Statutory Instruments

2015 No. 1666

Infrastructure Planning

The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015

Made

9th September 2015

Coming into force

10th September 2015

An application has been made, under paragraph 2 of Schedule 6 to the Planning Act 2008( 1 ), to the Secretary of State in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011( 2 ) for a non-material change to the Hinkley Point C (Nuclear Generating Station) Order 2013( 3 ).

The Secretary of State, having considered the application, and having consulted in accordance with regulation 7(1) of the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011, has decided to make this Order amending the Hinkley Point C (Nuclear Generating Station) Order 2013.

The Secretary of State, in exercise of the powers conferred by paragraph 2 of Schedule 6 to the Planning Act 2008, makes the following Order:

Citation and commencement

1. This Order may be cited as the Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 and comes into force on 10th September 2015.

Amendment of the Hinkley Point C (Nuclear Generating Station) Order 2013

2.The Hinkley Point C (Nuclear Generating Station) Order 2013 (“the Order”) is amended as follows.

Amendment to Part 1 (Authorised development) of Schedule 1 (Authorised project)

3. —(1) The description of Work No. 1A in Part 1 (Authorised development) of Schedule 1 (Authorised project) to the Order is amended as follows.

(2) In paragraph (d)(i)—

(a) after “Effluent Tanks;” omit “and”; and

(b) at the end of the list, below “Emergency Diesel Generator Buildings;”, insert—

Battery Load Bank;

Cooling Water Discharge Weir (Buildings); and

Refuelling Water Storage Tank; .

(3) In paragraph (d)(ii)—

(a) after “Auxiliary Transformer;” insert “and”;

(b) for “Hydrazine and Ammonia Storage; and” substitute “Hydrazine Storage;”; and

(c) omit “Auxiliary Feedwater Storage;”.

(4) In paragraph (d)(iii)—

(a) after “Fire-Fighting Water Building;” insert “and”; and

(b) at the end of the list, below “Fire-Fighting Water Building; and”, insert “Discharge Shaft (Units 1 & 2);”.

(5) In paragraph (e)(i), at the end of the list, below “Emergency Diesel Generator Buildings;”, insert—

Battery Load Bank;

Cooling Water Discharge Weir (Buildings); and

Refuelling Water Storage Tank .

(6) In paragraph (e)(ii)—

(a) after “Unit Transformer;” insert “and”; and

(b) omit “Hydrazine and Ammonia Storage; and” and “Auxiliary Feedwater Storage;”.

(7) In paragraph (f)—

(a) omit “Attenuation Pond;”;

(b) after “Conventional Island Water Tanks;” omit “and”;

(c) after “Nuclear Island Water Tank;” insert “and”; and

(d) at the end of the list, below “Nuclear Island Water Tank;”, insert “Degassed Water Storage Tanks;”.

(8) In paragraph (h)—

(a) omit “Medical Centre;”;

(b) after “Contamination Tools Store” omit “(2 structures)”; and

(c) after “Vehicle search area building adjacent to the C182;” omit “and”;

(d) in the list, between “Vehicle search area building adjacent to the C182;” and “Service Access Buildings;”, insert “Emergency Response Store;”;

(e) after “Service Access Buildings;” insert “and”; and

(f) at the end of the list, below “Service Access Buildings; and”, insert “Services Ventilation Building;”.

Amendment to Part 3 (Approved plans) of Schedule 1 (Authorised project)

4. —(1)Part 3 (Approved plans) of Schedule 1 (Authorised project) to the Order is amended as follows.

(2) For the approved plans referred to in paragraph (3), substitute the approved plans as set out in the Schedule to this Order.

(3) The approved plans referred to in paragraph (2) are each of those listed between the following headings in Part 3 (Approved plans) of Schedule 1 (Authorised project) to the Order—

(a) HPC Permanent Development Site”; and

(b) HPC Accommodation Site”.

(4) The Schedule to this Order has effect.

