Statutory Instruments
2018 No. 1183
Electricity
Gas
The Electricity and Gas (Energy Company Obligation) Order 2018
Made
12th November 2018
Coming into force in accordance with article 1
The Secretary of State makes this Order in exercise of the powers conferred by section 33BD of the Gas Act 1986, section 41B of the Electricity Act 1989, section 103A of the Utilities Act 2000 and section 2(2) of the European Communities Act 1972 , with the agreement of the Scottish Ministers .
The Secretary of State is a Minister designated for the purpose of section 2(2) of the European Communities Act 1972 in relation to energy and energy sources .
The Secretary of State has consulted the Gas and Electricity Markets Authority, the National Association of Citizens Advice Bureaux, the Scottish Association of Citizens Advice Bureaux, electricity distributors, electricity suppliers, gas transporters, gas suppliers and such other persons as the Secretary of State considers appropriate.
A draft of this instrument has been approved by a resolution of each House of Parliament pursuant to section 33BC(12) of the Gas Act 1986, as applied by section 33BD(4) of that Act, section 41A(12) of the Electricity Act 1989, as applied by section 41B(4) of that Act, section 103A(6) of the Utilities Act 2000 and paragraph 2(2) of Schedule 2 to the European Communities Act 1972 .
PART 1 Introduction
Citation and commencement
1. This Order may be cited as the Electricity and Gas (Energy Company Obligation) Order 2018 and comes into force on the 21st day after the day on which this Order is made.
Interpretation
2. In this Orderβ
β 2014 Order β means the Electricity and Gas (Energy Company Obligation) Order 2014 ;
β A to E private rented premises β means private rented premises for which a pre-installation EPC expresses the energy performance rating of the premises as band A, B, C, D or E;
β central heating system β means a system whichβ
provides heat for the purpose of space heating through a boiler or other heat source connected to one or more separate heat emitters; and
does not include a district heating connection;
β commencement date β means the date on which this Order comes into force;
β completed β, in relation to a measure, has the meaning given in article 24(3);
β cost savings β means, in relation to a measureβ
the money that would be saved by that measure over its expected lifetime in heating domestic premises to 21 degrees Celsius in the main living areas and 18 degrees Celsius in all other areas; and
where the measure also resultsβ
in savings in the cost of heating water, the money that would be saved by the measure over its expected lifetime in heating water in those premises; or
in the generation of electricity, the money that would be saved by the measure over its expected lifetime in generating electricity for use at those premises, excluding any electricity generated for the purpose of heating the premises or for heating water;
β demonstration action β has the meaning given in article 20(5);
β district heating connection β means a connection of domestic premises to a district heating system;
β district heating system β means a system that delivers heat through pipes or conduits toβ
at least two domestic premises in at least two separate buildings; or
at least three domestic premises located in a single building, provided that those premises are not all located within one house in multiple occupation, and for the purpose of this definition βhouse in multiple occupationββ
in respect of premises in England and Wales, has the meaning given by section 254 of the Housing Act 2004 ;
in respect of premises in Scotland, has the meaning given to βHMOβ in section 125 of the Housing (Scotland) Act 2006 ;
β domestic customer β means a person living in domestic premises in Great Britain who is supplied with electricity or gas at those premises wholly or mainly for domestic purposes;
β domestic premises β includes a mobile home;
β efficient repairable electric storage heater β means an electric storage heater whichβ
has a responsiveness rating of more than 0.2 when assessed against the Standard Assessment Procedure ; and
is not broken down or, if it is broken down, can be economically repaired;
βenergy performance certificateββ
in respect of domestic premises in England and Wales, has the meaning given in regulation 2 of the Energy Performance of Buildings (England and Wales) Regulations 2012 ;
in respect of domestic premises in Scotland, has the meaning given in regulation 2 of the Energy Performance of Buildings (Scotland) Regulations 2008 ;
βenergy performance ratingββ
in respect of domestic premises in England and Wales, has the meaning given in regulation 11 of the Energy Performance of Buildings (England and Wales) Regulations 2012 ;
in respect of domestic premises in Scotland, has the same meaning as βenergy performance indicatorβ in regulation 2 of the Energy Performance of Buildings (Scotland) Regulations 2008;
β F, G or unrated private rented premises β means private rented premises other than A to E private rented premises;
β first time heating system β means the installation of a central heating system or a district heating connection at domestic premisesβ
which at no point prior to the installation were heated by a central heating system or a district heating system; and
which immediately prior to the installation do not contain an efficient repairable electric storage heater;
βgroupβ, except in article 14(7), means a group of companies that includes as members of the group at least two companies that are licence-holders, and for the purpose of this definitionβ
β company β includes any body corporate; and
β group of companies β means a holding company and the wholly-owned subsidiaries of that holding company where β holding company β and β wholly-owned subsidiary β have the same meaning as in section 1159 of the Companies Act 2006 ;
β innovation measure β has the meaning given in article 21(5);
βinstallationβ, except where otherwise stated, includes the carrying out of a repair, and cognate expressions are to be construed accordingly;
β licence-holder β means a person holding one or both of the followingβ
a licence under section 6(1)(d) of the Electricity Act 1989 ;
a licence under section 7A of the Gas Act 1986 ;
β local authority β meansβ
a county council;
a combined authority established under section 103 of the Local Democracy, Economic Development and Construction Act 2009 ;
a district council;
a London Borough Council;
the Greater London Authority;
the Common Council of the City of London;
the Council of the Isles of Scilly;
