Chapter 3A ESOS Report

ESOS Report

27A.—(1) A responsible undertaking must produce an ESOS report in relation to each ESOS assessment.

(2) Paragraph (1) does not apply in relation to an ESOS assessment carried out for a compliance period ending on or before 5th December 2019.

(3) The ESOS report must be produced before the compliance date for the compliance period to which the ESOS assessment relates.

(4) In these Regulations, an “ESOS report” is a written record containing—

(a)the information required by paragraph (5),

(b)where the responsible undertaking has conducted an energy audit under Chapter 3, the information required by paragraph (6),

(c)where the participant is deemed to have complied with Chapter 3 by virtue of Part 6, the information required by paragraph (7),

(d)the information specified in column 1 of Tables A, C and E in Schedule 3,

(e)where the responsible undertaking is one of two or more relevant undertakings complying with the Scheme as one participant, the information specified in column 1 of Table B in Schedule 3, and

(f)where a lead assessor is required to be appointed under regulation 21, the information specified in column 1 of Table D in Schedule 3.

(5) An ESOS report must include—

(a)the participant’s total energy consumption,

(b)where the responsible undertaking has elected to identify the participant’s areas of significant energy consumption, the participant’s significant energy consumption, expressed in kWh, and the percentage of the participant’s total energy consumption it represents,

(c)the energy intensity ratios calculated in accordance with regulation 25C, and

(d)an estimate of energy savings achieved by the participant, produced in accordance with regulation 27B(1).

(6) Where a responsible undertaking has conducted an energy audit under Chapter 3, the ESOS report must include in relation to the energy audit

(a)the information required to be recorded in accordance with sub-paragraphs (a) to (f) of regulation 26(9),

(b)a description of the analysis carried out in accordance with regulation 27(1)(a),

(c)the information referred to in sub-paragraphs (b) to (e) of regulation 27(1),

(d)the sum of all the estimates made in accordance with regulation 27(1)(d)(vi) (annual reductions in energy spend and energy consumption),

(e)for each organisational purpose, the sum of the estimates made in accordance with regulation 27(1)(d)(vi) in respect of energy saving opportunities that are identified in accordance with regulation 27(1)(d)(i) as most closely relating to that organisational purpose, and

(f)for each energy saving category, the sum of the estimates made in accordance with regulation 27(1)(d)(vi) in respect of any energy saving opportunities that are identified in accordance with regulation 27(1)(d)(ii) as most closely relating to that energy saving category.

(7) Where the participant is deemed to have complied with Chapter 3 by virtue of Part 6, an ESOS report must include—

(a)where compliance is by virtue of regulation 33 (compliance with ISO 50001), information on which assets held, or activities carried on by the participant fall under the certified energy management system,

(b)where compliance is by virtue of regulation 34 (display energy certificates and green deal assessments), information on which assets held, or activities carried on by the participant are connected to a building referred to in regulation 34(1),

(c)the percentage of the participant’s total energy consumption that falls within regulation 33(2) or 34(2),

(d) any way in which the participant can improve its energy efficiency that is recommended to the participant through its method of deemed compliance with Chapter 3 (“an energy saving measure”),

(e)to the extent that the participant has obtained the information through its method of deemed compliance with Chapter 3—

(i)the organisational purpose and the energy saving category to which each energy saving measure most closely relates,

(ii)the estimated annual reduction in energy spend and energy consumption from implementing each energy saving measure,

(iii)the sum of all the estimates made in accordance with paragraph (ii),

(iv)for each organisation purpose, the sum of the estimates made in accordance with paragraph (ii) in respect of any energy saving measures that are identified in accordance with paragraph (i) as most closely relating to that organisational purpose, and

(v)for each energy saving category, the sum of the estimates made in accordance with paragraph (ii) in respect of any energy saving measures that are identified in accordance with paragraph (i) as most closely relating to that energy saving category,

(f)considerations relevant to the implementation of each energy saving measure, including, if applicable—

(i)any considerations arising from an obligation of any person under Part 3 of the Energy Efficiency (Private Rented Property) (England and Wales) Regulations 2015, in relation to any buildings used by the participant, and

(ii)information on any existing schemes under which grants or public funds from the United Kingdom Government, Scottish Government, Welsh Government or Northern Ireland Government may be available to support implementation of the energy saving measure, and

(g)a programme, including a timescale, for implementation of the energy saving measures (if any).

(8) In this regulation—

(a)references to a participant’s method of deemed compliance with Chapter 3 mean—

(i)where compliance is by virtue of regulation 33, the certified energy management system referred to in that regulation,

(ii)where compliance is by virtue of regulation 34(1)(a), the display energy certificate referred to in that regulation,

(iii)where compliance is by virtue of regulation 34(1)(b), the qualifying Green Deal assessment referred to in that regulation.

(b)references to a participant’s total energy consumption are references to the participant’s total energy consumption, in kWh, as calculated in accordance with Chapter 2.

Energy savings since the previous compliance date

27B.—(1) In preparation of an ESOS report under regulation 27A, a responsible undertaking must produce an estimate of energy savings achieved by the participant in the period beginning immediately after the previous compliance date and ending on the compliance date for the compliance period to which the ESOS report relates.

(2) The responsible undertaking must also—

(a)estimate the proportion of the energy savings referred to in paragraph (1) that most closely relates to each organisational purpose,

(b)identify, where reasonably practicable, the measures implemented by the participant to achieve the energy savings referred to in paragraph (1), and

(c)for each measure identified in accordance with sub-paragraph (b)—

(i)identify the energy saving category to which the measure most closely relates, and

(ii)calculate the payback period for the measure.

(3) Paragraph (2)(c) does not apply to a measure unless the energy saving category to which the measure most closely relates, and the payback period for the measure, has been previously identified and calculated, as the case may be, in an energy audit under Chapter 3.

(4) In this regulation, “payback period” has the same meaning in relation to a measure as it has in regulation 27(7) in relation to an energy saving opportunity or programme.

Disclosure of information to group undertaking

27C.—(1) Subject to paragraphs (2) and (3), where there is any group undertaking in relation to the responsible undertaking on the qualification date for the compliance period to which the ESOS report relates, the responsible undertaking must disclose to the group undertaking those parts of the ESOS report and the evidence pack relevant to the group undertaking.

(2) The responsible undertaking is not required to disclose any part of the evidence pack to the group undertaking unless the participant is deemed to have complied with Chapter 3 by virtue of Part 6.

(3) To the extent that disclosure of those parts of the ESOS report or the evidence pack relevant to the group undertaking is prohibited by law—

(a)paragraph (1) does not apply, and

(b)the responsible undertaking must notify the scheme administrator using the Notification System identifying—

(i)the parts of the ESOS report or the evidence pack that the responsible undertaking is prohibited from disclosing to the group undertaking, and

(ii)the reasons why the responsible undertaking considers that disclosure of those parts of the ESOS report or the evidence pack is prohibited by law.

(4) For the purposes of this regulation, the parts of an ESOS report and evidence pack relevant to a group undertaking are those parts identifying—

(a)where the responsible undertaking has conducted an energy audit under Chapter 3—

(i)any energy saving opportunity which relates to energy consumed, assets held, or activities carried on by the group undertaking,

(ii)the estimated costs and benefits of implementing any such energy saving opportunity,

(iii)any considerations relevant to the implementation of any such energy saving opportunity, and

(iv)any analysis of energy consumption and energy efficiency carried out in accordance with regulation 27(1)(a), including any energy consumption profiles produced in accordance with regulation 27(2) and (3) which relates to energy consumed, assets held, or activities carried on by the group undertaking, and

(b)where the participant is deemed to have complied with Chapter 3 by virtue of Part 6—

(i)where compliance is by virtue of regulation 33, any information under an ISO50001 energy management system as defined in that regulation relating to energy reviews which may relate to such group undertaking,

(ii)where compliance is by virtue of regulation 34, any display energy certificate as defined in that regulation which may relate to such group undertaking,

(iii)documented outputs of qualifying Green Deal assessments as defined in regulation 34 which may relate to such group undertaking,

(iv)any energy saving measure which relates to energy consumed, assets held, or activities carried on, by the group undertaking, and

(v)any considerations relevant to the implementation of any such energy saving measure.F33]

CHAPTER 4 Records

Evidence packs

28. —(1) A responsible undertaking must maintain a written record in relation to each ESOS assessment carried out by it (the “evidence pack”) which includes—

(a)records of any data used for the purposes of—

(i)the calculation of total energy consumption under Chapter 2 of this Part,

(ii)the identification of areas of significant energy consumption under regulation 25,

(iii)the energy audit under Chapter 3 of this Part, including in particular the identification of energy saving opportunities under regulation 27,

(b)evidence of the certification of any certified energy management system, and any display energy certificate or qualifying Green Deal assessment, relied on by the participant in accordance with Part 6,

(c)any agreement made in accordance with regulation 19(3), or paragraph 2, 4, 6, 7 [F34, 7A, 7BF34] or 11 of Schedule 2,

(d)F35the notification given by the lead assessor under regulation 21(2)(b), ...

(e)any information recorded [F36in accordance with regulation 21A(1), 27(6)(b), 34A(5)(b) or 34B(5)(b)F36] ,

[F37 (f)any ESOS report,

(g)the information notified to the scheme administrator in accordance with regulation 29,

(h)any ESOS action plan, and

(i)any ESOS progress update.F37]

[F38 (2) The evidence pack must be kept—

(a)in relation to the initial compliance period, until at least 5th June 2024, and

(b)in relation to any other compliance period, for at least two subsequent compliance periods following the compliance period to which it relates.F38]

PART 5 [F39Notification and confirmation requirements for ESOS AssessmentsF39]

Notification of compliance

29.[F40—(1)F40] A responsible undertaking must notify the scheme administrator using the Notification System whether the participant has complied with Part 4, (or, as the case may be, Part 6) in relation to a compliance period by providing—

[F41 (a)where the responsible undertaking has conducted an energy audit under Chapter 3 of Part 4, the information specified in column 2 of tables A, C and E, F, G and H in Schedule 3,

(aa)where the participant is deemed to have complied with Chapter 3 of Part 4 by virtue of Part 6—

(i)to the extent not already provided under sub-paragraph (a), the information specified in column 2 of tables A, C, E, F, and H in Schedule 3,

(ii)to the extent that the information is obtained by the participant through its method of deemed compliance with Chapter 3 of Part 4, the information specified in column 2 of Table G in Schedule 3, and

(iii)the information specified in column 2 of Table I in Schedule 3,

(ab)where the responsible undertaking is one of two or more relevant undertakings complying with the Scheme as one participant, the information specified in column 2 of Table B in Schedule 3,

(ac)where a lead assessor is required to be appointed under regulation 21, the information specified in column 2 of Table D in Schedule 3, andF41]

(b)the confirmation required by regulation 31

after the qualification date, and by no later than the compliance date, for that compliance period.