Amendment to Schedule 2 (Requirements)

5. Schedule 2 (Requirements) to the Order is amended as follows—

(a) in paragraph (2) of requirement PW3 (Buildings and structures) for “(Rev 01)” substitute “(Rev 02)”;

(b) omit requirement MS18 (Auxillary Feedwater Storage Buildings);

(c) in paragraph (2) of requirement MS19 (Service Access Buildings) for “(Rev 01)” substitute “(Rev 02)”; and

(d) in paragraph (2) of requirement MS21 (Meteorological Station Mast) for “(Rev 01)” substitute “(Rev 02)”.

Certification of revised or substituted plans

6. —(1) The undertaker must, as soon as practicable after the making of this Order, submit copies of any revised or substituted plans to the Secretary of State for certification that they are true copies of the revised or substituted plans.

(2) A plan so certified by the Secretary of State is admissible in any proceedings as evidence of the contents of the document of which it is a copy.

(3) In paragraph (1), the “undertaker” has the same meaning as in article 2(1) of the Order.

Signed on behalf of the Secretary of State for Energy and Climate Change

Giles Scott

Head of National Infrastructure Consents and Coal Liabilities

Department for Energy and Climate Change

9th September 2015

Article 4

SCHEDULE Approved plans to be substituted into Part 3 (Approved plans) of Schedule 1 (Authorised project) to the Order