a county borough council; or
a council constituted under section 2 of the Local Government etc. (Scotland) Act 1994 ;
β mobile home β means a home which isβ
a caravan within the meaning of Part 1 of the Caravan Sites and Control of Development Act 1960(disregarding the modification made by section 13(2) of the Caravan Sites Act 1968); and
used as a dwelling for the purposes ofβ
Part 1 of the Local Government Finance Act 1992 if it is located in England or Wales;
Part 2 of the Local Government Finance Act 1992 if it is located in Scotland;
β monitored measure β has the meaning given in article 22(5);
β non-renewable source β means a source of energy or technology not mentioned in section 100(4) of the Energy Act 2008 ;
β oil β means liquid hydrocarbons;
β owner β includes any person who under the Lands Clauses Acts would be enabled to sell and convey land to promoters of an undertaking;
β owner-occupied premises β means domestic premises other thanβ
private rented premises; or
social housing;
β participant β has the meaning given in article 3(1) and (2);
β PAS 2030:2019 β means Publicly Available Specification 2030:2019 ;
β PAS 2030:2019 certified installer β means, in relation to a measure, a person who is certified, by a certification body or organisation accredited to EN ISO/IEC 17065:2012 , as compliant with those parts of PAS 2030:2019 that apply to the measure;
β PAS 2035:2019 β means Publicly Available Specification 2035:2019 ;
β phase β means one of the four phases as followsβ
the period starting on the commencement date and ending with 31st March 2019 (βphase 1β);
the twelve months ending with 31st March 2020 (βphase 2β);
the twelve months ending with 31st March 2021 (βphase 3β);
the twelve months ending with 31st March 2022 (βphase 4β);
β post-installation EPC β means, in relation to domestic premises where a measure is installed, an energy performance certificate for the premises that was issued after the measure was installed;
β pre-installation EPC β means, in relation to domestic premises where a measure is installed, an energy performance certificate for the premises that is the most recent of any energy performance certificate for the premises issued before the measure was installed;
β previous energy efficiency schemes β meansβ
the Electricity and Gas (Energy Companies Obligation) Order 2012 ; or
the 2014 Order;
β primary insulation measure β means a qualifying action which is the installation at domestic premises ofβ
insulation of at least 50% of the floor area of the lowest storey of the premises containing a habitable room;
insulation of a cavity wall which divides the premises from other premises under different occupation;
wall insulation applied to at least 50%, by area, of the walls of the premises which are exterior facing;
insulation of at least 50%, by area, of the walls and ceiling of a room in the roof space of the premises;
insulation of at least 50% of the roof area of the premises, where the area insulated includes at least 50% of a flat roof; or
insulation applied to at least 50%, by area, of the floor, walls and ceiling of a mobile home;
β private domestic premises β means domestic premises other than social housing;
β private rented premises β meansβ
in respect of premises in England and Wales, private domestic premises which are a domestic PR property within the meaning of regulation 19 of the Energy Efficiency (Private Rented Property) (England and Wales) Regulations 2015 ; and
in respect of premises in Scotland, private domestic premises let under a tenancy to which Chapter 4 of Part 1 of the Housing (Scotland) Act 2006 applies;
β qualification year β meansβ
for phase 1, the year 2017;
for phase 2, the year 2018;
for phase 3, the year 2019; and
for phase 4, the year 2020;
β qualifying action β has the meaning given in article 13;
β qualifying supply β means, in relation to the qualification year for a phase, the supply to domestic customers ofβ
in the case of phase 1, 500 gigawatt hours of electricity or 1400 gigawatt hours of gas;
in the case of phase 2, 400 gigawatt hours of electricity or 1100 gigawatt hours of gas;
in the case of phase 3, 300 gigawatt hours of electricity or 700 gigawatt hours of gas;
in the case of phase 4, 300 gigawatt hours of electricity or 700 gigawatt hours of gas;
β Reduced Data Standard Assessment Procedure β means the Government's Reduced Data Standard Assessment Procedure for Energy Rating of Dwellings (2012 Edition, version 9.92) ;
β relevant supplier β meansβ
a participant; or
a licence-holder on whom a total carbon emissions reduction obligation was imposed within the meaning of the 2014 Order;
β renewable heating measure β means a measure for the generation of heat wholly or partly by means of a source of energy or technology mentioned in section 100(4) of the Energy Act 2008;
β score β means the contribution that a qualifying action makes towards a participant's total home-heating cost reduction obligation;
β secondary heating measure β means a measure whichβ
is installed at the same domestic premises where a primary insulation measure has been installed (βthe related primary measureβ);
is completed on the same date as, or no more than six months after, the date on which the related primary measure is completed;
is promoted by the same participant who promoted the related primary measure;
is not installed to improve the insulating properties of domestic premises; and
is not the installation of equipment for the generation of heat wholly or partly from oil;
β social housing β means domestic premises described in Schedule 1;
β social landlord β has the meaning given in paragraph 4 of Schedule 1;
β solid wall β includes a metal or timber frame wall or a wall of pre-fabricated concrete construction;
β solid wall insulation β means internal or external insulation of a solid wall, but does not include insulation applied to the walls of a mobile home;
β solid wall minimum requirement β means the amount determined under article 6(1)(b) for a participant in respect of a phase;
β Standard Assessment Procedure β means the Government's Standard Assessment Procedure for Energy Rating of Dwellings (2012 Edition, version 9.92) ;
β surplus action β has the meaning given in article 23(3);
β total home-heating cost reduction obligation β means, in respect of a participant, and subject to article 35, the sum of home-heating cost reduction obligations which have been determined for the participant under article 6;
β total solid wall minimum requirement β has the meaning given in article 11(4);
β wall insulation β meansβ
insulation of a cavity wall;
solid wall insulation.
