Statutory Instruments
2014 No. 1871
Highways, England
The Lincolnshire County Council (River Witham Bridge) Scheme 2013 Confirmation Instrument 2014
Made
8th July 2014
Coming into force in accordance with article 1
1. This Instrument may be cited as “The Lincolnshire County Council (River Witham Bridge) Scheme 2013 Confirmation Instrument 2014” and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.
2. The Lincolnshire County Council (River Witham Bridge) Scheme 2013 Confirmation Instrument 2014 (“the Scheme”) is hereby confirmed with modifications.
3. The Scheme as confirmed is set out in the Schedule hereto (including the plans) and copies of the Scheme with its accompanying plans as modified are deposited at the offices of the Department for Transport, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex, TN37 7GA and at the offices of Lincolnshire County Council, County Offices, Newland, Lincoln, LN1 1YL.
Signed by authority of the Secretary of State for Transport
M R Fawcett
A Senior Civil Servant in the
Department for Transport
8th July 2014
Regulation 3
THE SCHEDULE THE LINCOLNSHIRE COUNTY COUNCIL (RIVER WITHAM BRIDGE) SCHEME 2013
The Lincolnshire County Council (“the Council”) make this Scheme in exercise of their powers under Section 106(3) of the Highways Act 1980 and of all other powers enabling them in that behalf:-
2. This Scheme may be cited as The Lincolnshire County Council (River Witham Bridge) Scheme 2013.
Given under the Common Seal of the County Council of Lincolnshire on the 22nd day of July 2013
THE COMMON SEAL of the Council of the County of Lincolnshire was hereunto affixed in the presence of:-
Authorised Officer
Regulation 3
THE SCHEDULE TO THE SCHEME Plans and Specifications of the River Witham Bridge
The location and general design of the Bridge are shown on plan numbered B/1054738/1700/RW/D001 Rev.0.2 marked “The Lincolnshire County Council (River Witham Bridge) Scheme 2013”.
Points of Commencement and Termination
Commencing from a point to the north of the River Witham 140 metres north of the middle of the SUSTRANS cycle route (measured along the line of the proposed highway).
The bridge will pass over the North Delph the River Witham the South Delph, Soak Dyke/ Canwick Fen Drain.
Terminating on the south side of the River Witham at a point 85.2 meters south of the middle of the SUSTRANS cycle route (Measured along the line of the proposed highway).
Spans
A five span structure, from the north the individual square spans are 36.23 metres, 39.42 metres, 52.00 metres, 52.00 metres and 36.27 metres. The span over the River Witham is 52.00 metres. The overall span of the structure is 215.92 metres.
Headway and Waterway
The Headway shall not be less than 5.20 metres above normal water level of 2.90 metres Above Ordnance Datum. This Headway shall be maintained over 50 percent of the River Witham width at normal water level.
Overall Dimensions
The overall square Bridge width will vary from 15.800 metres excluding parapets at the south abutment end to 16.970 metres excluding parapets at the north abutment. The Bridge will carry a 7.3 metre wide carriageway, bordered on either side by hard strips of one metre in width. A 4.0 metre wide cycle / footway will be provided on the west side. On the east side, there will be a hardened verge that varies in width from 2.500 metres at the south abutment to 3.670 metres at the north abutment.