HPC Permanent Development Site
Site Plans
Drawing number Rev Drawing title Scale Paper size
HINK-A1-SL-00-GA-002 02 HPC Site Parameter Plan 1:1000 A0
HINK-A1-SL-00-GA-010 02 Site Layout Plan (Operational) 1:2500 A1
Nuclear Island (Unit 1)
Unit 1: Reactor Building / Fuel Building / Fuel Building Hall / Boron Storage / Safeguard Buildings / Nuclear Auxiliary Building / Access Tower / Service Access Building 2
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HR-01-GP-090 02 Roof Plan 1:200 A0
HINK-A2-HR-01-GE-001 02 South and West Elevations 1:200 A0
HINK-A2-HR-01-GE-002 02 North and East Elevations 1:200 A0
HINK-A2-HR-01-DT-001 01 Part Elevation Detail 1:50 A0
Radioactive Waste Storage / Radioactive Waste Process Building
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HQ-00-GA-001 01 Roof Plan and Elevations 1:200 A0
HINK-A2-HQ-00-DT-001 01 Part Elevation Detail 1:50 A0
Hot Laundry / Hot workshop / Hot warehouse / Facilities for Decontamination / Effluent Tanks / Refuelling Water Storage Tank / Battery Load Bank
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HV-00-GP-020 02 Roof Plan 1:200 A1
HINK-A2-HV-00-GE-001 02 Elevations 1:200 A1
HINK-A2-HV-00-DT-001 02 Part Elevation Detail 1:50 A1
Emergency Diesel Generator – A / Cooling Water Discharge Weir (Building)
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HD-01-GP-040 02 Roof Plan 1:200 A1
HINK-A2-HD-01-GE-001 02 Elevations 1:200 A1
HINK-A2-HD-01-DT-001 02 Part Elevation Detail 1:50 A1
Emergency Diesel Generator – B / Cooling Water Discharge Weir (Building) / Battery Load Bank
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HD-02-GP-040 02 Roof Plan 1:200 A1
HINK-A2-HD-02-GE-001 02 Elevations 1:200 A1
HINK-A2-HD-02-DT-001 02 Part Elevation Detail 1:50 A1
Service Access Building 1
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HGC-00-GA-001 01 Roof Plan & Elevations 1:100 A1
Nuclear Island (Unit 2)
Unit 2: Reactor Building / Fuel Building / Fuel Building Hall / Boron Storage / Safeguard Buildings / Nuclear Auxiliary Building / Access Tower / Service Access Building 3
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HR-02-GP-090 02 Roof Plan 1:200 A0
HINK-A2-HR-02-GE-001 01 South and West Elevations 1:200 A0
HINK-A2-HR-02-GE-002 02 North and East Elevations 1:200 A0
HINK-A2-HR-02-DT-001 01 Part Elevation Detail 1:50 A0
Radioactive Waste Treatment Building / Battery Load Bank
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HQC-00-GP-040 02 Roof Plan 1:100 A1
HINK-A2-HQC-00-GE-001 02 Elevations 1:100 A1
HINK-A2-HQC-00-DT-001 02 Part Elevation Detail 1:50 A1
Emergency Diesel Generator – C / Cooling Water Discharge Weir (Building)
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HD-03-GP-040 02 Roof Plan 1:200 A1
HINK-A2-HD-03-GE-001 02 Elevations 1:200 A1
HINK-A2-HD-03-DT-001 02 Part Elevation Detail 1:50 A1
Emergency Diesel Generator – D / Cooling Water Discharge Weir (Building)
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HD-04-GP-040 02 Roof Plan 1:200 A1
HINK-A2-HD-04-GE-001 02 Elevations 1:200 A1
HINK-A2-HD-04-DT-001 02 Part Elevation Detail 1:50 A1
Service Access Building 4
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HGB-00-GA-001 01 Roof Plan & Elevations 1:100 A1
Conventional Island (Unit 1)
Unit 1: Turbine Hall
Drawing number Rev Drawing title Scale Paper size
HINK-A1-HM-01-GA-006 02 Roof Plan, North and South Elevations 1:200 A0
HINK-A1-HM-01-GE-001 02 West and East Elevations 1:200 A0
HINK-A1-HM-01-DT-001 01 Part Elevation Detail 1:50 A0