[F42 (2) In paragraph (1)(aa)(ii), references to the participant’s “method of deemed compliance with Chapter 3 of Part 4” have the same meaning as references to “method of deemed compliance with Chapter 3” in regulation 27A(8). F42]

Responsible officers

30.—(1) A participant must appoint one or more responsible officers in relation to an ESOS assessment.

(2) In these Regulations “ responsible officer ” means a person who is nominated for the purposes of these Regulations and is—

(a) M15 where applicable, a director of the participant (or, in the case of two or more relevant undertakings complying with the Scheme as one participant, a director of one of them) within the meaning of section 250 of the Companies Act 2006 (a “director”) , or

(b)where there is no person falling within sub-paragraph (a) in relation to a participant, a person exercising management control in the participant (or, in the case of two or more relevant undertakings complying with the Scheme as one participant, such a person in relation to one or more of the relevant undertakings).

(3) In any case where the lead assessor appointed under regulation 21(1) is independent of the participant, one responsible officer must be nominated, and in any other case, two responsible officers must be nominated.

[F43 (3A) In any case where a lead assessor is not required to be appointed by virtue of regulation 21(3), two responsible officers must be nominated.F43]

(4) For the purposes of this regulation a person appointed by a responsible undertaking as lead assessor is independent of the participant if they are not—

(a)connected with it by virtue of being a person who is, or has in the last 12 months been—

(i)an employee,

(ii)a director, partner or other person exercising management control, or

(iii)a shareholder

of the participant, or

(b)a spouse or civil partner of a person falling within sub-paragraph (a).

Confirmation to be given by responsible officer

31. A notification required by regulation 29 must include confirmation that—

(a)the responsible officer is satisfied to the best of their knowledge that—

(i)the participant is within the scope of the Scheme, and

(ii)the responsible undertaking has complied with [F44Parts 4 to 6,F44]

[F45 (iii)the information provided under regulation 29(a) to (ac) is correct, andF45]

(b)the responsible officer has seen and considered the recommendations of the audit and any alternative routes to compliance relied upon in accordance with Part 6.

PART 6 Alternative routes to compliance

Energy consumption not subject to audit

32. Any energy consumption of an undertaking which falls within this Part is not required to be audited under Chapter 3 of Part 4.

Compliance with ISO 50001

33. —(1) This regulation applies in any case where a participant's energy management system is certified, within the [F46 relevant period F46] , as being in compliance with ISO 50001 (a “certified energy management system”), and that certification remains valid on the compliance date.

(2) The participant is deemed to have complied with Chapter 3 of Part 4 in relation to its energy consumption which falls under the certified energy management system.

(3) Where the total energy consumption of a participant falls under the certified energy management system, the participant is deemed to have complied with

[F47 (a)the duty to carry out an energy audit in regulation 20,

(b)regulation 21, and

(c)Chapter 3 of Part 4F47] .

(4) In this regulation—

(a) certified ” means certified by a body that is accredited, for the purpose of certifying compliance with ISO 50001, by at least one of the following—

(i)a member of the International Accreditation Forum,

(ii)a national accreditation body [F48of a Member StateF48] ,

[F49 (iii)the national accreditation body of the United Kingdom appointed in accordance with Article 4(1) of Regulation (EC) No 765/2008 of the European Parliament and of the Council,F49]

(b) energy management system ” has the meaning given in Article 2(11) of the Directive,

(c) F51 ISO 50001 ” means the international standard “ 50001:2011 Energy management systems – Requirements with guidance for use M16[F50 or the international standard “ 50001:2018 Energy management systems – Requirements with guidance for use F50] , ...

(d) national accreditation body [F52 of a Member State F52] ” means a national accreditation body of a Member State within the meaning of Article 2(11) of Regulation (EC) no 765/2008 of the European Parliament and of the Council M17[F53 as it has effect in EU law F53] ,

[F54 (e) relevant period ” means—

(i)in the case of the compliance period beginning on 6th December 2019, the period beginning on that date and ending on the compliance date,

(ii)in any other case, the compliance period.F54]

Display Energy Certificates and Green Deal Assessments

34.—(1) This regulation applies in any case where, in relation to a building occupied by a relevant undertaking

(a)a display energy certificate has been issued during the [F55relevant periodF55] , and remains valid on the compliance date, or

(b)a qualifying Green Deal assessment has been carried out during the [F56relevant periodF56] and remains valid on the compliance date.

(2) The relevant undertaking is deemed to have complied with Chapter 3 of Part 4 in relation to its energy consumption connected to that building.

(3) In any case where only part of the energy consumption of a participant falls within paragraph (2) the participant

(a)must consider whether the display energy certificate, or the qualifying Green Deal assessment (as the case may be) relates to all of its areas of significant energy consumption (or, where regulation 26(1)(b) applies, to all of its energy consumption), and

(b)must comply with Chapter 3 of Part 4 in relation to any of its areas of significant energy consumption (or, where regulation 26(1)(b) applies, to any of its energy consumption) which do not fall within paragraph (2).

(4) In this regulation—

(a) display energy certificate ” means—

(i)M18in relation to a building in England or Wales, a display energy certificate which complies with regulation 15 of the Energy Performance of Buildings (England and Wales) Regulations 2012 and a valid recommendation report within the meaning of regulation 4 of those Regulations, and

(ii)M19in relation to a building in Northern Ireland, a display energy certificate which complies with regulation 12 of the Energy Performance of Buildings (Certificates and Inspections) Regulations (Northern Ireland) 2008 and a valid advisory report within the meaning of regulation 2(1) of those Regulations,

(b) M20 qualifying Green Deal assessment ” means an energy efficiency assessment within the meaning given in regulation 7 of the Green Deal Framework (Disclosure, Acknowledgement, Redress etc. ) Regulations 2012 ,

[F57 (c) relevant period ” has the same meaning as in regulation 33(4)(e). F57]

[F58Part 6A ESOS action plan and ESOS progress update

ESOS action plan

34A.—(1) Following a notification by a responsible undertaking under regulation 29(1) in relation to a compliance period, the responsible undertaking must produce an ESOS action plan. 

(2) Paragraph (1) does not apply to a notification made under regulation 29(1) in relation to a compliance period ending on or before 5th December 2019.

(3) An “ESOS action plan” is a written record—

(a)setting out—

(i)each measure to improve its energy efficiency that the participant proposes to implement before the end of the relevant compliance period,

(ii)whether the measure was recommended by an energy audit in accordance with regulation 27(1)(c),

(iii)the date by which the participant proposes to implement the measure,

(iv)an estimate of the total energy savings that the participant reasonably expects to achieve during the relevant compliance period by implementing the measure, in energy measurement units,

(v)an estimate of the amount of the energy savings referred to in paragraph (iv) that the participant reasonably expects to achieve in relation to each organisational purpose, in energy measurement units, and

(vi)the method used to calculate the estimate under paragraph (iv), or

(b)containing a statement that there is no measure to improve its energy efficiency that the participant proposes to implement before the end of the relevant compliance period.

(4) Where the ESOS action plan contains an estimate in accordance with paragraph (3)(a)(iv), the responsible undertaking must identify whether the estimate is based on—

(a)the estimated benefits calculated as part of the energy audit carried out in accordance with regulation 27(1)(d),

(b)estimated energy savings calculated through a method of deemed compliance with Chapter 3 of Part 4, or

(c)another reasonable estimation method.

(5) Where an estimate is based on another reasonable estimation method by virtue of paragraph 4(c), the responsible undertaking must—

(a)record a brief description of the method used to estimate the energy savings, and

(b)record the reason for using this method in the evidence pack.

(6) Using the Notification System, the responsible undertaking must notify the scheme administrator of the ESOS action plan by providing—

(a)the ESOS action plan, and

(b)the confirmation required by paragraph (8).

(7) The notification required by paragraph (6) must be provided—

(a)in relation to the compliance period beginning on 6th December 2019 by 5 December 2024, and

(b)in relation to all other compliance periods, within the period starting on the first day of the relevant compliance period and ending on the day before the one-year anniversary of that date.

(8) The notification required by paragraph (6) must include confirmation that—

(a)the responsible officer is satisfied to the best of their knowledge that the responsible undertaking has complied with paragraphs (1) to (5), and

(b)the responsible officer has seen and considered the ESOS action plan.

(9) In paragraph (4)(b), references to the participant’s “method of deemed compliance with Chapter 3 of Part 4” have the same meaning as references to “method of deemed compliance with Chapter 3” in regulation 27A(8).

(10) In this Regulation “ relevant compliance period ” means the compliance period following the compliance period to which the notification referred to in paragraph (1) relates.

ESOS progress update

34B. —(1) Following notification of an ESOS action plan under regulation 34A(6) (“the latest ESOS action plan”), the responsible undertaking must produce—

(a) an ESOS progress update during the period starting on the one year anniversary of the first day of the relevant compliance period and ending on the day before the two year anniversary of the first day of the relevant compliance period (“an initial progress update”), and

(b) an ESOS progress update during the period starting on the two year anniversary of the first day of the relevant compliance period and ending on the day before the three year anniversary of the first day of the relevant compliance period (“a further progress update”).

(2) An ESOS progress update is a written record identifying any action taken by or on behalf of the participant since the relevant event to implement measures to improve the participant’s energy efficiency.

(3) An ESOS progress update must include—

(a)information identifying—

(i)any measure set out in the latest ESOS action plan that the participant has implemented since the relevant event,

(ii)whether such measure was implemented by any date specified for it in the latest ESOS action plan, and

(iii)any measure set out in the latest ESOS action plan that the participant has not implemented by any date specified for it in the latest ESOS action plan, and

(b)an estimate for the reduction in energy consumption that has been, or will be achieved during the relevant reporting period as a result of the actions identified in the ESOS progress update, calculated in energy measurement units, and

(c)the method used to produce the estimate in accordance with sub-paragraph (b).

(4) In relation to the estimate referred to in paragraph (3)(b), the responsible undertaking must identify whether the estimate is based on—

(a)an estimate of the reduction in energy consumption produced as part of an energy audit carried out in accordance with regulation 27(1)(d)(vi),

(b)an estimate included in the latest ESOS action plan, or

(c)another reasonable estimation method.

(5) Where an estimate is based on another reasonable estimation method by virtue of paragraph 4(c), the responsible undertaking must—

(a)record a brief description of the method used to estimate the reduction in energy consumption, and

(b)record the reason for using this method in the evidence pack.

(6) Using the Notification System, the responsible undertaking must notify the scheme administrator of the ESOS progress update by providing—

(a)the ESOS progress update, and

(b)the confirmation required by paragraph (7)

within the relevant reporting period.

(7) The notification required by paragraph (6) must include confirmation that—

(a)the responsible officer is satisfied to the best of their knowledge that the responsible undertaking has complied with paragraphs (1) to (5), and

(b)the responsible officer has seen and considered the ESOS progress update.

