Infrastructure Planning

The Brechfa Forest Wind Farm Connection (Correction) Order 2017

Made

9th March 2017

Coming into force

10th March 2017

The Brechfa Forest Wind Farm Connection Order 2016 (the β€œOrder”)( 1 ), which granted development consent within the meaning of the Planning Act 2008 (β€œthe Act”)( 2 ), contains correctable errors within the meaning of the Act.

In accordance with paragraph 1(5)(a) of Schedule 4 to the Act, the Secretary of State received, before the end of the relevant period referred to in paragraph 1(6)(a) of that Schedule, a written request from Western Power Distribution (South Wales) Plc to correct errors in the Order. In accordance with paragraph 1(7) of that Schedule, the Secretary of State informed Carmarthenshire County Council that the request had been received.

The Secretary of State, in exercise of the powers conferred by paragraphs 1(4) and (8) of Schedule 4 to the Act, makes the following Order:

Citation and commencement

1. This Order may be cited as the Brechfa Forest Wind Farm Connection (Correction) Order 2017 and comes into force on 10th March 2017.

Corrections

2.The Brechfa Forest Wind Farm Connection Order 2016 is corrected as follows.

(1) In Part 3 of Schedule 2 (Plans), substitute the table with the followingβ€”

β€œ Access and rights of way plans

(1) Drawing title (2) Drawing number (3) Revision
Access and Rights of Way Plans Section A Key Plan – 15/WPD/021 B
Access and Rights of Way Plans Section A Plan Series – 15/WPD/022 B
Access and Rights of Way Plans Section B Key Plan – 15/WPD/023 A
Access and Rights of Way Plans Section B Plan Series – 15/WPD/024 A
Access and Rights of Way Plans Section C Key Plan – 15/WPD/025 A
Access and Rights of Way Plans Section C Plan Series – 15/WPD/026 A ”

(2) In Part 5 of Schedule 2 (Plans), substitute the table with the followingβ€”

β€œ Design drawings

(1)Drawing title (2)Drawing number (3)Revision
Key Plan for Design Drawings 15/WPD/100 A
132kV Overhead Line Work No. 1 Profiles 15/WPD/106 B
132kV Overhead Line Work No. 2 Profiles 15/WPD/102 A
132kV Overhead Line Wood Pole Outlines 15/WPD/103 A
Design Drawings 132kV Underground Cables 15/WPD/104 A ”

(3) In Part 7 of Schedule 2 (Plans), substitute the table with the followingβ€”

β€œ Heritage designations plans

(1)Drawing title (2)Drawing number (3)Revision
Key Plan for Heritage Designations (Section A) 15/WPD/033 B
Key Plan for Heritage Designations (Section B) 15/WPD/035 A
Key Plan for Heritage Designations (Section C) 15/WPD/037 A
Heritage Designations Plan (Section A) 15/WPD/034 B
Heritage Designations Plan (Section B) 15/WPD/036 A
Heritage Designations Plan (Section C) 15/WPD/038 A ”

(4) In Part 8 of Schedule 2 (Plans), substitute the table with the followingβ€”

β€œ Land plans

(1)Drawing title (2)Drawing number (3)Revision
Land Plans Section A Key Plan – 15/WPD/009 B
Land Plans Section A Plan Series – 15/WPD/010 D
Land Plans Section B Key Plan – 15/WPD/011 A
Land Plans Section B Plan Series – 15/WPD/012 D
Land Plans Section C Key Plan – 15/WPD/013 A
Land Plans Section C Plan Series – 15/WPD/014 C ”

(5) In Part 9 of Schedule 2 (Plans), substitute the table with the followingβ€”

β€œ Trees and Hedges with the potential to be affected plans

(1)Drawing title (2)Drawing number (3)Revision
Trees and Hedges with the Potential to be Affected Plans Section A Key Plan – 15/WPD/039 B
Trees and Hedges with the Potential to be Affected Plans Section A Plan Series – 15/WPD/110 B
Trees and Hedges with the Potential to be Affected Plans Section B Key Plan – 15/WPD/041 A
Trees and Hedges with the Potential to be Affected Plans Section B Plan Series – 15/WPD/111 A
Trees and Hedges with the Potential to be Affected Plans Section C Key Plan – 15/WPD/043 A
Trees and Hedges with the Potential to be Affected Plans Section C Plan Series – 15/WPD/044 A ”

(6) In Part 10 of Schedule 2 (Plans), substitute the table with the followingβ€”

β€œ Works plans

(1)Drawing title (2)Drawing number (3)Revision
Works Plans Section A Key Plan – 15/WPD/015 B
Works Plans Section A Plan Series – 15/WPD/107 D
Works Plans Section B Key Plan – 15/WPD/017 A
Works Plans Section B Plan Series – 15/WPD/109 B
Works Plans Section C Key Plan – 15/WPD/019 A
Works Plans Section C Plan Series – 15/WPD/020 B ”

(7) In Requirement 5(4) of Schedule 3 (Requirements), replace β€œA/WP/PS/7” with β€œA/WP/PS/1 Sheet 7 of 7”,

Signed by the authority of the Secretary of State for Business, Energy and Industrial Strategy

Giles Scott

Head of Energy Infrastructure Planning and Coal Liabilities

Department for Business, Energy and Industrial Strategy

9th March 2017

( 2 )

2008 c.29 . Paragraph 1 of Schedule 4 was amended by paragraph 70 of Schedule 13, and Part 20 of Schedule 25, to the Localism Act 2011 (c.20) and by paragraph 4 of Schedule 8 to the Marine and Coastal Access Act 2009 (c.23) . There are other amendments to the Act which are not relevant to this Order.

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Brechfa Forest Wind Farm Connection (Correction) Order 2017 (2017/343)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application
OrderUnknown(the_β€œ_prnQIZOK
the ActUnknown(β€œ_prnmlfNc

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.