Definition of a participant
3. β(1) A licence-holder is a participant in relation to a phase ifβ
(a) the licence-holder supplies or, where the licence-holder is a member of a group, the group supplies, more thanβ
(i) a qualifying supply of electricity in the qualification year for that phase; and
(ii) the qualifying number of domestic customers at the end of that qualification year;
(b) the licence-holder supplies or, where the licence-holder is a member of a group, the group supplies, more thanβ
(i) a qualifying supply of gas in the qualification year for that phase; and
(ii) the qualifying number of domestic customers at the end of that qualification year; or
(c) in the case of phase 2, 3 or 4, the licence-holder was a participant in relation to the preceding phase.
(2) Where a dual licence-holder is a participant by virtue of paragraph (1), that licence-holder is to be treated under this Order as two participants, of whichβ
(a) one is a participant in respect of the supply of electricity; and
(b) the other is a participant in respect of the supply of gas.
(3) For the purposes of this articleβ
(a) whether or not a licence-holder is a member of a group is to be determined according to whether the licence-holder was a member of a group at the end of the qualification year; and
(b) where a licence-holder is a member of a group, the amount of electricity or gas supplied by the group in a qualification year is the amount supplied in that year by all licence-holders in the group, whether or not they were members of the group throughout that year.
(4) For the purposes of determining the number of domestic customers of a licence-holder under this Order, a domestic customer who receives electricity and gas from a dual licence-holder is a separate domestic customer under each licence.
(5) In this articleβ
β dual licence-holder β means a person holding a licence under section 6(1)(d) of the Electricity Act 1989 and a licence under section 7A of the Gas Act 1986;
β qualifying number β means, in relation to the end of the qualification year forβ
phase 1, 250,000;
phase 2, 200,000;
phase 3, 150,000;
phase 4, 150,000.
PART 2 Overall home-heating cost reduction target
Overall home-heating cost reduction target
4. For the period from the commencement date to 31st March 2022 the overall home-heating cost reduction target is Β£8.253 billion.
PART 3 Determining obligations
Notification by participants of domestic customers and energy supplied
5. β(1) A licence-holder who is a participant in relation to a phase must notify the Administrator of the number of that participant's domestic customers as at the end of the qualification year for that phase.
(2) That participant must also notify the Administratorβ
(a) where it supplied electricity to domestic customers in that qualification year, of the amount of electricity it so supplied; or
(b) where it supplied gas to domestic customers in that qualification year, of the amount of gas it so supplied.
(3) Where a participant (βPβ) is a member of a group with another participant, P must also notify the Administratorβ
(a) where P supplied electricity to domestic customers in that qualification year, ofβ
(i) the name and company registration number of any other participant in the group that supplied electricity to domestic customers in that year; and
(ii) the amount of electricity supplied to domestic customers by the group in that year; or
(b) where P supplied gas to domestic customers in that qualification year, ofβ
(i) the name and company registration number of any other participant in the group that supplied gas to domestic customers in that year; and
(ii) the amount of gas supplied to domestic customers by the group in that year.
(4) The notifications referred to in paragraphs (1) to (3) must be made in writing on or beforeβ
(a) for phase 1, the date falling 7 days after the commencement date;
(b) for phase 2, 1st February 2019;
(c) for phase 3, 1st February 2020;
(d) for phase 4, 1st February 2021.
(5) Where a participant fails to provide the information in paragraphs (1) to (3), or the Administrator considers any of the information notified by the participant under those paragraphs is inaccurate, the Administrator may determine the matters in those paragraphs.
(6) Anything determined by the Administrator under paragraph (5) is to be treated for the purposes of this Order as if it were notified by the participant.
(7) For the purposes of this articleβ
(a) whether or not a participant is a member of a group is to be determined according to whether the participant was a member of a group at the end of the qualification year; and
(b) where a participant is a member of a group, the amount of electricity or gas supplied by the group in a qualification year is the amount supplied in that year by all participants in the group, whether or not they were members of the group throughout that year.
Determining a participant's home-heating cost reduction obligation and solid wall minimum requirement
6. β(1) The Administrator must determine for each participant in relation to a phaseβ
(a) the participant's home-heating cost reduction obligation for that phase; and
(b) the participant's solid wall minimum requirement for that phase.
(2) For the purposes of paragraph (1), the Administrator mustβ
(a) in the case of a participant who is not a member of a group with another participant at the end of the qualification year for the phase, make the determination in accordance with article 7;
(b) in any other case, make the determination in accordance with article 8.
(3) The Administrator must notify a participant of its home-heating cost reduction obligation and solid wall minimum requirement in writingβ
(a) for phase 1, within 28 days of the commencement date;
(b) for phases 2, 3 and 4, on or before the last day of February prior to the commencement of the phase.
Determining obligations for a participant who is not a member of a group
7. β(1) Where this article appliesβ
(a) if the participant has notified under article 5(2) a supply of electricity or gas in the qualification year for the phase which does not exceed a qualifying supply, the participant's home-heating cost reduction obligation and solid wall minimum requirement for the phase are zero;
(b) in any other case, the participant's home-heating cost reduction obligation and solid wall minimum requirement for the phase are each to be calculated in accordance with the following formulaβ
(2) In this articleβ
(a) βAβ is the value given for the obligation or requirement in the following table for the phaseβ
Phase | Home-heating cost reduction obligation | Solid wall minimum requirement |
---|---|---|
1 | Β£589.5 million | Β£51.5 million |
2 | Β£1.179 billion | Β£103 million |
3 | Β£1.179 billion | Β£103 million |
4 | Β£1.179 billion | Β£103 million |
(b) βTxβ is the amount of electricity or gas supplied in the qualification year for the phase by the participant as determinedβ
(i) for phase 1, in accordance with article 9(2);
(ii) for phases 2 to 4, in accordance with article 10(2); and
(c) βTβ is the total amount of electricity or gas, as applicable, supplied in the qualification year for the phase by all participants as determinedβ
(i) for phase 1, in accordance with article 9(6);
(ii) for phases 2 to 4, in accordance with article 10(4).