(8) In this Regulation—

relevant compliance period ” has the same meaning as in regulation 34A(10),

relevant event ” means—

(a)

in the case of an initial progress update, the notification of the latest ESOS action plan under regulation 34A(6);

(b)

in the case of a further progress update, the notification of the initial progress update under paragraph (6).

relevant reporting period ” means—

(a)

in the case of an initial progress update, the period referred to in paragraph (1)(a);

(b)

in the case of a further progress update, the period referred to in paragraph (1)(b).F58]

PART 7 Compliance and Enforcement

CHAPTER 1 Monitoring compliance

Compliance notices

35. —(1) A compliance body may serve a notice on a responsible undertaking requesting such information as it considers necessary to enable it to monitor compliance with these Regulations (a “compliance notice”).

(2) A compliance notice must—

(a)be in writing,

(b)be served on the person to whom it is addressed,

(c)specify the date by which compliance with it is required.

(3) A compliance notice may be varied or revoked in writing at any time by the compliance body that issued it.

(4) Where a responsible undertaking

(a)fails to comply with a compliance notice, or

(b)in the opinion of the compliance body, supplies incomplete or inaccurate information,

the compliance body may instead determine the information requested.

(5) A determination under paragraph (4) must be made in writing and include information about appeals under Part 9 of these Regulations and, within 10 days of making the determination, be served on the responsible undertaking.

Inspection

36.—(1) A compliance body may inspect any premises, and any thing in or on those premises, in order to monitor compliance with these Regulations.

(2) Reasonable prior notice must be given before exercising the power in paragraph (1).

(3) A compliance body may authorise in writing such persons (“authorised persons”) who appear suitable to exercise the compliance body's powers of inspection under this regulation.

(4) An authorised person must, when inspecting premises, produce a copy of the written authorisation referred to in paragraph (3) on request.

(5) A person in control of the premises to which the compliance body or authorised person requires access—

(a)must allow the authorised person to have access to those premises, and

(b)where the premises are an offshore installation, must afford the compliance body or authorised person such facilities and assistance, including the provision of transport, accommodation and other subsistence, as necessary and reasonably practicable.

(6) A compliance body or an authorised person may, when inspecting premises

(a)require the production of any record,

(b)take measurements, photographs, recordings or copies of any thing,

(c)require any person at the premises to provide facilities and assistance to the extent that is within that person's control.

Other information

37.—(1) A responsible undertaking must notify the scheme administrator if it becomes aware that it is in breach of any requirement of these Regulations.

(2) A compliance body may take into account any information—

(a)provided to it in accordance with paragraph (1), or

(b)held by it, or provided to it, by virtue of any other provision in these Regulations or any other legislative provision,

in determining whether a responsible undertaking has complied with these Regulations.

CHAPTER 2 Enforcement

Enforcement notices

38. —(1) In any case where the relevant compliance body reasonably believes that a responsible undertaking has failed to comply with a requirement of these Regulations, that compliance body may serve a notice on that responsible undertaking in accordance with this regulation (an “enforcement notice”).

(2) An enforcement notice must—

(a)be in writing,

(b)be served on the person to whom it is addressed,

(c)specify—

(i)the provision of these Regulations which the compliance body believes has been breached,

(ii)the matters constituting the breach,

(iii)the steps that must be taken to remedy the breach,

(iv)the date by which those steps must be taken, and

(d)include information about appeals under Part 9.

(3) An enforcement notice may be varied or revoked in writing at any time by the compliance body that issued it.

PART 8 Civil penalties and breaches

CHAPTER 1 Civil penalties

Penalty notices

39. —(1) In any case where the relevant compliance body is satisfied that a responsible undertaking is liable to a civil penalty under this Part, it may serve a notice on that responsible undertaking (a “penalty notice”) imposing the penalties and other requirements set out in this Part.

(2) A penalty notice must—

(a)be in writing,

(b)be served on the person to whom it is addressed,

(c)specify—

(i)the breach of these Regulations in respect of which the penalty is imposed,

(ii)the steps that must be taken to remedy the breach,

(iii)the nature of the penalty, and

(d)include information about appeals under Part 9.

(3) A penalty notice imposing a financial penalty must specify—

(a)where no daily penalty applies or the total amount of the daily penalty can be determined at the date of service of the notice—

(i)the total amount due,

(ii)where applicable, how it has been calculated, and

(iii)to whom, and the date by which, it must be paid,

(b)where a daily penalty applies and the total amount of the daily penalty cannot be determined at the date of service of the notice—

(i)the amount of the initial penalty,

(ii)details of the applicable daily penalty, and

(iii)to whom the penalty must be paid.

(4) Where a notice has been served under paragraph (3)(b) and the total amount of the daily penalty can be determined after the date of service of the notice, the compliance body must serve a further notice on the responsible undertaking which complies with paragraph (3)(a).

(5) The daily penalty rate must be calculated by reference to working days.

(6) The compliance body must remit to the Secretary of State any financial penalty received.

Effect and recovery of financial penalty

40.—(1) Where—

(a)an initial penalty applies,

(b)the total amount of the daily penalty can be determined at the date of service of the notice,

the financial penalty is due 60 working days after notice of that penalty is given.

(2) If unpaid, a financial penalty is recoverable as a civil debt by the compliance body.

Effect of publication penalty

41. —(1) The “ publication penalty ” means publication on the scheme administrator's webpage, or another compliance body's website, of the following information in relation to a penalty notice

(a)the name of the responsible undertaking and, where different, of the participant,

(b)details of the breach of these Regulations in respect of which the penalty notice has been issued, and

(c)details of any financial penalty imposed.

(2) The information in paragraph (1) must be published for a minimum period of one year, and may be published for such longer period as the scheme administrator or the compliance body (as the case may be) determines.

(3) A publication penalty may not take effect until the period specified for any appeal against the penalty has expired.

Discretion in waiving, imposition and modification of civil penalties

42.—(1) Where the compliance body considers appropriate, it may—

(a)waive a civil penalty,

(b)allow additional time to pay any financial penalty,

(c)impose a lower financial penalty, or substitute a lower financial penalty where one has already been imposed, or

(d)modify the application of a publication penalty.

(2) Where, at any time before a financial penalty is due to be paid, the compliance body ceases to be satisfied that the responsible undertaking is liable for that penalty, it may serve a further notice on that undertaking

(a)withdrawing the penalty notice, or

(b)modifying the penalty notice.

CHAPTER 2 Breach of Regulations

Failure to notify

43.—(1) The penalties in paragraph (2) apply where a responsible undertaking fails to notify the scheme administrator of its compliance, contrary to regulation 29.

(2) The penalties are—

(a)the financial penalties of—

(i)an initial penalty of up to £5,000, and

(ii)a daily penalty of up to £500 for each working day the responsible undertaking remains in breach, starting on the day after the service of the penalty notice subject to a maximum of 80 working days, and

(b)the publication penalty.

Failure to maintain records

44.—(1) The penalties in paragraph (2) apply where a responsible undertaking fails to maintain records, contrary to regulation 28.

(2) The penalties are—

(a)the financial penalties of—

(i)an initial penalty of up to £5,000, and

(ii)a sum representing the cost to the compliance body of confirming the responsible undertaking has complied with the Scheme, and

(b)the publication penalty.

(3) The penalty notice may specify the steps the compliance body requires the responsible undertaking to take to remedy the breach.

Failure to undertake an energy audit

45.—(1) The penalties in paragraph (2) apply where a responsible undertaking fails to carry out an audit, contrary to Chapter 3 of Part 4, where the alternative routes to compliance in Part 6 do not apply.

(2) The penalties are—

(a)the financial penalties of—

(i)an initial penalty of £50,000, or such lesser amount as the compliance body may determine, and

(ii)a daily penalty of up to £500 for each working day the responsible undertaking remains in breach, starting on the day after the service of the compliance notice subject to a maximum of 80 working days, and

(b)the publication penalty.

(3) The penalty notice may specify the steps the compliance body requires the responsible undertaking to take, including conducting or completing an ESOS assessment, to remedy the breach, and the date by which such steps must be taken.

Failure to comply with notice

46.—(1) The penalties in paragraph (2) apply where a responsible undertaking fails to provide information, or to take steps, required by a compliance notice, an enforcement notice or a penalty notice.

(2) The penalties are—

(a)the financial penalties of—

(i)an initial penalty of up to £5,000, and

(ii)a daily penalty of up to £500 for each working day the responsible undertaking remains in breach, starting on the day after the service of the penalty notice subject to a maximum of 80 working days, and

(b)the publication penalty.

False or misleading statement

47.—(1) The penalties in paragraph (2) apply where a responsible undertaking makes a statement which is false or misleading when notifying information to the scheme administrator or a compliance body, or when providing information required by a compliance notice, an enforcement notice or a penalty notice.

(2) The penalties are—

(a)£50,000, or such lesser amount as the compliance body may determine, and

(b)the publication penalty.

PART 9 Appeals and service of documents

Appeals

48.—(1) A responsible undertaking served with a determination under regulation 35(5) or paragraph 13(2) of Schedule 2, or with an enforcement notice, or a penalty notice, may appeal to the relevant appeal body on the grounds that the determination, enforcement notice or penalty notice (as the case may be) was—

(a)based on an error of fact,

(b)wrong in law, or

(c)unreasonable.

(2) The relevant appeal body—

(a)in the case of an appeal against a determination made, or an enforcement notice or a penalty notice issued, by the scheme administrator, the Natural Resources Body for Wales, or [F59the Secretary of State for Energy Security and Net ZeroF59] , is the First-tier Tribunal,

(b)in the case of an appeal against determination made, or an enforcement notice or a penalty notice issued by the Scottish Environment Protection Agency, is the Scottish Ministers,

(c)in the case of an appeal against a determination made, or an enforcement notice or a penalty notice issued by the Chief Inspector, is the Planning Appeals Commission.

M21 (3) First-tier Tribunal ” has the meaning given in section 3 of the Tribunals, Courts and Enforcement Act 2007 .

M22 (4) Planning Appeals Commission ” has the meaning given in of Article 110(1) of the Planning (Northern Ireland) Order 1991 .

(5) Schedule 4 has effect in relation to the making of appeals to the Scottish Ministers and the Planning Appeals Commission.

Effect of an appeal

49. The bringing of an appeal suspends the determination, enforcement notice or penalty notice (as the case may be) being appealed taking effect pending determination of the appeal.

Determination of an appeal

50. An appeal body may—

(a)cancel the determination, enforcement notice or penalty notice (as the case may be),

(b)affirm the determination, enforcement notice or penalty notice (as the case may be), whether in its original form or with such modification as it sees fit,

(c)instruct the scheme administrator or the relevant compliance body to do, or not to do, any thing which is within the power of the scheme administrator or compliance body.