Unit 1: Sky Bridges
Drawing number Rev Drawing title Scale Paper size
HINK-A1-BR-01-GP-010 01 Roof Plan 1:100 A1
HINK-A1-BR-01-GE-001 01 North and South Elevations 1:100 A1
HINK-A1-BR-01-GE-002 01 East and West Elevations 1:100 A1
HINK-A1-BR-01-DT-001 01 Part Elevation Detail 1:50 A1
Unit 1: Non Classified Electrical Building
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HF-01-GP-030 02 Roof Plan 1:100 A1
HINK-A2-HF-01-GE-001 02 South Elevation 1:100 A1
HINK-A2-HF-01-GE-002 02 North and East Elevations 1:100 A1
HINK-A2-HF-01-DT-001 02 Part Elevation Detail 1:50 A1
Unit 1: Gas Insulated Switch Gear / Main Transformer / Unit Transformer / Auxiliary Transformer
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HT-01-GP-003 01 Roof 1:200 A1
HINK-A2-HT-01-GE-001 01 Elevations 1:200 A1
HINK-A2-HT-01-DT-001 01 Part Elevation Detail 1:50 A1
Unit 1: Hydrazine Storage
Drawing number Rev Drawing title Scale Paper size
HINK-A2-SIR-01-GA-001 01 Roof Plan and Elevations 1:100 A1
Conventional Island (Unit 2)
Unit 2: Turbine Hall
Drawing number Rev Drawing title Scale Paper size
HINK-A1-HM-02-GA-006 02 Roof Plan, North and South Elevations 1:200 A0
HINK-A1-HM-02-GE-001 02 West and East Elevations 1:200 A0
HINK-A1-HM-02-DT-001 01 Part Elevation Detail 1:50 A0
Unit 2: Sky Bridges
Drawing number Rev Drawing title Scale Paper size
HINK-A1-BR-02-GP-010 01 Roof Plan 1:100 A1
HINK-A1-BR-02-GE-001 01 North and South Elevations 1:100 A1
HINK-A1-BR-02-GE-002 01 East and West Elevations 1:100 A1
HINK-A1-BR-02-DT-001 01 Part Elevation Detail 1:50 A1
Unit 2: Non Classified Electrical Building
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HF-02-GP-030 02 Roof Plan (Lev 10.70m) 1:100 A1
HINK-A2-HF-02-GE-001 02 South Elevation 1:100 A1
HINK-A2-HF-02-GE-002 02 North and West Elevations 1:100 A1
HINK-A2-HF-02-DT-001 02 Part Elevation Detail 1:50 A1
Unit 2: Gas Insulated Switch Gear / Main Transformer / Unit Transformer / Auxiliary Transformer
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HT-02-GP-003 01 Roof 1:200 A1
HINK-A2-HT-02-GE-001 01 Elevations 1:200 A1
HINK-A2-HT-02-DT-001 01 Part Elevation Detail 1:50 A1
Operations
Operational Service Centre
Drawing number Rev Drawing title Scale Paper size
HINK-A1-HB-00-GP-090 01 Roof Plan 1:200 A1
HINK-A1-HB-00-GE-001 01 North and South Elevations 1:200 A1
HINK-A1-HB-00-GE-002 01 East and West Elevations 1:200 A1
HINK-A1-HB-00-DT-001 01 Part Elevation Detail 1:50 A1
Cooling Water Pumphouse and Associated Buildings (Unit 1)
Unit 1: Cooling Water Pumphouse / Forebay / Outfall Pond (Surge Chamber) / Filtering Debris Recovery Pit / Service Access Buildings 5 & 7
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HP-01-GP-030 02 Roof Plan 1:200 A0
HINK-A2-HP-01-GE-001 02 Elevations 1:200 A0
HINK-A2-HP-01-DT-001 02 Part Elevation Detail 1:50 A0
Unit 1: Fire-Fighting Water Building
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HOJ-01-GA-003 02 Roof Plan and Elevations 1:200 A1
HINK-A2-HOJ-01-DT-001 02 Part Elevation Detail 1:50 A1
Discharge Shaft (Units 1 & 2)
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HCT-00-GA-001 01 Roof Plan & Elevations 1:100 A1
Cooling Water Pumphouse and Associated Buildings (Unit 2)
Unit 2: Cooling Water Pumphouse / Forebay / Outfall Pond (Surge Chamber) / Filtering Debris Recovery Pit / Service Access Buildings 6 & 8
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HP-02-GP-030 02 Roof Plan 1:200 A0
HINK-A2-HP-02-GE-001 02 Elevations 1:200 A0