Determining obligations for a participant who is a member of a group
8. β(1) Where this article appliesβ
(a) if the participant has notified under article 5(3) a supply of electricity or gas for the group in the qualification year for the phase which does not exceed a qualifying supply, the participant's home-heating cost reduction obligation and solid wall minimum requirement for the phase are zero;
(b) in any other case, the participant's home-heating cost reduction obligation and solid wall minimum requirement for the phase are each to be calculated in accordance with the following formulaβ
(2) In paragraph (1)(b)β
(a) β A β and β T β have the same meaning as in article 7;
(b) βTgβ is the amount of electricity or gas, as applicable, supplied in the qualification year for the phase by the group of which the participant is a member as determinedβ
(i) for phase 1, in accordance with article 9(3);
(ii) for phases 2 to 4, in accordance with article 10(3);
(c) βBβ is the amount of electricity or gas notified by the participant under article 5(2) for the qualification year for the phase; and
(d) βCβ is the amount of electricity or gas notified by the participant under article 5(3) as supplied in the qualification year for the phase by the group of which the participant is a member.
Determining supply for phase 1
9. β(1) This article applies for the purposes of articles 7 and 8.
(2) The amount of electricity or gas supplied by a participant in the qualification year for phase 1 isβ
(a) where the amount notified by the participant under article 5(2) for that year is more than a qualifying supply but less than 1000 gigawatt hours of electricity or 2800 gigawatt hours of gas, the amount determined using the formula in paragraph (4);
(b) where the amount notified under article 5(2) for that year is equal to or more than 1000 gigawatt hours of electricity or 2800 gigawatt hours of gas, the notified amount.
(3) The amount of electricity or gas supplied by a group in the qualification year for phase 1 isβ
(a) where the amount notified by the participant under article 5(3) for that year is more than a qualifying supply but less than 1000 gigawatt hours of electricity or 2800 gigawatt hours of gas, the amount determined using the formula in paragraph (4);
(b) where the amount notified under article 5(3) for that year is equal to or more than 1000 gigawatt hours of electricity or 2800 gigawatt hours of gas, the notified amount.
(4) The formula referred to in paragraphs (2)(a) and (3)(a) isβ
(5) In paragraph (4)β
βDβ isβ
(a)in the case of a participant who is not a member of a group with another participant at the end of the qualification year for phase 1, the amount of electricity or gas notified under article 5(2) as supplied by the participant in the qualification year for phase 1;
(b)in the case of a participant who is a member of a group with another participant at the end of the qualification year for phase 1, the amount of electricity or gas notified under article 5(3) as supplied by the group in the qualification year for phase 1;
βEβ isβ
(a)in the case of electricity, 500 gigawatt hours; or
(b)in the case of gas, 1400 gigawatt hours.
(6) The total amount of electricity or gas supplied in the qualification year for phase 1 by all participants is the sum ofβ
(a) all the electricity or gas supplied in the qualification year by participants that are not members of a group with another participant at the end of the qualification year, as determined in accordance with paragraph (2); and
(b) all the electricity or gas supplied in the qualification year by groups, as determined in accordance with paragraph (3).
(7) In paragraph (6)(b), the reference to βgroupsβ is to those groups that, at the end of the qualification year, include at least two participants.
Determining supply for phases 2 to 4
10. β(1) This article applies for the purposes of articles 7 and 8.
(2) The amount of electricity or gas supplied by a participant in a qualification year for phase 2, 3 or 4 is the amount of electricity or gas notified by the participant under article 5(2) for the qualification year, but deducting an amount equal to the qualifying supply for the phase.
(3) The amount of electricity or gas supplied by a group in a qualification year for phase 2, 3 or 4 is the amount of electricity or gas notified by a participant under article 5(3) as supplied in the qualification year by the group of which the participant is a member, but deducting an amount equal to the qualifying supply for the phase.
(4) The total amount of electricity or gas supplied in a qualification year for phase 2, 3 or 4 by all participants is the sum ofβ
(a) all the electricity or gas supplied in the qualification year by participants that are not members of a group with another participant at the end of the qualification year, as determined in accordance with paragraph (2); and
(b) all the electricity or gas supplied in the qualification year by groups, as determined in accordance with paragraph (3).
(5) In paragraph (4)β
(a) in sub-paragraph (a), the reference to β participants β does not include those participants where the amount of electricity or gas, as applicable, notified under article 5(2) as supplied by the participant in the qualification year does not exceed the qualifying supply for the phase;
(b) in sub-paragraph (b), the reference to βgroupsββ
(i) is to those groups that, at the end of the qualification year, include at least two participants; and
(ii) does not include those groups where the amount of electricity or gas, as applicable, notified under article 5(3) as supplied by the group in the qualification year does not exceed the qualifying supply for the phase.
PART 4 Achievement of obligations
Achievement of home-heating cost reduction obligation
11. β(1) A participant must achieve its total home-heating cost reduction obligation by no later than 31st March 2022.
(2) Subject to article 12, a participant must achieve its total home-heating cost reduction obligation by promoting qualifying actions.
(3) In meeting its total home-heating cost reduction obligationβ
(a) the participant must promote sufficient solid wall actions to meet or exceed its total solid wall minimum requirement; and
(b) at least 15% of the participant's total home-heating cost reduction obligation must be achieved by promoting qualifying actions thatβ
(i) are installed at domestic premises located in a rural area; and
(ii) are not the installation of equipment for the generation of heat wholly or partly from oil.