Service of documents

51. Any determination or notice required to be served on a responsible undertaking, may be served by—

(a)delivering or sending it to, or leaving it at—

(i)the responsible undertaking's registered office (where applicable),

(ii)the responsible undertaking's principal place of activity, or

(iii)another address in the United Kingdom specified by the responsible undertaking as its address for service, or

(b)sending it by electronic means to the email address provided by the responsible undertaking pursuant to paragraph 1(b) of Schedule 3.

PART 10 Application of these Regulations with modifications to relevant trust assets

Relevant trust assets

52.—(1) This Part applies where a relevant undertaking is—

(a)a dominant beneficiary,

(b)a trustee,

(c)an AIFM, or

(d)an operator

in relation to a relevant trust on the qualification date for a compliance period.

(2) A relevant trust exists where—

(a) one or more trustees hold one or more assets (“relevant trust assets”) on trust for the benefit of one or more beneficiaries, and

(b) one or more relevant undertakings, at least one of which is a relevant undertaking mentioned in paragraph (1), agrees with a person (“S”) that S will supply energy to the relevant trust asset, and the trust asset is supplied with energy further to that agreement.

(3) For the purposes of this Part—

(a) M23 AIFM ” has the meaning given in regulation 4 of the Alternative Investment Fund Managers Regulations 2013 ,

(b) dominant beneficiary ” means a beneficiary that is entitled to more than half of the assets of the relevant trust,

(c) M24 operator ” means a person with permission under Part 4A of the Financial Services and Markets Act 2000 to carry on a regulated activity, and

(d) M25 regulated activity ” has the meaning given in section 22 of the Financial Services and Markets Act 2000 .

Participants and responsible undertakings in relation to relevant trust assets

53.—(1) Subject to paragraph (5), where the dominant beneficiary enters into the agreement referred to in regulation 52(2)(b), the relevant trust asset is an asset held by the dominant beneficiary for the purposes of these Regulations.

(2) Where the AIFM or the operator enters into the agreement referred to in regulation 52(2)(b), the AIFM or the operator (as the case may be) is required to comply with the Scheme on its own behalf in relation to the energy consumption of the relevant trust asset.

(3) Where a trustee enters into the agreement referred to in regulation 52(2)(b) and there is an AIFM or an operator in relation to the relevant trust, the AIFM or the operator (as the case may be) is required to comply with the Scheme on its own behalf in relation to the energy consumption of the relevant trust asset.

(4) Subject to paragraph (5), where a trustee enters into the agreement referred to in regulation 52(2)(b) and there is no AIFM or operator in relation to the relevant trust, the trustee is required to comply with the Scheme on its own behalf in relation to the energy consumption of the relevant trust asset.

(5) Subject to paragraph (7) in any case where paragraph (1) or (4) apply, the dominant beneficiary or the trustee (as the case may be) may enter into an agreement with another undertaking (“U”) to the effect that U is required to comply with the Scheme on its own behalf in relation to the energy consumption of the relevant trust asset,

(6) In any case where two or more relevant undertakings mentioned in regulation 52(1) enter the agreement mentioned in regulation 52(2)(b), they must agree which of them is required to comply with the Scheme in relation to the energy consumption of the relevant trust asset.

(7) An agreement referred to in paragraph (5) or paragraph (6) must be made in writing between the responsible officers of the undertakings.

(8) In the circumstances set out in paragraphs (2), (3), (4) and (5) these Regulations apply with the modifications set out in Schedule 5.

Gregory Barker

Minister of State

Department of Energy and Climate Change

Regulation 15(2)

SCHEDULE 1 Relevant undertakings

Large undertakings, and small or medium undertakings

1. In these Regulations—

(a) a “ large undertaking ” means an undertaking which either—

(i)employs at least 250 persons, or

(ii)has an annual turnover in excess of [F60amount AF60] and an annual balance sheet total [F61in excessF61] of [F62amount BF62] , and

(b) a “ small or medium undertaking ” means an undertaking which employs fewer than 250 persons and either—

(i)has an annual turnover not exceeding [F60amount AF60] , or

(ii)has an annual balance sheet total not exceeding [F62amount BF62]

determined in accordance with this Schedule.

[F63 1A. In paragraph 1—

amount A ” means—

(a)

where the qualification date is before IP completion day, 50 million euro;

(b)

where the qualification date is on or after IP completion day , £44 million;

amount B ” means—

(a)

where the qualification date is before IP completion day, 43 million euro;

(b)

where the qualification date is on or after IP completion day, £38 million.F63]

Financial thresholds

2. The annual turnover, and the annual balance sheet total, of an undertaking must be determined as follows.

3. Any conversion into euro of the annual turnover or the annual balance sheet total for the purposes of paragraph 1, must be calculated on the basis of the currency conversion rate applicable on the qualification date for the compliance period.

[F64 3A. Paragraph 3 does not apply in respect of a qualification date on or after IP completion day.F64]

M26 4. In this Schedule “ turnover ” has the meaning given in section 474(1) of the Companies Act 2006 with the modification that for “company” there is substituted “ undertaking ” .

5. In relation to an undertaking the directors of which are required to prepare accounts under section 394 of the Companies Act 2006 (duty to prepare individual accounts)—

(a) the annual turnover and the annual balance sheet total for that undertaking are the annual turnover and annual balance sheet total recorded in those accounts for the financial year ending on, or in the 12 months immediately preceding, the qualification date, or

(b) where those accounts are not based on an accounting period of 12 months in accordance with sub-paragraph (a), a calculation of the annual turnover for a 12 month period, on a pro-rata basis.

6. In relation to an undertaking the directors of which are not required to prepare accounts under section 394 of the Companies Act 2006, and have prepared accounts which comply with section 395 of that Act (Individual Accounts: applicable accounting framework), the annual turnover and the annual balance sheet total for that undertaking are—

(a) the annual turnover and annual balance sheet total recorded in those accounts for the financial year ending on, or in the 12 months immediately preceding, the qualification date, or

(b) where those accounts are based on an accounting period of other than 12 months in accordance with sub-paragraph (a), a calculation of the annual turnover for a 12 month period, on a pro-rata basis.

7. In relation to an undertaking where individual accounts are not required under the Companies Act 2006, unless the undertaking is a relevant undertaking falling within regulation 15(1)(b), a responsible officer of the undertaking must estimate the annual turnover and annual balance sheet total for the undertaking for a 12 month period including the qualification date.

Employee threshold

8. The number of persons employed by an undertaking must be determined as follows.

9. For the purposes of this Schedule, a person is employed by an undertaking if they are—

(a) an employee of the undertaking,

(b) an owner manager of the undertaking,

(c) a partner in the undertaking.

10. The number of persons employed by an undertaking on the qualification date is the total of the number of persons employed by the undertaking in each of the months in the accounting period used to calculate the undertaking's annual turnover and balance sheet total, divided by the number of months in that period.

Change of status

11. Where, in any accounting period, an undertaking is a large undertaking (or a small or medium undertaking, as the case may be), it retains that status until it falls within the definition of a small or medium undertaking (or a large undertaking, as the case may be) for two consecutive accounting periods.

Regulation 17(1)(b)

SCHEDULE 2 Groups of undertakings

Aggregation

1. Subject to paragraphs 3 and 4, two or more highest parent groups may comply with the Scheme as one participant.

2. Where paragraph 1 applies, all the highest parents in those highest parent groups must agree in writing which of them is to be the responsible undertaking in relation to the participant's compliance with the Scheme and, in the absence of such agreement, each highest parent is the responsible undertaking in relation to the compliance of its highest parent group.

Disaggregation

3. Subject to paragraph 4, the relevant undertakings comprising a highest parent group may comply with the Scheme

(a)as individual participants,

(b)as two or more participants,

(c)by a combination of sub-paragraphs (a) and (b)

provided every undertaking comprising the highest parent group complies with the Scheme.

4. An undertaking may only comply with the Scheme other than as a member of the highest parent group where that is agreed in writing by the undertaking and the highest parent.

5. Where an undertaking complies as an individual participant in accordance with paragraph 3(a) or (c), it is the responsible undertaking in relation to its compliance with the Scheme.

6. Where two or more undertakings comply as one participant in accordance with paragraph 3(b) or 3(c), those undertakings must agree in writing which of them is to be the responsible undertaking in relation to their compliance with the Scheme, and in the absence of such agreement, each undertaking is responsible for its own compliance with the Scheme.

Change of group

7. Any undertaking which is a member of a highest parent group, or of a participant formed in accordance with paragraph 3(b) or (c), on the qualification date, and ceases to be part of that group or participant before the compliance date

(a)may agree in writing with the highest parent that it will comply with the Scheme as if it were still a member of that group or participant,

(b)may agree in writing with the highest parent of another highest parent group that it will comply with the Scheme as a member of that group, or

(c)in the absence of an agreement made in accordance with sub-paragraph (a) or (b), must comply with the Scheme on its own behalf.

[F65 7A. Any undertaking which is a member of a highest parent group, or of a participant formed in accordance with paragraph 3(b) or (c), on the compliance date, and ceases to be part of that group or participant before the last date by which an ESOS action plan is required to be notified under regulation 34A(6)—

(a) may agree in writing with the highest parent that it will comply with regulations 34A and 34B as if it were still a member of that group or participant,

(b) may agree in writing with the highest parent of another highest parent group that it will comply with regulations 34A and 34B as a member of that group, or

(c) in the absence of an agreement made in accordance with sub-paragraph (a) or (b), must—

(i) comply with regulations 34A and 34B on its own behalf, and

(ii) be the responsible undertaking in relation to its compliance with those regulations.

7B. Any undertaking which is a member of a highest parent group, or of a participant formed in accordance with paragraph 3(b) or (c), on the last date by which an ESOS action plan is required to be notified under regulation 34A(6), and ceases to be part of that group or participant before the last date by which an ESOS progress update is required to be notified under regulation 34B(6)—

(a) may agree in writing with the highest parent that it will comply with regulation 34B as if it were still a member of that group or participant,

(b) may agree in writing with the highest parent of another highest parent group that it will comply with regulation 34B as a member of that group, or

(c) in the absence of an agreement made in accordance with sub-paragraph (a) or (b),, must—

(i) comply with regulation 34B on its own behalf, and

(ii) be the responsible undertaking in relation to its compliance with that regulation.F65]

8. Where paragraph 7(a) or (b) applies, the undertaking must use the same reference period as the relevant participant.

9. Where paragraph 7(c) applies, the undertaking is the responsible undertaking in relation to its compliance with the Scheme.

Compliance of franchise undertakings as a group

10. Subject to paragraph 11, two or more franchise undertakings may comply with the Scheme as one participant.

11. Where paragraph 10 applies, those franchise undertakings must agree in writing that they will comply with the Scheme as one participant, and which of them is to be the responsible undertaking in relation to their compliance.