HINK-A2-HP-02-DT-001 02 Part Elevation Detail 1:50 A0
Unit 2: Fire-Fighting Water Building
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HOJ-02-GA-003 02 Roof Plan and Elevations 1:200 A1
HINK-A2-HOJ-02-DT-001 02 Part Elevation Detail 1:50 A1
Remaining Balance of Plant and Other Plant (Unit 1)
Unit 1: Hydrogen Storage
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HZH-01-GA-002 02 Roof Plan and Elevations 1:100 A1
Unit 1: Oxygen Storage
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HZO-01-GA-002 01 Roof Plan and Elevations 1:100 A1
Remaining Balance of Plant and Other Plant (Unit 2)
Unit 2: Hydrogen Storage
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HZH-02-GA-002 02 Roof Plan & Elevations 1:100 A1
Unit 2: Oxygen Storage
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HZO-02-GA-002 01 Roof Plan and Elevations 1:100 A1
Remaining Balance of Plant and Other Plant (Shared Between both Units)
Demineralisation Station
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HY-00-GP-030 02 Roof Plan 1:100 A1
HINK-A2-HY-00-GE-001 02 North and South Elevations 1:100 A1
HINK-A2-HY-00-GE-002 02 East and West Elevations 1:100 A1
HINK-A2-HY-00-DT-001 02 Part Elevation Detail 1:50 A1
Auxiliary Boilers
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HVB-00-GA-004 01 Roof Plan 1:100 A1
HINK-A2-HVB-00-GE-001 01 Elevations 1:100 A1
HINK-A2-HVB-00-DT-001 01 Part Elevation Detail 1:50 A1
Chemical Products Storage
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HZC-00-GA-001 01 Roof Plan and Elevations 1:100 A1
HINK-A2-HZC-00-DT-001 01 Part Elevation Detail 1:50 A1
Sewage Treatment Plant
Drawing number Rev Drawing title Scale Paper size
HINK-A2-STP-00-GA-001 01 Plans and Elevations 1:100 A1
Conventional Island Water Storage Tank – A
Drawing number Rev Drawing title Scale Paper size
HINK-A2-SER-01-GA-002 01 Roof Plan and East Elevation 1:200 A1
Conventional Island Water Storage Tank – B
Drawing number Rev Drawing title Scale Paper size
HINK-A2-SER-02-GA-002 01 Roof Plan and East Elevation 1:200 A1
Nuclear Island Water Storage Tank
Drawing number Rev Drawing title Scale Paper size
HINK-A2-SED-00-GA-002 01 Roof Plan and South and East Elevations 1:100 A1
Degassed Water Storage Tanks
Drawing number Rev Drawing title Scale Paper size
HINK-A2-REA-00-GA-001 01 Roof Plan & Elevations 1:200 A1
Fuel Waste and Storage
Interim Spent Fuel Store
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HHK-00-GP-000 01 Plan 1:200 A0
HINK-A2-HHK-00-GE-001 01 North and South Elevations 1:200 A0
HINK-A2-HHK-00-GE-002 01 East and West Elevations 1:200 A0
Access Control Building
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HUD-00-GA-001 01 Plans and Elevations 1:100 A1
Intermediate Level Waste Interim Storage Facility
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HHI-00-GA-002 01 Roof Plan and Elevations 1:200 A0
HINK-A2-HHI-00-DT-001 01 Part Elevation Detail 1:50 A0
Ancillary, Office and Storage
Main Access Control Building
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HU-00-GP-010 01 Roof Plan 1:100 A1
HINK-A2-HU-00-GE-001 01 Elevations 1:100 A1
HINK-A2-HU-00-DT-001 01 Part Elevation Detail 1:50 A1
Entry Relay Building
Drawing number Rev Drawing title Scale Paper size
HINK-A2-ERB-00-GA-002 01 Roof Plan and Elevations 1:100 A1
HINK-A2-ERB-00-DT-001 01 Part Elevation Detail 1:50 A1
Off-site Vehicle Search Area
Drawing number Rev Drawing title Scale Paper size
HINK-A2-VSA-00-GA-001 01 Roof Plan and Elevations 1:50 A1
Auxiliary Administration Centre