(4) For the purposes of this Order, a participant's total solid wall minimum requirement is, subject to article 35, the sum of the solid wall minimum requirements which have been determined for the participant under article 6 (and is the amount of the participant's total home-heating cost reduction obligation, as a minimum, which is to be achieved by promoting solid wall actions).
(5) In this articleβ
β rural area β meansβ
in respect of an area in England and Wales, an area classified as rural in the β2011 rural-urban classification of output areasβ published by the Office for National Statistics in August 2013 ;
in respect of an area in Scotland, an area classified as rural in the βScottish Government Urban Rural Classification 2016β published by the Scottish Government in March 2018 ;
β solid wall action β means a qualifying action that isβ
the installation of solid wall insulation to at least 50%, by area, of the exterior facing solid walls of uninsulated solid wall premises; or
a solid wall alternative measure installed at uninsulated solid wall premises that achieves at least the same amount of cost savings as would have been achieved by the installation of solid wall insulation at the premises, those cost savings to be calculatedβ
in accordance with a methodology published by the Administrator under article 33;
disregarding any solid wall insulation already installed at the premises; and
as if the solid wall insulation is installed to at least 95%, by area, of the exterior facing solid walls of the premises;
β solid wall alternative measure β means a qualifying action thatβ
isβ
installed to improve the insulating properties of domestic premises;
the installation of heating controls;
the installation, but not the repair, of a renewable heating measure; or
a connection to a district heating system that delivers heat generated wholly or partly by means of a source of energy or technology mentioned in section 100(4) of the Energy Act 2008; and
is not the installation of solid wall insulation to at least 50%, by area, of the exterior facing solid walls of domestic premises;
β uninsulated solid wall premises β means, in relation to premises at which a qualifying action is installed, domestic premisesβ
with at least one exterior facing wall, whereβ
at least 50%, by area, of the exterior facing walls are solid walls; and
before the installation of the qualifying action takes place, at least 50%, by area, of the exterior facing solid walls do not have internal or external insulation; and
which are not a mobile home.
Caps on certain types of qualifying actions
12. β(1) No more than 25% of a participant's total home-heating cost reduction obligation may be achieved by qualifying actions which areβ
(a) qualifying actions by virtue of meeting the condition in article 17; or
(b) heating qualifying actions, within the meaning of article 16(3) of the 2014 Order, by virtue of meeting the condition in article 16A(3), (4) or (5) of that Order.
(2) No more than 10% of a participant's total home-heating cost reduction obligation may be achieved by qualifying actions which areβ
(a) demonstration actions; or
(b) innovation measures other than excess innovation measures.
(3) No more than 10% of a participant's total home-heating cost reduction obligation may be achieved by qualifying actions which are monitored measures.
(4) No more than 5% of a participant's total home-heating cost reduction obligation may be achieved by the same demonstration action.
(5) No more than 5% of a participant's total home-heating cost reduction obligation may be achieved by innovation measuresβ
(a) which fall within the same innovation measure description; and
(b) which are not excess innovation measures, demonstration actions or monitored measures.
(6) No more than 5% of a participant's total home-heating cost reduction obligation may be achieved by measures which are the repair of a boiler.
(7) No more than 5% of a participant's total home-heating cost reduction obligation may be achieved by measures which are the repair of an electric storage heater.
(8) No more than 21.023% of a participant's total home-heating cost reduction obligation may be achieved by measures to which paragraph (9) applies.
(9) This paragraph applies to a measure which the Administrator is satisfiedβ
(a) is installed at domestic premises which immediately prior to the installation of the measureβ
(i) have a boiler, central heating system or district heating connection which in each case has broken down and cannot be economically repaired;
(ii) have one or more electric storage heaters, all of which are broken down and cannot be economically repaired; or
(iii) do not have a boiler, central heating system, district heating connection or electric storage heater, but which have been heated by a boiler, central heating system, district heating connection or electric storage heater; and
(b) is notβ
(i) installed to improve the insulating properties of domestic premises;
(ii) a district heating connection;
(iii) a first time heating system;
(iv) a secondary heating measure;
(v) the installation of heating controls;
(vi) a demonstration action;
(vii) an innovation measure;
(viii) a renewable heating measure; or
(ix) a repair.
(10) In this articleβ
β excess innovation measure β means an innovation measure which, following an application under article 29(4), is designated as an excess innovation measure for the purposes of that article and this article;
β innovation measure description β has the meaning given in article 21(2).
Qualifying actions
13. β(1) A qualifying action is a measure which the Administrator is satisfiedβ
(a) is installed at domestic premises;
(b) results in the reduction in the cost of heating those premises to 21 degrees Celsius in the main living areas and 18 degrees Celsius in all other areas, or in the case of a demonstration action, is reasonably expected to result in such a reduction;
(c) is completed on or after 1st October 2018;
(d) except in the case of a repair, is installed atβ
(i) premises erected before 1st October 2018; or
(ii) premises which were first occupied as domestic premises before the installation was completed;
(e) meets a condition in any one of articles 14 to 17 (measures installed at private domestic premises, certain social housing or accompanied by a statement from a local authority);
(f) meets the requirements of article 18 (installation standards, warranties and consumer protection);
(g) except in the case of a measure installed to improve the insulating properties of the premises, meets the requirements of article 19 (additional requirements to be met by heating measures); and
(h) is notified to the Administrator in accordance with article 24.
(2) A qualifying action is also a measure which is recognised by the Administrator as a surplus action.
Measures installed at private domestic premises
14. β(1) A measure meets the condition in this article if the measure is installed at owner-occupied premises which are occupied by a member of the help to heat group.