12. In these Regulations—

(a) a “franchise agreement” exists where one undertaking (“the franchisee”) and another undertaking (“the franchisor”) agree that—

(i) the franchisee carries on a business activity which is the sale or distribution of goods or the provision of services (the “franchise business”),

(ii) the franchise business is carried on under a name which the franchisor provides to the franchisee,

(iii) the premises where the franchise business is carried on are used exclusively for that business by the franchisee, and

(iv) those premises have an internal or external appearance agreed by the franchisor and that appearance is similar to that of other premises in respect of which the franchisor has entered into a franchise agreement,

F66 (b) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(c) a “ franchise undertaking ” means the franchisor, and any franchisee, that are party to a franchise agreement,

(d) a franchise agreement does not exist where the franchisee and the franchisor are group undertakings in relation to each other.

Determinations

13.—(1) A compliance body may determine whether or not a relevant undertaking is a member of a participant.

(2) A determination under sub-paragraph (1) must be made in writing and include information about appeals under Part 9 of these Regulations and, within 10 days of making the determination, be served on the relevant undertakings the compliance body considers are affected by it.

Regulations 10, 27A and 29

[F67Schedule 3 Information to be included in ESOS report, to be notified to scheme administrator and to be published by scheme administrator

Table A

Information in relation to responsible undertaking

Information in relation to responsible undertaking Column 1 - to be included in ESOS report under regulation 27A(4) Column 2 - to be notified to the scheme administrator under regulation 29 Column 3 - to be published by the scheme administrator under regulation 10
name yes yes yes
email address and telephone number no yes no
registered office (where applicable) no yes yes
principal place of activity, where the responsible undertaking has no registered office no yes yes
company registration number (where applicable) no yes yes
trading or other name by which the responsible undertaking is commonly known (where applicable) no yes yes
name, postal address, email address and telephone number of at least two individuals who will act as contacts for the responsible undertaking, one of whom is the responsible officer no yes no
where the responsible undertaking has a parent undertaking to which these Regulations do not extend (the “global parent”), the name of the global parent, and the trading or other name of the group of undertakings of which the global parent is the parent no yes yes
standard industrial classification code or other equivalent industrial classification of the responsible undertaking and (where different) of other relevant undertakings where complying as one participant no yes yes
reasons for classification of the responsible undertaking as a large undertaking, or small or medium undertaking as determined in accordance with Schedule 1 no yes yes

Table B

Information in relation to the participant where the responsible undertaking is one of two or more relevant undertakings complying with the Scheme as one participant

Information in relation to the participant Column 1 - to be included in ESOS report under regulation 27A(4) Column 2 - to be notified to the scheme administrator under regulation 29 Column 3 - to be published by the scheme administrator under regulation 10
the number of relevant undertakings comprising the participant yes yes yes
the names and companies house registration numbers (where applicable) of the relevant undertakings comprising the participant no yes >yes
where paragraph 1 of Schedule 2 applies, the fact that an agreement under paragraph 2 of Schedule 2 has been made, and the names of the relevant highest parents no yes yes
the name of any relevant undertaking that has ceased to be part of the participant since the qualification date by virtue of paragraph 3 or 7 of Schedule 2 no yes yes
corporate group structure chart or other information setting out the relationship between the relevant undertakings complying with the Scheme as one participant, including the responsible undertaking, any franchisees, any relevant undertaking that has ceased to be part of the participant since the qualification date by virtue of paragraph 3 or 7 of Schedule 2 and any parent undertaking of the responsible undertaking to which these Regulations do not extend yes yes yes

Table C

Information in relation to the responsible officer

Information in relation to the responsible officer Column 1 - to be included in ESOS report under regulation 27A(4) Column 2 - to be notified to the scheme administrator under regulation 29 Column 3 - to be published by the scheme administrator under regulation 10
name yes yes no
full title or position in the participant or relevant undertaking yes yes yes
contact details no yes no
date on which the responsible officer considered the recommendations of the audit in accordance with regulation 31(b) no yes yes

Table D

Information in relation to lead assessor where one is required under regulation 21

Information in relation to lead assessor Column 1 - to be included in ESOS report under regulation 27A(4) Column 2 - to be notified to the scheme administrator under regulation 29 Column 3 - to be published by the scheme administrator under regulation 10
name yes yes no
the approved register yes yes yes
whether the lead assessor is employed by the participant or by an undertaking which is a group undertaking in respect of the participant no yes yes

Table E

Information in relation to all other people who have carried out a significant proportion of site visits or data gathering for the energy audit, or drafted significant parts of the ESOS report

Information in relation to a specified person Column 1 - to be included in ESOS report under regulation 27A(4) Column 2 - to be notified to the scheme administrator under regulation 29 Column 3 - to be published by the scheme administrator under regulation 10
name of each natural person who has carried out a significant proportion of the site visits required by regulation 26(3A), gathered a significant amount of the data used for carrying out the energy audit, or drafted significant parts of the ESOS report (a “specified person”) yes, where recorded yes, where recorded no
whether the specified person is employed by the participant, or an undertaking which is a group undertaking in respect of the participant no yes, where recorded no

Table F

Information in relation to the ESOS assessment

Information in relation to the ESOS assessment Column 1 - intentionally left blank Column 2 - to be notified to the scheme administrator under regulation 29 Column 3 - to be published by the scheme administrator under regulation 10
whether, and if so to what extent, the participant has relied on Part 6 in complying with the Scheme - yes yes
details of estimates produced in accordance with Part 4 and required to be notified under regulation 21A - yes yes
details of site visits required to be recorded under regulation 26(9)(e) and (f). - yes yes
where applicable, that the energy audit does not include an analysis based on energy consumption profiles (as defined in accordance with regulation 27(3)) - yes no
where applicable, information relating to non-disclosure of information to a group undertaking as specified in regulation 27C(3)(b) - yes no
where applicable, details of the extent to which and the reasons why 12 months’ verifiable data was not used as required to be recorded under regulation 26(9)(g) - yes no

Table G

Information related to the participant’s energy consumption

Information related to the participant’s energy consumption Column 1 - intentionally left blank Column 2 - to be notified to the scheme administrator under regulation 29 Column 3 - to be published by the scheme administrator under regulation 10
the participant’s total energy consumption in kWh calculated in accordance with Chapter 2 of Part 4 - yes yes
the amount of the participant’s total energy consumption that is attributable to each organisational purpose as calculated in accordance with regulation 25B(1)(b) - yes no
where applicable, the participant’s significant energy consumption in kWh - yes yes
where applicable, the amount of the participant’s significant energy consumption in kWh that is attributable to each organisational purpose as calculated in accordance with regulation 25B(1)(a) - yes no
where applicable, the percentage of the participant’s total energy consumption that is accounted for by the participant’s areas of significant energy consumption - yes yes
the energy intensity ratios calculated in accordance with regulation 25C - yes yes

Table H

Information related to energy saving opportunities identified through an energy audit in accordance with regulation 26

Information related to energy saving opportunities Column 1 - intentionally left blank Column 2 - to be notified to the scheme administrator under regulation 29 Column 3 - to be published by the scheme administrator under regulation 10
the sum of all the estimates made in accordance with regulation 27(1)(d)(vi) (annual reductions in energy spend and energy consumption). - yes yes
for each organisational purpose, the sum of the estimates made in accordance with regulation 27(1)(d)(vi) in respect of any energy saving opportunities that are identified in accordance with regulation 27(1)(d)(i) as most closely relating to that organisational purpose - yes no
for each energy saving category, the sum of the estimates made in accordance with regulation 27(1)(d)(vi) in respect of any energy saving opportunities that are identified in accordance with regulation 27(1)(d)(ii) as most closely relating to that energy saving category - yes no
the estimate of energy savings achieved, as produced in accordance with 27B(1) - yes yes
the estimates of the proportion of the energy savings that relate to each organisational purpose, in accordance with 27B(2)(a) - yes no

Table I

Information relating to compliance with the Scheme under regulations 33 or 34 (alternative routes to compliance)

Information Column 1 - intentionally left blank Column 2 - to be notified to the scheme administrator under regulation 29(ab) Column 3 - to be published by the scheme administrator under regulation 10
where compliance is by virtue of regulation 33 (ISO 50001 certification), the details specified in regulation 27A(7)(a) and (c) - yes yes
where compliance is by virtue of regulation 34 (Display Energy Certificates and Green Deal Assessment), the details specified in regulation 27A(7)(b) and (c) - yes yes
the estimate of energy savings achieved, as produced in accordance with regulation 27B(1) - yes yes
the estimates of the proportion of the energy savings that relate to each organisational purpose, as produced in accordance with 27B(2)(a) - yes no
for each organisational purpose the sum of the estimates made in accordance with regulation 27A(7)(e)(ii) in respect of any energy saving measures that are identified in accordance with regulation 27A(7)(e)(i) as most closely relating to that organisational purpose - yes no
the sum of the estimates made in accordance with regulation 27A(7)(e)(ii) in respect of all the energy saving measures identified in accordance with regulation 27A(7)(d) - yes yes
for each energy saving category, the sum of the estimates made in accordance with regulation 27A(7)(e)(ii) in respect of any energy saving measures that are identified in accordance with regulation 27A(7)(e)(i) as most closely relating to that energy saving category - yes noF67]

Regulation 48(5)

SCHEDULE 4 Appeals procedure

PART 1 Procedure for appeals against determinations made, and enforcement and penalty notices issued, by the Scottish Environment Protection Agency

1. This Part applies to appeals against determinations made, and enforcement and penalty notices issued, by the Scottish Environment Protection Agency.

2. The Scottish Ministers must appoint an independent person to hear appeals on behalf of the appeal body.

3. A person who wishes to appeal to the Scottish Ministers under regulation 48(1) must give them written notice of the appeal together with a statement of the grounds of appeal.

4. The Scottish Ministers must as soon as is reasonably practicable send a copy of that notice and statement to the Scottish Environment Protection Agency.

5. An appellant may withdraw an appeal by notifying the Scottish Ministers who must, as soon as is reasonably practicable, notify the Scottish Environment Protection Agency accordingly.

6. Notice of appeal in accordance with paragraph 3 is to be given before the expiry of the period of 28 [F68daysF68] (or where that period expires on a day other than a working day, by no later than the next working day) after the date of the determination, or the date of service of the enforcement notice or penalty notice (as the case may be).

7. The standard of proof to be applied by the Scottish Ministers in determining an appeal is proof on the balance on probabilities.

PART 2 Procedure for appeals against determinations made, and enforcement and penalty notices issued, by the Chief Inspector

8. This Part applies to appeals against determinations made, and enforcement and penalty notices issued, by the Chief Inspector.

9. A person who wishes to appeal to the Planning Appeals Commission under regulation 48(1) must give them written notice of the appeal together with a statement of the grounds of appeal.

10. The Planning Appeals Commission must as soon as is reasonably practicable send a copy of that notice and statement to the Chief Inspector.

11. An appellant may withdraw an appeal by notifying the Planning Appeals Commission who must, as soon as is reasonably practicable, notify the Chief Inspector accordingly.

