🔆 📖 👤

Statutory Instruments

2016 No. 527

Highways, England

The River Tyne (Tunnels) (Revision of Tolls) Order 2016

Made

24th April 2016

Coming into force

22nd May 2016

The Secretary of State for Transport, in exercise of the powers conferred by section 13(2) of the Tyne and Wear Act 1976( 1 ) and Schedule 14 of the River Tyne (Tunnels) Order 2005( 2 ), makes the following Order:

1. This Order may be cited as the River Tyne (Tunnels) (Revision of Tolls) Order 2016 and shall come into force on 22nd May 2016.

2. From the coming into force date of this Order the tolls authorised in pursuance of the River Tyne (Tunnels) Order 2005 and set out in the Tyne Tunnel (Revision of Tolls and Traffic Classification) Order 2001( 3 ) are revised so that the tolls which the North East Combined Authority may demand and recover in respect of all traffic passing through and into the tunnel crossing shall be those specified in the Schedule to this Order.

3. The River Tyne (Tunnels) (Revision of Tolls and Traffic Classification) Order 2013( 4 ) is revoked.

4. In this Order:

motorcycle” means a mechanically propelled vehicle having less than four wheels and, in a case where a cabin is provided, the cabin of which is not so constructed as to enclose the driver and any passenger;

the tunnel crossing” has the same meaning as in article 2(1) of the River Tyne (Tunnels) Order 2005.

Signed by authority of the Secretary of State

CJ Miller

A Senior Civil Servant

in the Department for Transport

24th April 2016

Article 2

SCHEDULE

Class Class of Vehicle Toll (£)
Class 1 Motorcycle (with or without sidecar) or power assisted cycle; £0
Class 1 permit holder after discount £0
Class 2 Mechanically propelled vehicle other than a vehicle in Class 1; £1.70
Having a height of 2 metres or less, or
Having a height greater than 2 metres and less than 3 metres and maximum of 2 axles, or
Being an articulated vehicle with tractor unit height of 2 metres or less and trailer height of less than 3 metres
Class 2 permit holder after discount £1.53
Class 3 Mechanically propelled vehicle other than a vehicle in Classes 1 and 2 £3.30
Class 3 permit holder after discount £2.97
Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The River Tyne (Tunnels) (Revision of Tolls) Order 2016 (2016/527)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application
motorcycleUnknownmotorcycle_rtHJ06R
the tunnel crossingUnknownthe_tunnel_rtJ6ha3
Changes that affect Made by
Sort descending by Changed Legislation Sort descending by Year and Number Changed Provision Type of effect Sort descending by Affecting Legislation Title Sort descending by Year and Number Affecting Provision Sort descending by Changes made to website text Note
The River Tyne (Tunnels) (Revision of Tolls) Order 2016 2016 No. 527 Order revoked The River Tyne (Tunnels) (Revision of Tolls) Order 2018 2018 No. 288 art. 3 Not yet

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.