(2) A measure also meets the condition in this article ifβ
(a) the measure is installed at A to E private rented premises occupied by a member of the help to heat group; and
(b) the measure is not the replacement or repair of a boiler, electric storage heater or central heating system that has broken down.
(3) A measure also meets the condition in this article ifβ
(a) the measure is installed at F, G or unrated private rented premises occupied by a member of the help to heat group; and
(b) the measure isβ
(i) solid wall insulation; ...
(ii) a renewable heating measure; or
(iii) a first time heating system.
(4) A measure also meets the condition in this article if the measure (βthe in-fill measureβ) isβ
(a) installed at private domestic premises;
(b) solid wall insulation or a district heating connection; and
(c) linked with at least two other qualifying actions (βthe primary actionsβ) which areβ
(i) also solid wall insulation or district heating connections, as the case may be;
(ii) promoted by the same participant that promoted the in-fill measure;
(iii) each installed at separate domestic premises which areβ
(aa) private domestic premises occupied by a member of the help to heat group; or
(bb) social housing to which paragraph (2) or (3) of article 16 applies;
(iv) installed in the same area as the in-fill measure; and
(v) completed within the same 6 month period as the in-fill measure.
(5) For the purposes of paragraph (4), an in-fill measure is linked with a primary action ifβ
(a) the in-fill measure is notified under article 24 after, or on the same day as, the notification of the primary action under that article;
(b) when notifying the in-fill measure under that article, the participant includes information sufficient to enable the Administrator to identify the primary action with which it is to be linked; and
(c) the primary action is not already linked with another in-fill measure.
(6) For the purposes of paragraph (4)(c)(iv), measures are installed in the same area if the domestic premises at which they are installed are located in the same building, in immediately adjacent buildings or in the same terrace.
(7) In this article, β help to heat group β means a group of persons where each person in the group isβ
(a) awarded at least one of the benefits set out in paragraph 1 of Schedule 2 and meets any condition in relation to that benefit which is specified in that Schedule; or
(b) a core group customer in relation to a scheme year beginning on or after 1st April 2019, where β core group customer β and β scheme year β have the same meaning as in regulation 2 of the Warm Home Discount Regulations 2011 .
Measures installed at D social housing
15. β(1) A measure meets the condition in this article if the measureβ
(a) is installed at social housing to which paragraph (2) or (3) applies; and
(b) is a demonstration action or an innovation measure.
(2) This paragraph applies to social housing if a post-installation EPC expresses the energy performance rating of the social housing as band D.
(3) This paragraph applies to social housing ifβ
(a) a pre-installation EPC expresses the energy performance rating of the social housing as band D; and
(b) the social landlord in respect of the social housing has confirmed in writing that, to the best of its knowledge and belief, no changes were made to the social housing, after the pre-installation EPC was issued and before the measure was installed, which would increase the energy performance rating of the social housing to band A, B or C.
Measures installed at E, F or G social housing
16. β(1) A measure meets the condition in this article if the measureβ
(a) is installed at social housing to which paragraph (2) or (3) applies; and
(b) isβ
(i) installed to improve the insulating properties of the premises;
(ii) a demonstration action;
(iii) an innovation measure; or
(iv) a first time heating system ... .
(2) This paragraph applies to social housing if a post-installation EPC expresses the energy performance rating of the social housing as band E, F or G.
(3) This paragraph applies to social housing ifβ
(a) a pre-installation EPC expresses the energy performance rating of the social housing as band E, F or G; and
(b) the social landlord in respect of the social housing has confirmed in writing that, to the best of its knowledge and belief, no changes were made to the social housing, after the pre-installation EPC was issued and before the measure was installed, which would increase the energy performance rating of the social housing to band A, B, C or D.
(4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Measures accompanied by a statement from a local authority
17. β(1) A measure meets the condition in this article ifβ
(a) the measure is installed at owner-occupied premises;
(b) a local authority has been consulted on the installation of a qualifying action at the premises; and
(c) that local authority has, on or after publication on its website of a statement of intent made in respect of the local authorityβ
(i) made a statement in writing that, in the opinion of the local authority, the premises are occupied by a household living on a low income in a home which cannot be kept warm at a reasonable cost; or
(ii) made a statement in writing that, in the opinion of the local authority, the premises are occupied by a household living on a low income and vulnerable to the effects of living in a cold home.
(2) A measure also meets the condition in this article ifβ
(a) the measure is installed at A to E private rented premises;
(b) paragraphs (1)(b) and (c) apply in respect of the premises; and
(c) the measure is not the replacement or repair of a boiler, electric storage heater or central heating system that has broken down.
(3) A measure also meets the condition in this article ifβ
(a) the measure is installed at F, G or unrated private rented premises;
(b) paragraphs (1)(b) and (c) apply in respect of the premises; and
(c) the measure isβ
(i) solid wall insulation; ...
(ii) a renewable heating measure; or
(iii) a first time heating system.
(4) A measure also meets the condition in this article ifβ
(a) it is solid wall insulation installed at private domestic premises;
(b) a local authority has been consulted on the installation of the solid wall insulation at the premises;
(c) that local authority has, on or after publication on its website of a statement of intent made in respect of the local authority, created a list of premises whichβ
(i) includes the premises at which the measure is installed;
(ii) identifies any premises in the list which in the opinion of the local authority are occupied by a household living on a low income in a home which cannot be kept warm at a reasonable cost; and
(iii) identifies any other premises in the list which in the opinion of the local authority are occupied by a household living on a low income and vulnerable to the effects of living in a cold home; and
(d) the local authority has made a statement in writing thatβ
(i) to the best of the local authority's knowledge and belief, all of the premises included in the list referred to in sub-paragraph (c) are private domestic premises;
(ii) all of the premises included in that list are located in the same building, in immediately adjacent buildings or in the same terrace; and
(iii) in the opinion of the local authority, at least 50% of the premises included in that list are occupied by householdsβ
(aa) living on a low income in a home which cannot be kept warm at a reasonable cost; or
(bb) living on a low income and vulnerable to the effects of living in a cold home.