F6912. Notice of appeal in accordance with paragraph 9 is to be given before the expiry of the period of 28 ...days (or where that period expires on a day other than a working day, by no later than the next working day) after the date of the determination, or the date of service of the enforcement notice or penalty notice (as the case may be).

M2713. The [F70Planning Appeals CommissionF70] must determine the appeal and paragraphs (1) and (3) of Article 111 of the Planning (Northern Ireland) Order 1991 apply in relation to the determination of the appeal as they apply in relation to the determination of an appeal under that Order.

14. The Planning Appeals Commission must determine the process for determining appeals taking into account any requests of the appellant or the Chief Inspector.

15. An appeal under this Part must be accompanied by a fee and Article 127(2)(b) of the Planning (Northern Ireland) Order 1991 has effect as if the reference to an appeal under that Order included a reference to an appeal under these Regulations.

16. The standard of proof to be applied by the Planning Appeals Commission in determining an appeal is proof on the balance on probabilities.

Regulation 53(8)

SCHEDULE 5 Modification of the application of these Regulations in relation to certain relevant trust assets

1.—(1) Part 3 applies with the following modifications.

(2) Regulations 17, 18, and 19, and Schedule 2, do not apply, and instead the “participant” and the “ responsible undertaking ” in relation to relevant trust assets—

(a) mean the undertaking which is required to comply with the Scheme in relation to those relevant trust assets, determined in accordance with regulation 53(2), (3), (4), (5) or (6),

(b) where they are the participant and the responsible undertaking in relation to the relevant trust assets of two or more relevant trusts, must comply with the Scheme as a separate participant and responsible undertaking in relation to each relevant trust,

(c) where they are also a participant or a responsible undertaking by virtue of regulations 17, 18 and 19, must comply with the Scheme as a separate participant or responsible undertaking (as the case may be) in accordance with those regulations.

2.—(1) Part 4 applies with the following modifications.

(2) In regulation 21(1)(b) for “participant” there is substituted “ relevant trust asset ” .

[F71 (2A) In regulation 21(3) for “participant” there is substituted “relevant trust asset” . F71]

(3) Regulation 22(1) to (3) does not apply and instead the responsible undertaking must, unless regulation 33(3) applies—

(a) subject to sub-paragraph (4), calculate the total energy consumption of all relevant trust assets held in the relevant trust on the qualification date for that compliance period, and

(b) base that calculation on the energy consumption of the relevant trust assets during the reference period.

(4) The responsible undertaking may elect to exclude from the calculation referred to in sub-paragraph (3) any relevant trust asset which is no longer held in the relevant trust on the compliance date.

(5) Regulation 23(1) and (2) does not apply and instead—

(a) the “energy consumption” of a relevant trust asset means energy that is supplied to, and consumed by, the relevant trust asset, but excluding any energy which is supplied from the relevant trust asset to another person,

(b) for the purposes of paragraph (a)—

(i) energy is supplied to a relevant trust asset when it is supplied pursuant to the agreement referred to in regulation 52(2)(b), or the relevant trust asset supplies energy, other than surplus heat, to itself,

(ii) energy is supplied from a relevant trust asset to another person (“R”) where the relevant undertaking that entered the agreement referred to in regulation 52(2)(b) agrees with R that it will supply energy to R, and R is supplied with energy further to that agreement,

and the amount of the supply is measured.

(6) In regulation 23(4) and (6)(a) for “participant”, wherever it appears, there is substituted “ relevant trust asset ” .

(7) In regulation 24—

(a) paragraph (1) does not apply,

(b) in paragraph (3) for “the energy consumption of a participant” there is substituted “ the energy consumption of relevant trust assets ” .

(8) Regulation 25 does not apply and instead—

(a) after calculating the total energy consumption of the relevant trust assets, the responsible undertaking may elect to identify the relevant trust assets' areas of significant energy consumption for the purposes of Chapter 3 of Part 4, and

(b) the “areas of significant energy consumption” of relevant trust assets means those relevant trust assets held by the relevant trust which together account for not less than [F72 95% F72] of the total energy consumption

(i) measured in energy measurement units, or

(ii) measured by energy spend.

[F73 (8A) Regulation 25A applies with the modifications that any reference to the energy consumption, the total energy consumption, or the areas of significant energy consumption, of a participant is to be read as if it were a reference to the energy consumption, the total energy consumption, or the areas of significant energy consumption (as the case may be) of the relevant trust asset.

(8B) Regulation 25B applies with the modifications that any reference to the energy consumption, the total energy consumption, or the areas of significant energy consumption, of a participant is to be read as if it were a reference to the energy consumption, the total energy consumption, or the areas of significant energy consumption (as the case may be) of the relevant trust asset.

(8C) Regulation 25C applies with the modifications that any reference to the areas of significant energy consumption, or the total energy consumption, of a participant is to be read as if it were a reference to the areas of significant energy consumption or the total energy consumption (as the case may be) of the relevant trust asset.F73]

(9) Regulation 26 applies with the modifications that any reference to the energy consumption, or the total energy consumption, of a participant is to be read as if it were a reference to the energy consumption or, the total energy consumption (as the case may be) of the relevant trust assets.

(10) Regulation 27 applies with the modifications that—

(a) in paragraph (1)(a) for the words “participant's energy consumption and energy efficiency” there is substituted “ energy consumption and energy efficiency of the relevant trust assets ” ,

(b) for paragraph (1)(b) there is substituted “ identify any way in which the relevant undertaking that entered the agreement referred to in regulation 52(2)(b) can improve the energy efficiency of the relevant trust asset, ”,

(c) in paragraph (1)(c) for “the participant” there is substituted “ that relevant undertaking ” ,

[F74 (ca) in paragraph (1)(d)(iii)(aa) for “used by the participant” there is substituted “used by or that constitutes the relevant trust asset” F74] ,

(d) in paragraph (3)(a) for the words “by activities carried on, and assets held, by the participant” there is substituted “ by the relevant trust asset ” .

[F75 (10A) Regulation 27A applies with the modifications that any reference to the total energy consumption or significant energy consumption of the participant is to be read as if it were a reference to the total energy consumption or significant energy consumption (as the case may be) of the relevant trust asset.

(10B) Regulation 27B applies with the modifications that any reference to the energy savings, or the estimated energy savings of the participant is to be read as if it were a reference to the energy savings, or the estimated energy savings (as the case may be) of the relevant trust asset.

(10C) Regulation 27C applies with the modifications that any reference to the energy consumption of the participant is to be read as if it were a reference to the energy consumption of the relevant trust asset.F75]

(11) In regulation 28 for paragraph (1)(c) there is substituted “ any agreement made under regulation 53(5) or (6), ” .

3.—(1) Part 6 applies with the following modifications.

(2) In regulation 32 for “an undertaking” there is substituted “ a relevant trust asset ” .

(3) In regulation 33—

(a) in paragraph (1) for the words “a participant's energy management system” there is substituted “ an energy management system in relation to the relevant trust asset ” ,

(b) in paragraph (2) for the words “its energy consumption” there is substituted “ the energy consumption of the relevant trust asset ” ,

(c) in paragraph (3) for “a participant” there is substituted “ a relevant trust asset ” .

(4) In regulation 34—

(a) in paragraph (1) for the words “occupied by a relevant undertaking” there is substituted “ which is a relevant trust asset ” ,

(b) in paragraph (2) for “relevant undertaking” there is substituted “ participant ” , and for “its” there is substituted “ the ” ,

(c) in paragraph (3) for “of a participant” there is substituted “ of a relevant trust asset ” .

[F76 4.—(1) Part 6 applies with the following modifications—

(a) regulation 34A applies with the modification that any reference to “participant” should be read as a reference to relevant trust asset;

(b) regulation 34B applies with the modification that any reference to “participant” should be read as a reference to relevant trust asset.

5.—(1) Schedule 3 applies with the following modifications—

(a) in Table F for “the participant” there is substituted “the relevant trust asset” ;

(b) Table G applies with the modification that any reference to the participant is to be read as a reference to the relevant trust asset.F76]

Status: There are currently no known outstanding effects for the The Energy Savings Opportunity Scheme Regulations 2014.
The Energy Savings Opportunity Scheme Regulations 2014 (2014/1643)
Version from: 24 February 2025