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HUC-00-GP-020 02 Roof Plan 1:100 A1
HINK-A2-HUC-00-GE-001 02 North and South Elevations 1:100 A1
HINK-A2-HUC-00-GE-002 02 East and West Elevations 1:100 A1
HINK-A2-HUC-00-DT-001 02 Part Elevation Detail 1:50 A1
EDF Site Offices
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HAO-00-GE-001 02 Roof & Elevations 1:200 A1
HINK-A2-HAO-00-DT-001 02 Part Elevation Detail 1:50 A1
Garage for Handling Facilities
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HBG-00-GP-010 01 Roof Plan 1:100 A1
HINK-A2-HBG-00-GE-001 01 Elevations 1:100 A1
HINK-A2-HBG-00-DT-001 01 Part Elevation Detail 1:50 A1
Oil and Grease Storage and Oil Ancillary Building
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HOG-00-GA-002 01 Roof Plan 1:100 A1
HINK-A2-HOG-00-GE-001 01 North and South Elevations 1:100 A1
HINK-A2-HOG-00-GE-002 01 East and West Elevations 1:100 A1
HINK-A2-HOG-00-DT-001 01 Part Elevation Detail 1:50 A1
AREVA Warehouse
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HBW-00-GP-010 01 Roof Plan 1:200 A1
HINK-A2-HBW-00-GE-001 01 Elevations 1:200 A1
HINK-A2-HBW-00-DT-001 01 Part Elevation Detail 1:50 A1
Meteorological Station
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HSM-00-GA-002 01 Roof Plan and Elevations 1:50 A1
Outage Access Control Building
Drawing number Rev Drawing title Scale Paper size
HINK-A2-TU1-00-GA-002 01 Roof Plan and Elevations 1:100 A1
HINK-A2-TU1-00-DT-001 01 Part Elevation Detail 1:50 A1
Contaminated Tools Storage
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HHC-01-GA-002 02 Roof Plan and Elevations 1:200 A1
HINK-A2-HHC-01-DT-001 02 Part Elevation Detail 1:50 A1
Conventional Waste Storage
Drawing number Rev Drawing title Scale Paper size
HINK-A2-CWS-00-GA-002 01 Roof Plan and Elevations 1:200 A1
Transit Area for Very Low Level Waste and Low Level Waste
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HHL-00-GE-001 01 Elevations 1:100 A1
Raw Water and Potable Water Supply
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HOR-00-GA-001 02 Roof Plan 1:100 A0
HINK-A2-HOR-00-GA-002 02 Elevations 1:100 A0
HINK-A2-HOR-00-DT-001 02 Part Elevation Detail 1:50 A1
Emergency Response Store
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HHE-00-GA-001 01 Roof Plan & Elevations 1:200 A1
HINK-A2-HHE-00-DT-001 01 Part Elevation Detail 1:50 A1
Services Ventilation Building
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HGM-00-GA-001 01 Roof Plan & Elevations 1:100 A1
Public and Training
Simulator Building / Training Centre
Drawing number Rev Drawing title Scale Paper size
HINK-A1-HBS-00-GP-020 01 Roof Plan 1:200 A1
HINK-A1-HBS-00-GE-001 01 Elevations 1:200 A1
HINK-A1-HBS-00-DT-001 01 Part Elevation Detail 1:50 A1
Public Information Centre
Drawing number Rev Drawing title Scale Paper size
HINK-A1-PIC-00-GP-040 01 Roof Plan 1:100 A1
HINK-A1-PIC-00-GE-001 01 North and West Elevations 1:100 A1
HINK-A1-PIC-00-GE-002 01 South and East Elevations 1:100 A1
HINK-A1-PIC-00-DT-001 01 Part Elevation Detail 1:50 A1
National Grid Substation
Drawing number Rev Drawing title Scale Paper size
HINK-A2-SS-00-GP-010 01 Roof Plan 1:200 A0
HINK-A2-SS-00-GE-001 01 Elevations 1:200 A0
HINK-A2-SS-00-DT-001 01 Part Elevation Detail 1:50 A0
Other Site Structures
Sea Wall (Incorporating Coastal Footpath)
Drawing number Rev Drawing title Scale Paper size
HINK-A2-HSW-00-GA-001 01 Plans 1:500 A0
HINK-A2-HSW-00-GA-002 01 North Elevation 1:50 A0
HINK-A2-HSW-00-GA-003 01 Detail Plans and Elevations 1:50 A0