(5) In this article, β statement of intent β meansβ
(a) a description of how a local authority intends to identify households that may benefit from a qualifying action and are livingβ
(i) on a low income in a home which cannot be kept warm at a reasonable cost; or
(ii) on a low income and are vulnerable to the effects of living in a cold home; or
(b) a statement of intent within the meaning of article 16A of the 2014 Order.
Installation standards, warranties and consumer protection
18.β(1) Where the installation of a measure is completed before 1st July 2021, that measure meets the requirements of this article ifβ
(a) the measure is installed in accordance with paragraph (2);
(b) subject to paragraph (3)β
(i) the measure is installed by, or under the responsibility of, a person who is registered with TrustMark for the purposes of that measure; and
(ii) a certificate of lodgement is issued by the operator of TrustMark in respect of the measure;
(c) in the case of the installation of a district heating connection, the measure meets one of the conditions in paragraph (4);
(d) in the case of the installation of a boilerβ
(i) in the case of a repair, the measure is accompanied by a warranty for at least two years;
(ii) in any other case, the measure is accompanied by a warranty that meets the requirements set out in Schedule 3; and
(e) in the case of the installation of an electric storage heater, the measure is accompanied by a warranty for at least two years.
(2) A measure is installed in accordance with this paragraph if the measureβ
(a) is referred to in PAS 2030:2017 and is installed in accordance with PAS 2030:2017 by, or under the responsibility of, a PAS 2030:2017 certified installer;
(b) is referred to in PAS 2030:2019 and is installed in accordance with PAS 2030:2019 and PAS 2035:2019 by, or under the responsibility of, a PAS 2030:2019 certified installer;
(c) is not referred to in PAS 2030:2017 and is installed by a person of appropriate skill and experience; or
(d) is not referred to in PAS 2030:2019 and is installed by a person of appropriate skill and experience.
(3) Paragraph (1)(b) does not apply where the measureβ
(a) is a demonstration action;
(b) is a district heating connection which falls within paragraph (4)(a) or (b); or
(c) is subject to arrangements for quality assurance and consumer protection, including arrangements for repairs and other remedies, which are equivalent to the requirements under TrustMark.
(4) The installation of a district heating connection meets one of the conditions in this paragraph ifβ
(a) it is a connection to a district heating system registered with the Heat Trust Scheme;
(b) it is subject to arrangements for consumer protection which are equivalent to the requirements under the Heat Trust Scheme; or
(c) it includes the installation of a ground source heat pump at the domestic premises.
(5) Where the installation of a measure is completed on or after 1st July 2021, that measure meets the requirements of this article ifβ
(a) in the case of a measure whichβ
(i) is a demonstration action;
(ii) is a district heating connection which falls within paragraph (4)(a) or (b); or
(iii) is subject to arrangements for quality assurance and consumer protection, including arrangements for repairs and other remedies, which are equivalent to the requirements under TrustMark,
the measure is installed in accordance with paragraph (6);
(b) in the case of a measure which does not fall within sub-paragraph (a)(i) to (iii)β
(i) the measure is installed by, or under the responsibility of, a person who is registered with TrustMark for the purposes of that measure; and
(ii) a certificate of lodgement is issued by the operator of TrustMark in respect of the measure;
(c) in the case of the installation of a district heating connection, the measure meets one of the conditions in paragraph (4); and
(d) in the case of the installation of a boiler which is not a repair, the measure is accompanied by a warranty that meets the requirements set out in Schedule 3.
(6) A measure is installed in accordance with this paragraph if the measureβ
(a) is referred to in PAS 2030:2019 and is installed in accordance with PAS 2030:2019 and PAS 2035:2019 by, or under the responsibility of, a PAS 2030:2019 certified installer; or
(b) is not referred to in PAS 2030:2019 and is installed by a person of appropriate skill and experience.
(7) In this articleβ
βcertificate of lodgementβ means a document entitled βTrustMark Certificate of Lodgementβ which sets out the address at which a measure has been installed and the type of measure;
βground source heat pumpβ means equipment which generates heatβ
using the heat energy provided by a shared ground loop; or
by absorbing energy stored in the form of heat in the ground, including water in the ground, or in surface water;
βHeat Trust Schemeβ means the scheme operated by Heat Customer Protection Ltd, a company registered in England and Wales with company number 09456667;
βPAS 2030:2017β means Publicly Available Specification 2030:2017 ;
βPAS 2030:2017 certified installerβ means, in relation to a measure, a person who is certified, by a certification body or organisation accredited to EN ISO/IEC 17065:2012, as compliant with those parts of PAS 2030:2017 that apply to the measure;
β β means equipment whichβ
absorbs energy stored in the form of heat in the ground, including water in the ground, or in surface water; and
provides heat energy through a hydraulic connection to two or more ground source heat pumps;
βTrustMarkβ means the scheme of that name operated by TrustMark (2005) Limited, a company registered in England and Wales with company number 05480144.