Displaying information

Status of this instrument

in force Provision is in force
in force* In force only for specified purposes (see footnote)
not in force Not in force in England (may be in force in other geographies, see footnotes)
defined term Defined term
dfn Defined term (alternative style)
footnote commentary transitional and savings in force status related provisions geo extent insert/omit source count in force adj
F1 Words in reg. 2(1) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 3 inserted
F2 Reg. 4(4) substituted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 4 substituted
F3 Words in reg. 6(1)(e) substituted (3.5.2023) by The Secretaries of State for Energy Security and Net Zero, for Science, Innovation and Technology, for Business and Trade, and for Culture, Media and Sport and the Transfer of Functions (National Security and Investment Act 2021 etc) Order 2023 (S.I. 2023/424), art. 1(2), Sch. para. 57(a) (with art. 17) this amendment (text substituted) should be read in conjunction with other related provisions, see the commentary. substituted
F4 Words in reg. 8(1) substituted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 5 substituted
F5 Reg. 10 renumbered as reg. 10(1) (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 6(a) renumbered
F6 Words in reg. 10(1) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 6(b)(i) inserted
F7 Words in reg. 10(1)(a) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 6(b)(ii) inserted
F8 Words in reg. 10(1)(b) omitted (29.11.2023) by virtue of The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 6(b)(iii) omitted
F9 Reg. 10(1)(c)-(e) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 6(b)(iv) inserted
F10 Reg. 10(2) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 6(c) inserted
F11 Reg. 16(2)(b)(c) substituted for reg. 16(2)(b) (24.2.2025) by The Procurement Act 2023 (Consequential and Other Amendments) Regulations 2025 (S.I. 2025/163), regs. 1(2), 18(2) substituted
F12 Words in reg. 17(1)(b) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 7(a) inserted
F13 Words in reg. 17(2) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 7(b) inserted
F14 Words in reg. 19(4) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 8(a) inserted
F15 Words in reg. 19(6) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 8(b) inserted
F16 Reg. 21(3) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 9 inserted
F17 Reg. 21A inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 10 inserted
F18 Words in reg. 22(1) omitted (29.11.2023) by virtue of The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 11 omitted
F19 Word in reg. 23(7)(a) omitted (29.11.2023) by virtue of The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 12(a) omitted
F20 Reg. 23(7)(b) omitted (29.11.2023) by virtue of The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 12(b) omitted
F21 Words in reg. 25(1) substituted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 13(a) substituted
F22 Word in reg. 25(2) substituted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 13(b) substituted
F23 Reg. 25(3)(4) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 13(c) inserted
F24 Reg. 25A inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 14 inserted
F25 Pt. 4 Ch. 2A inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 15 inserted
F26 Reg. 26(3A) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 16(1)(a) inserted
F27 Reg. 26(8) omitted (29.11.2023) by virtue of The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 16(1)(b) omitted
F28 Reg. 26(9) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 16(1)(c) inserted
F29 Word in reg. 27(1)(c) omitted (29.11.2023) by virtue of The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 17(1)(a) omitted
F30 Reg. 27(1)(d) substituted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 17(1)(b) substituted
F31 Reg. 27(1)(e) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 17(1)(c) inserted
F32 Reg. 27(7) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 17(2) inserted
F33 Pt. 4 Ch. 3A inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 18 inserted
F34 Words in reg. 28(1)(c) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 19(1)(a) inserted
F35 Word in reg. 28(1)(d) omitted (29.11.2023) by virtue of The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 19(1)(b) omitted
F36 Words in reg. 28(1)(e) substituted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 19(1)(c) substituted
F37 Reg. 28(1)(f)-(i) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 19(1)(d) inserted
F38 Reg. 28(2) substituted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 19(2) substituted
F39 Pt. 5 heading substituted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 20 substituted
F40 Reg. 29 renumbered as reg. 29(1) (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 21(a) renumbered
F41 Reg. 29(1)(a)-(ac) substituted for reg. 29(1)(a) (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 21(b) substituted
F42 Reg. 29(2) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 21(c) inserted
F43 Reg. 30(3A) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 22 inserted
F44 Words in reg. 31(a)(ii) substituted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 23(a) substituted
F45 Reg. 31(a)(iii) substituted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 23(b) substituted
F46 Words in reg. 33(1) substituted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 24(a) substituted
F47 Words in reg. 33(3) substituted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 24(b) substituted
F48 Words in reg. 33(4)(a)(ii) inserted (31.12.2020) by The Energy Savings Opportunity Scheme (Amendment) (EU Exit) Regulations 2018 (S.I. 2018/1342), regs. 1(3), 3(2)(a)(i); 2020 c. 1, Sch. 5 para. 1(1) inserted
F49 Reg. 33(4)(a)(iii) inserted (31.12.2020) by The Energy Savings Opportunity Scheme (Amendment) (EU Exit) Regulations 2018 (S.I. 2018/1342), regs. 1(3), 3(2)(a)(ii); 2020 c. 1, Sch. 5 para. 1(1) inserted
F50 Words in reg. 33(4)(c) inserted (3.1.2019) by The Energy Savings Opportunity Scheme (Amendment) (EU Exit) Regulations 2018 (S.I. 2018/1342), regs. 1(2), 2(2) inserted
F51 Word in reg. 33(4)(c) omitted (29.11.2023) by virtue of The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 24(c) omitted
F52 Words in reg. 33(4)(d) inserted (31.12.2020) by The Energy Savings Opportunity Scheme (Amendment) (EU Exit) Regulations 2018 (S.I. 2018/1342), regs. 1(3), 3(2)(b)(i); 2020 c. 1, Sch. 5 para. 1(1) inserted
F53 Words in reg. 33(4)(d) inserted (31.12.2020) by The Energy Savings Opportunity Scheme (Amendment) (EU Exit) Regulations 2018 (S.I. 2018/1342), regs. 1(3), 3(2)(b)(ii); 2020 c. 1, Sch. 5 para. 1(1) inserted
F54 Reg. 33(4)(e) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 24(d) inserted
F55 Words in reg. 34(1)(a) substituted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 25(a)(i) substituted
F56 Words in reg. 34(1)(b) substituted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 25(a)(ii) substituted
F57 Reg. 34(4)(c) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 25(b) inserted
F58 Pt. 6A inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 26 inserted
F59 Words in reg. 48(2)(a) substituted (3.5.2023) by The Secretaries of State for Energy Security and Net Zero, for Science, Innovation and Technology, for Business and Trade, and for Culture, Media and Sport and the Transfer of Functions (National Security and Investment Act 2021 etc) Order 2023 (S.I. 2023/424), art. 1(2), Sch. para. 57(b) (with art. 17) this amendment (text substituted) should be read in conjunction with other related provisions, see the commentary. substituted
F60 Words in Sch. 1 para. 1 substituted (31.12.2020) by The Energy Savings Opportunity Scheme (Amendment) (EU Exit) Regulations 2018 (S.I. 2018/1342), regs. 1(3), 3(3)(a)(i); 2020 c. 1, Sch. 5 para. 1(1) substituted
F61 Words in Sch. 1 para. 1(a)(ii) inserted (26.10.2015) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2015 (S.I. 2015/1731), regs. 1, 2(2) inserted
F62 Words in Sch. 1 para. 1 substituted (31.12.2020) by The Energy Savings Opportunity Scheme (Amendment) (EU Exit) Regulations 2018 (S.I. 2018/1342), regs. 1(3), 3(3)(a)(ii); 2020 c. 1, Sch. 5 para. 1(1) substituted
F63 Sch. 1 para. 1A inserted (31.12.2020) by The Energy Savings Opportunity Scheme (Amendment) (EU Exit) Regulations 2018 (S.I. 2018/1342), regs. 1(3), 3(3)(b); 2020 c. 1, Sch. 5 para. 1(1) (as amended by S.I. 2020/711, regs.1(2), 4(2)(a)) inserted
F64 Sch. 1 para. 3A inserted (31.12.2020) by The Energy Savings Opportunity Scheme (Amendment) (EU Exit) Regulations 2018 (S.I. 2018/1342), regs. 1(3), 3(3)(c) (as substituted by S.I. 2020/711, regs. 1(2), 4(2)(b)) inserted, substituted
F65 Sch. 2 paras. 7A, 7B inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 27 inserted
F65 Sch. 2 paras. 7A, 7B inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 27 inserted
F66 Sch. 2 para. 12(b) omitted (26.10.2015) by virtue of The Energy Savings Opportunity Scheme (Amendment) Regulations 2015 (S.I. 2015/1731), regs. 1, 2(3) omitted
F67 Sch. 3 substituted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 28 substituted
F68 Word in Sch. 4 para. 6 inserted (26.10.2015) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2015 (S.I. 2015/1731), regs. 1, 2(4)(a) inserted
F69 Word in Sch. 4 para. 12 omitted (26.10.2015) by virtue of The Energy Savings Opportunity Scheme (Amendment) Regulations 2015 (S.I. 2015/1731), regs. 1, 2(4)(b) omitted
F70 Words in Sch. 4 para. 13 substituted (26.10.2015) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2015 (S.I. 2015/1731), regs. 1, 2(4)(c) substituted
F71 Sch. 5 para. 2(2A) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 29(2) inserted
F72 Word in Sch. 5 para. 2(8)(b) substituted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 29(3) substituted
F73 Sch. 5 para. 2(8A)-(8C) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 29(4) inserted
F74 Sch. 5 para. 2(10)(ca) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 29(5) inserted
F75 Sch. 5 para. 2(10A)-(10C) inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 29(6) inserted
F76 Sch. 5 paras. 4, 5 inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 29(7) inserted
F76 Sch. 5 paras. 4, 5 inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 29(7) inserted
M1 S.I. 2010/761.
M2 1972 c. 68. Section 2(2) is amended by section 27(1)(a) of the Legislative and Regulatory Reform Act 2006 (c. 51) and by paragraph 1 of Schedule 1(1) to the European Union (Amendment) Act 2008 (c. 7).
M3 OJ No L 315, 14.11.2012, p1, to which there is an amendment not relevant to these Regulations. Article 8(4) to (6) is transposed by these Regulations.
M4 1996 c. 18.
M5 1996 No. 1919 (N.I. 16).
M6 2006 c. 46.
M7 2008 c. 32.
M8 1964 c. 29, amended by paragraph 1 of Schedule 3 to the Oil and Gas (Enterprise) Act 1982 (c. 23), and by section 103 of the Energy Act 2011 (c. 16).
M9 1971 c. 80.
