🔆 📖 👤

Statutory Instruments

2016 No. 623

Offshore Installations

The Offshore Installations (Safety Zones) (No. 2) Order 2016

Made

6th June 2016

Coming into force in accordance with article 1(2)

The Secretary of State makes this Order—

(a)

in exercise of the powers conferred by section 22 of the Petroleum Act 1987( 1 ); and

(b)

for the purpose of giving effect to proposals submitted to him by the Health and Safety Executive under section 24(2A)( 2 ) of that Act.

Citation and commencement

1. —(1) This Order may be cited as the Offshore Installations (Safety Zones) (No. 2) Order 2016.

(2) This Order comes into force on 27th June 2016 except for article 2(2) which comes into force as provided in article 2(3) .

Establishment of safety zones

2. —(1) A safety zone is established around each installation specified in column 1 of Part 1 of the Schedule (being an installation stationed in waters to which subsection (7) of section 21 of the Petroleum Act 1987 applies) having a radius of five hundred metres, as respects that installation, from the point which has the co-ordinates of latitude and longitude according to the World Geodetic System 1984( 3 ) specified in columns 2 and 3 of Part 1 of the Schedule.

(2) A safety zone is established around the installation specified in column 1 of Part 2 of the Schedule (being an installation to be stationed in waters to which subsection (7) of section 21 of the Petroleum Act 1987 applies) having a radius of five hundred metres, as respects that installation, from the point which has the co-ordinates of latitude and longitude according to the World Geodetic System 1984 specified in columns 2 and 3 of Part 2 of the Schedule.

(3) Paragraph (2) comes into force, in respect of the installation specified in column 1 of Part 2 of the Schedule—

(a) on 27th June 2016, where the installation arrives at its station before that date; and

(b) when the installation arrives at its station, in any other case.

Signed by authority of the Secretary of State for Work and Pensions

Justin Tomlinson

Parliamentary Under Secretary of State,

Department for Work and Pensions

6th June 2016

Article 2

SCHEDULE INSTALLATIONS

PART 1 Installations stationed at the time the Order is made

(1)

Name or other designation of the offshore installation

(2)

Latitude

(3)

Longitude

. . . . . . . . .
. . . . . . . . .

PART 2 Installation not stationed at the time the Order is made

(1)

Name or other designation of the offshore installation

(2)

Latitude

(3)

Longitude

Harding Offshore Loading System, Block 9/23b, Harding Field 59°16.67ʹ North 01°32.90ʹ East
( 1 )

1987 c. 12 .

( 2 )

Section 24(2A) was inserted by S.I. 1993/1823 and amended by S.I. 2008/960 .

( 3 )

The World Geodetic System 1984 (“WGS 84”) defines a reference frame for the earth, for use in geodesy and navigation. It was developed by the United States’ National Geospatial-Intelligence Agency and is maintained by it. WGS 84 is defined at paragraph 2.1 of the United States’ National Imagery and Mapping Agency Technical Report TR8350.2, third edition, amendment 1 of 3rd January 2000 entitled “Department of Defense World Geodetic System 1984” ( http://earth-info.nga.mil/GandG/publications/tr8350.2/wgs84fin.pdf ).

Status: There are currently no known outstanding effects for the The Offshore Installations (Safety Zones) (No. 2) Order 2016.
The Offshore Installations (Safety Zones) (No. 2) Order 2016 (2016/623)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
F1Entry in Sch. Pt. 1 omitted (24.12.2024) by virtue of The Offshore Installations (Safety Zones) (No. 2) Order 2024 (S.I. 2024/1278) , arts. 1(2) , 6(2)omitted
F2Entry in Sch. Pt. 1 omitted (8.8.2023) by virtue of The Offshore Installations (Safety Zones) Order 2023 (S.I. 2023/838) , arts. 1(2) , 5(2)omitted
I1Art. 1 in force at 27.6.2016, see art. 1(2)
I2Art. 2(1)(3) in force at 27.6.2016, see art. 1(2)
I3Art. 2(2) comes into force in accordance with art. 2(3)
I4Sch. Pt. 1 in force at 27.6.2016, see art. 1(2)
I5Sch. Pt. 2 in force at 27.6.2016, see art. 1(2)
Defined TermSection/ArticleIDScope of Application
Changes that affect Made by
Sort descending by Changed Legislation Sort descending by Year and Number Changed Provision Type of effect Sort descending by Affecting Legislation Title Sort descending by Year and Number Affecting Provision Sort descending by Changes made to website text Note
The Offshore Installations (Safety Zones) (No. 2) Order 2016 2016 No. 623 art. 1 coming into force The Offshore Installations (Safety Zones) (No. 2) Order 2016 2016 No. 623 art. 1(2) Yes
The Offshore Installations (Safety Zones) (No. 2) Order 2016 2016 No. 623 art. 2(1) (3) coming into force The Offshore Installations (Safety Zones) (No. 2) Order 2016 2016 No. 623 art. 1(2) Yes
The Offshore Installations (Safety Zones) (No. 2) Order 2016 2016 No. 623 art. 2(2) coming into force The Offshore Installations (Safety Zones) (No. 2) Order 2016 2016 No. 623 art. 2(3)(a) (b) Yes
The Offshore Installations (Safety Zones) (No. 2) Order 2016 2016 No. 623 Sch. Pt. 1 coming into force The Offshore Installations (Safety Zones) (No. 2) Order 2016 2016 No. 623 art. 1(2) Yes
The Offshore Installations (Safety Zones) (No. 2) Order 2016 2016 No. 623 Sch. Pt. 2 coming into force The Offshore Installations (Safety Zones) (No. 2) Order 2016 2016 No. 623 art. 1(2) Yes

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.