HINK-A2-HSW-00-GA-004 01 Detail Plan and Elevation 1:100 A0
EDF Energy Pylons
Drawing number Rev Drawing title Scale Paper size
HINK-A1-PL-00-GA-001 01 Location Plan, Plans, Elevations and Axonometric Various A1
Highways Plans
Drawing number Rev Drawing title Scale Paper size
HPC-GEN124-RI-RFC-DRW-000045 01 Northern Roundabout Proposed Layout 1:500 A1
HPC-GEN124-RI-RFC-DRW-000046 01 Vehicle Search Area Layby and Turning Head Proposed Layout 1:250 A1
HPC-GEN124-RI-RFC-DRW-000047 01 Southern Roundabout Proposed Layout During Operation 1:500 A1
HPC-GEN124-RI-RFC-DRW-000048 01 Southern Roundabout Proposed Layout During Construction 1:500 A1
HPC-GEN124-RI-RFC-DRW-000049 01 Emergency Access Road Junction with Existing Highway Proposed Layout 1:250 A1
Site Preparation Plans
Drawing number Rev Drawing title Scale Paper size
HPCSPW002a Rev1 01 Site Layout Plan 1:3500 A1
HPCSPW002b 00 Beach Access Road Plan and Cross Sections 1:250 / 1:50 A1
HPCSPW004 Rev1 01 Planning Application Fencing Arrangement (Sheet 1 of 3) 1:3500 A1
HPCSPW005 Rev1 01 Fencing Enlarged Detail West (Sheet 2 of 3) 1:1500 A1
HPCSPW006 Rev1 01 Fencing Enlarged Detail East (Sheet 3 of 3) 1:1500 A1
HPCSPW007 Rev1 01 Indicative Earthworks Cut and Fill Arrangement 1:3500 A1
HPCSPW008 00 Early Works Water Management Zone 1:2500 A1
HPCSP009 Rev1 01 Surface Water Catchment Area Overall General Arrangement 1:3000 A1
HPCSPW010 00 Arrangement of Construction Drainage Outfall to Foreshore 1:75 A1
HPCSPW011 Rev1 01 Surface Water Drainage Holford Stream Culvert 1:1500 / 1:150 A1
HPCSPW012a 00 Deep Water Drainage Arrangement 1:2000 / 1:100 A1
HPCSPW012b 00 Deep Water Arrangement Spine Drain Sections A and B 1:200 A1
HPCSPW012c 00 Deep Water Assessment Spine Drain Sections C 1:200 A1
HPCSPW013b 00 Typical Cross Section Through Haul Road 1:50 A1
HPCSPW014 00 11kv Sub Station Plan and Elevations 1:100 A1
HPCSPW015 00 Raw Water Reservoir Plans and Sections 1:150 A1
HPCSPW016 Rev1 01 Surface Water Drainage in the Built Development Areas 1:1750 A1
HPCSPW017 00 Site Access Control Arrangement, Floor and Elevation 1:50 A1
HPCSPW019 Rev1 01 Landscape Proposal Plan 1:5000 A1
HPCSPW022 00 Proposed Sewage Treatment Plant – Plans and Sections 1:100 A1
HPCSPW023a 00 Existing and Reinstated Ground Level Cross Sections 1:2500 / 1:500 A1
HPCSPW023b 00 Earthworks Platforms Cross Sections 1:2500 / 1:500 A1
HPCSPW025a Rev2 02 Tree and Hedgerow Retention and Removal 1:4000 A1
HPCSPW025b Rev1 01 Proposed Advanced Planting, Plan 1:1000 A1
HPCSPW026 00 Primary and Secondary Access Tracks 1:3500 A1
HPCSPW027 00 NW Boundary Mitigation During Construction Cross Sections A and B 1:200 A1
HPCSPW028 00 NW Boundary Mitigation During Construction Cross Sections C and D 1:200 A1
HPCSPW029 00 NW Boundary Mitigation During Construction Planting Plan 1:750 A1
( 1 )

2008 c. 29 . Paragraph 2 was amended by paragraph 4 of Schedule 8 to the Marine and Coastal Access Act 2009 (c. 23) , by paragraphs 1 and 72 of Schedule 13 to the Localism Act 2011 (c. 20) , and by section 28 of the Infrastructure Act 2015 (c. 7) . There are other amendments to the Act that are not relevant to this Order.

( 3 )

S.I. 2013/648 , as amended by S.I. 2013/2938 .

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (2015/1666)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application
HPC Accommodation Siteart. 4.HPC_Accomm_rt7s8HX
HPC Permanent Development Siteart. 4.HPC_Perman_rty215U
the Orderart. 2.(“_prnBYKei
undertakerart. 6.undertaker_rtbex4N