M10 S.R. (NI) 2013 No 160.
M11 PAS 51215:2014 “Energy efficiency assessment – Competence of a lead energy assessor - Specification” published in 2014 by the British Standards Institution (ISBN 978 0 580 84377 8).
M12 2000 c. 17. Paragraph 120(9) defines certain terms used in paragraph 120(7); both are amended by paragraph 33 of Part 1 of Schedule 1 to S.I. 2003/2096.
M13 1994 c. 22.
M14 1993 c. 43, to which there are amendments not relevant to these Regulations.
M15 2006 c. 46.
M16 ISO 50001:2011 “Energy management systems – Requirements with guidance for use” published in 2011 by the International Organization for Standardization (ISBN 978-92-67-10552-9).
M17 OJ No L 218 13.8.2008, p30.
M18 S.I. 2012/3118; relevant amending instruments are S.I.s 2013/181 and 2014/880.
M19 S.R. (NI) 2008 No 170, amended by S.R. (NI) 2013 No 12. There are other amendments not relevant to these Regulations.
M20 S.I. 2012/2079.
M21 2007 c. 15. Such appeals are assigned to the General Regulatory Chamber of the First-tier Tribunal by virtue of article 3(a) of the First-tier Tribunal and Upper Tribunal (Chamber) Order 2010 (S.I. 2010/2655).
M22 S.I. 1991/1220 (N.I. 11), to which there are amendments not relevant to these Regulations.
M23 S.I. 2013/1773, to which there are amendments not relevant to these Regulations.
M24 2000 c. 8. Part 4A is substituted by section 11(2) of the Financial Services Act 2012 (c. 21).
M25 Section 22 is amended by section 7(1) of the Financial Services Act 2012.
M26 2006 c. 46, to which there are amendments not relevant to these Regulations.
M27 Article 111(1) is amended by S.I. 2006/1252 (N.I. 7) articles 1(3)(b) and 15(2), and by S.R. 2006/222 article 2.
Defined Term Section/Article ID Scope of Application
50001:2011 Energy management systems – Requirements with guidance for use reg. 33. of PART 6 def_3899726f93
a further progress update reg. 34B. of Part 6A def_3e3d60e25f
activities carried on reg. 22. of CHAPTER 2 of PART 4 def_56bb6889e4
AIFM reg. 52. of PART 10 def_dfd82e38c8
aircraft reg. 24. of CHAPTER 2 of PART 4 def_91b81e9d25
amount A para 1A. of SCHEDULE 1 def_024c2c4986
amount B para 1A. of SCHEDULE 1 def_833e7ee14a
an energy saving measure reg. 27A. of Chapter 3A of PART 4 def_598b84b4e0
an initial progress update reg. 34B. of Part 6A def_65f85a2e4b
approval body reg. 12. of CHAPTER 3 of PART 2 def_e6a838722f
approval body reg. 2. of PART 1 def_92e54fc7d0
approved list reg. 12. of CHAPTER 3 of PART 2 def_38ed0ee65c
approved list reg. 2. of PART 1 def_8dbe362790
approved register reg. 12. of CHAPTER 3 of PART 2 def_4e08538cd5
approved register reg. 2. of PART 1 def_5f23a4e9b8
areas of significant energy consumption para SCHEDULE 5 def_508f43b56c
areas of significant energy consumption reg. 2. of PART 1 def_719c08856a
areas of significant energy consumption reg. 25. of CHAPTER 2 of PART 4 def_30b19a5a8e
areas of significant energy consumption reg. 25. of CHAPTER 2 of PART 4 def_b3d7d3a232
assets held reg. 22. of CHAPTER 2 of PART 4 def_8ae3a1444e
authorised persons reg. 36. of CHAPTER 1 of PART 7 def_c4fc468457
certified reg. 33. of PART 6 def_8133e20c4f
certified energy management system reg. 2. of PART 1 def_702bb999c8
certified energy management system reg. 33. of PART 6 def_cc5586a8aa
Chief Inspector reg. 2. of PART 1 def_1d68f61600
Chief Inspector reg. 6. of CHAPTER 2 of PART 2 def_2d05728b6d
competence requirements reg. 12. of CHAPTER 3 of PART 2 def_4dd38189de
compliance body reg. 2. of PART 1 def_85b4aee5e0
compliance body reg. 6. of CHAPTER 2 of PART 2 def_3e6b18c7c9
compliance date reg. 2. of PART 1 def_99afbcdbba
compliance date reg. 4. of CHAPTER 1 of PART 2 def_7cf775f5d0
compliance notice reg. 2. of PART 1 def_55978af8ec
compliance notice reg. 35. of CHAPTER 1 of PART 7 def_19b8e1ef8a
devolved Scottish authority reg. 16. of CHAPTER 1 of PART 3 def_7a60d44af8
director reg. 30. of PART 5 def_74c5284975
display energy certificate reg. 2. of PART 1 def_e55ec717dc
display energy certificate reg. 34. of PART 6 def_f09ee3206a
dominant beneficiary reg. 52. of PART 10 def_069c53b909
employee reg. 2. of PART 1 def_cb7ec65cb4
energy reg. 2. of PART 1 def_66a9361ed3
energy audit reg. 2. of PART 1 def_951f5c613b
energy consumed for the purposes of transport reg. 24. of CHAPTER 2 of PART 4 def_2746de6aaa
energy consumption para SCHEDULE 5 def_5599215ca2
energy consumption reg. 2. of PART 1 def_c64ea29e22
energy consumption reg. 23. of CHAPTER 2 of PART 4 def_64d3a56f9e
energy consumption profile reg. 27. of CHAPTER 3 of PART 4 def_8963bf8ea6
energy consumption profiles reg. 27. of CHAPTER 3 of PART 4 def_6a1631d09d
energy efficiency reg. 2. of PART 1 def_5e435e83d1
energy intensity ratio reg. 2. of PART 1 def_87ba6328f0
energy intensity ratio reg. 25C. of Chapter 2A of PART 4 def_84479040f6
energy management system reg. 33. of PART 6 def_a882bd237d
energy measurement unit reg. 2. of PART 1 def_c7c6d4d665
energy saving category reg. 2. of PART 1 def_995eab8a33
energy saving measure reg. 2. of PART 1 def_e3f8f98544
energy saving opportunity reg. 2. of PART 1 def_7ec13b2e30
energy spend reg. 23. of CHAPTER 2 of PART 4 def_3a0f83b617
enforcement notice reg. 2. of PART 1 def_bb79db2b15
ESOS action plan reg. 2. of PART 1 def_ee75fd399a
ESOS action plan reg. 34A. of Part 6A def_f3cdd96099
ESOS assessment reg. 2. of PART 1 def_654fb8e871
ESOS progress update reg. 2. of PART 1 def_b19243cc8b
ESOS report reg. 2. of PART 1 def_6feea50c4c
ESOS report reg. 27A. of Chapter 3A of PART 4 def_73e63a5e65
evidence pack reg. 2. of PART 1 def_78812b1147
evidence pack reg. 28. of CHAPTER 4 of PART 4 def_eb5fb41fc6
First-tier Tribunal reg. 48. of PART 9 def_f3b001a5ab
franchise business para 10. of SCHEDULE 2 def_27fc1100bc
franchise undertaking para 10. of SCHEDULE 2 def_e4c33bd7c0
functions reg. 7. of CHAPTER 2 of PART 2 def_8a585a418f
gas reg. 2. of PART 1 def_b4a6785458
group undertaking reg. 2. of PART 1 def_43120e5b73
highest parent reg. 17. of CHAPTER 1 of PART 3 def_6ae5b14bb9
highest parent reg. 2. of PART 1 def_3171cdc42b
highest parent group reg. 17. of CHAPTER 1 of PART 3 def_b3830b7d97
highest parent group reg. 2. of PART 1 def_15145b7041
initial compliance period reg. 2. of PART 1 def_b12b9360a4
initial compliance period reg. 4. of CHAPTER 1 of PART 2 def_35d6efb9e0
ISO 50001 reg. 33. of PART 6 def_8734c19e96
kWh reg. 2. of PART 1 def_470359d5cf
large undertaking para 1. of SCHEDULE 1 def_c72262a27a
lead assessor reg. 11. of CHAPTER 3 of PART 2 def_7cec0e2733
lead assessor reg. 2. of PART 1 def_9e0933684d
legislative provision reg. 2. of PART 1 def_e9742d5220
measured reg. 23. of CHAPTER 2 of PART 4 def_feebb09030
method of deemed compliance with Chapter 3 reg. 29. of PART 5 def_3ccdd196f6
method of deemed compliance with Chapter 3 reg. 34A. of Part 6A def_5a9d56575d
method of deemed compliance with Chapter 3 of Part 4 reg. 29. of PART 5 def_e6f0c520b5
method of deemed compliance with Chapter 3 of Part 4 reg. 34A. of Part 6A def_b3026f9e57
national accreditation body of a Member State reg. 33. of PART 6 def_21018f7e70
national accreditation body of a Member State reg. 33. of PART 6 def_fd35e101dc
Notification System reg. 2. of PART 1 def_3613bdbb65
Notification System reg. 8. of CHAPTER 2 of PART 2 def_5294e4bccc
offshore activity reg. 2. of PART 1 def_2785de2cdd
offshore area reg. 2. of PART 1 def_5efd9b6cc0
offshore installation reg. 2. of PART 1 def_c096c84c9e
offshore undertaking reg. 2. of PART 1 def_63a959cd3b
operator reg. 52. of PART 10 def_0912955c87
organisational purpose reg. 2. of PART 1 def_c9024cb9ab
parent undertaking reg. 2. of PART 1 def_b76bafa821
participant para SCHEDULE 5 def_f6023c4fc2
participant para SCHEDULE 5 def_7fdda2c9b0
participant para SCHEDULE 5 def_808c327504
participant reg. 17. of CHAPTER 1 of PART 3 def_c1776a33ac
participant reg. 2. of PART 1 def_50a6ab1f90
payback period reg. 27. of CHAPTER 3 of PART 4 def_501c2e21de
payback period reg. 27B. of Chapter 3A of PART 4 def_2e04ee685c
penalty notice reg. 2. of PART 1 def_3868cc07e5
penalty notice reg. 39. of CHAPTER 1 of PART 8 def_104f5f6abc
Planning Appeals Commission reg. 48. of PART 9 def_d3dd608bfe
premises reg. 2. of PART 1 def_aac6129351
professional body reg. 12. of CHAPTER 3 of PART 2 def_a0ba0747c8
public body reg. 16. of CHAPTER 1 of PART 3 def_02a8d6daad
publication penalty reg. 2. of PART 1 def_efdb14557c
publication penalty reg. 41. of CHAPTER 1 of PART 8 def_34817f21ae
qualification date reg. 2. of PART 1 def_a6023d8226
qualification date reg. 4. of CHAPTER 1 of PART 2 def_8b36bf80ed
qualifying Green Deal assessment reg. 2. of PART 1 def_51a40dc0e0
qualifying Green Deal assessment reg. 34. of PART 6 def_bb1c8e23d6
reference period reg. 2. of PART 1 def_2117d00b8c
reference period reg. 22. of CHAPTER 2 of PART 4 def_8125315b6b
regulated activity reg. 52. of PART 10 def_ce944c4c5e
relevant compliance period reg. 34A. of Part 6A def_8099bef45d
relevant compliance period reg. 34B. of Part 6A def_668ac2182f
relevant event reg. 34B. of Part 6A def_95ab62d2bb
relevant period reg. 33. of PART 6 def_c7e123491a
relevant period reg. 34. of PART 6 def_b35f845778
relevant reporting period reg. 34B. of Part 6A def_db9f861778
relevant trust assets reg. 52. of PART 10 def_4cf9f5b100
relevant undertaking reg. 15. of CHAPTER 1 of PART 3 def_a0ac6504a5
relevant undertaking reg. 2. of PART 1 def_3246a6e856
responsible officer reg. 2. of PART 1 def_c1ec5e9c07
responsible officer reg. 30. of PART 5 def_6a77e3004b
responsible undertaking para SCHEDULE 5 def_98c2ba5c18
responsible undertaking reg. 18. of CHAPTER 2 of PART 3 def_3854a0e866
responsible undertaking reg. 2. of PART 1 def_860744567a
road going vehicle reg. 24. of CHAPTER 2 of PART 4 def_518d35254a
scheme administrator reg. 2. of PART 1 def_41ed792cc1
scheme administrator reg. 5. of CHAPTER 2 of PART 2 def_fc3b7dfef8
significant energy consumption reg. 2. of PART 1 def_efc53432b8
significant energy consumption, reg. 25. of CHAPTER 2 of PART 4 def_e772c4b4ef
small or medium undertaking para 1. of SCHEDULE 1 def_dfa94e0989
standard industrial classification reg. 2. of PART 1 def_1064a57b83
subsequent compliance period reg. 2. of PART 1 def_5f2b58b6c4
subsequent compliance period reg. 4. of CHAPTER 1 of PART 2 def_26a8eb8104
subsidiary undertaking reg. 2. of PART 1 def_03f063f2ae
surplus heat reg. 23. of CHAPTER 2 of PART 4 def_ca2b321880
the Directive reg. 2. of PART 1 def_4eb01e22d0
the franchisee para 10. of SCHEDULE 2 def_68d3cd5141
the franchisor para 10. of SCHEDULE 2 def_f39b64a84b
the latest ESOS action plan reg. 34B. of Part 6A def_9d02be2dd8
the PAS reg. 12. of CHAPTER 3 of PART 2 def_e87022d87f
the PAS reg. 2. of PART 1 def_6d9adcb4af
the Scheme reg. 2. of PART 1 def_d677dc416d
train reg. 24. of CHAPTER 2 of PART 4 def_080a656113
turnover para 2. of SCHEDULE 1 def_d401f56d5e
undertaking reg. 2. of PART 1 def_7f3679fcdf
vessel reg. 24. of CHAPTER 2 of PART 4 def_937fea9e8f
working day reg. 2. of PART 1 def_87d3aba94d

Status of changes to instrument text