Additional requirements to be met by heating measures
19. β(1) A measure meets the requirements of this article if the measureβ
(a) is not the installation of equipment for the generation of heat wholly or partly from coal;
(b) is not the installation of equipment for the generation of heat wholly or partly from oil, unless the measure isβ
(i) a repair; or
(ii) installed at domestic premises which immediately prior to the installation of the measure have a central heating system or district heating connection that in either case has broken down and cannot be economically repaired;
(c) is not the installation of a connection to a district heating system that delivers heat generated wholly or partly from coal or oil;
(ca) is not the installation of a first time heating system at uninsulated premises;
(d) except in the case of the installation of a ground source heat pump, is not the installation of equipment that is, or has been at any timeβ
(i) an accredited domestic plant within the meaning of the Domestic Renewable Heat Incentive Scheme Regulations 2014 ; or
(ii) an accredited RHI installation within the meaning of the Renewable Heat Incentive Scheme Regulations 2018 ;
(e) is not the installation of a ground source heat pump generating heat in respect of which a participant, or a connected person, is, or has been at any time, entitled toβ
(i) RHI payments, within the meaning of regulation 26 of the Domestic Renewable Heat Incentive Scheme Regulations 2014; or
(ii) periodic support payments within the meaning of regulation 3 of the Renewable Heat Incentive Scheme Regulations 2018;
(f) in the case of a measure installed at domestic premises which immediately prior to the installation of the measure have an efficient repairable heating system, isβ
(i) a district heating connection;
(ii) the installation of heating controls;
(iii) a demonstration action;
(iv) an innovation measure;
(v) a renewable heating measure; or
(vi) a repair; and
(g) in the case of a measure installed at domestic premises which immediately prior to the installation of the measure have an inefficient repairable heating system, isβ
(i) a first time heating system;
(ii) a secondary heating measure;
(iii) a district heating connection;
(iv) the installation of heating controls;
(v) a demonstration action;
(vi) an innovation measure;
(vii) a renewable heating measure; or
(viii) a repair.
(2) In this articleβ
β connected person β means, in relation to a participant, a person connected with the participant within the meaning of section 1122 of the Corporation Tax Act 2010 ;
β efficient repairable heating system β meansβ
an efficient repairable electric storage heater; or
a central heating system or district heating connection whichβ
is not broken down or, if it is broken down, can be economically repaired; and
is not an inefficient repairable heating system;
β electric heating system β means a central heating system or district heating connection which provides heat generated wholly or mainly from electricity;
β ground source heat pump β has the same meaning as in article 18;
β inefficient repairable heating system β means a central heating system, district heating connection or electric storage heater whichβ
is not broken down or, if it is broken down, can be economically repaired;
in the case of a central heating system other than an electric heating systemβ
includes a non-condensing boiler; or
has a peak energy efficiency that is no better than a central heating system falling within sub-paragraph (i);
in the case of a district heating connection other than an electric heating system, is a connection to a district heating system thatβ
includes a non-condensing boiler; or
has a peak energy efficiency that is no better than a central heating system falling within paragraph (b)(i); and
in the case of an electric heating system or an electric storage heater, has a responsiveness rating equal to or less than 0.2 when assessed against the Standard Assessment Procedure;
β peak energy efficiency β means the maximum efficiency at which a central heating system or district heating system, as the case may be, is designed to produce heat.
β room-in-roof β means, in relation to insulation, insulation of the ceiling and walls of a room in the roof space of a building;
β uninsulated premises β means premises other than a mobile homeβ
which include the top floor of the building in which they are located and whichβ
do not have flat roof, loft, rafter or room-in-roof insulation; and
are premises at which flat roof, loft, rafter or room-in-roof insulation can be installed; or
which have exterior facing cavity walls whichβ
can be insulated; and
are not insulated.
PART 5 Applications for demonstration actions, innovation measures, monitored measures and surplus actions
Demonstration actions
20. β(1) A participant may apply to the Administrator in writing for the installation of a measure at two or more domestic premises to be approved as a demonstration action.
(2) An application under paragraph (1) must includeβ
(a) the following informationβ
(i) an explanation of how the measure is expected to achieve cost savings;
(ii) the estimated amount of cost savings expected;
(iii) the arrangements for monitoring whether the measure achieves cost savings;
(iv) the arrangements for assessing the effectiveness of the measure at achieving cost savings;
(v) the arrangements for ensuring the safety of the measure, for repairing or removing any measure that is faulty and for preventing or remedying any adverse impacts caused by the measure on the domestic premises at which it is installed;
(vi) the number of domestic premises at which the participant intends to promote the installation of the measure, and an explanation of how that number was determined;
(vii) the estimated cost in pounds sterling to be incurred by the participant in respect of the matters described in paragraphs (iii) to (vi); and
(viii) such other information relating to the measure as the Administrator may require; and
(b) consent to the publication of information, other than personal data, provided by the participant to the Administrator in relation to the promotion, monitoring and assessment of the measure.
(3) An application under paragraph (1) must be made before the installation of the measure to which the application relates.
(4) The Administrator must not approve the application unless it is satisfied thatβ
(a) the measure to which the application relates is reasonably expected to result in a reduction in the cost of heating domestic premises;
(b) the estimates provided under paragraph (2)(a)(ii) and (vii) are reasonable, and having regard to those estimates, the measure is reasonably expected to provide value for money;
(c) the arrangements described under paragraph (2)(a)(iii) to (v) are reasonable;
(d) the number of domestic premises at which the participant intends to promote the installation of the measure is no more than is necessary in order to demonstrate the effectiveness of the measure at achieving cost savings;
(e) the measure is notβ
(i) the installation of equipment for the generation of heat wholly or partly from oil;
(ii) the installation of equipment for the generation of heat wholly from a non-renewable source; or
(iii) a repair;
(f) the measure is at technology readiness level 8 (system complete and qualified) or technology readiness level 9 (actual system proven in operational environment); and
(g) the measure is materially different from the measures promoted by licence-holders to meet their obligations under previous energy efficiency schemes and from any measures notified under article 24 before the date on which the application was made.
(5) A demonstration action is the installation of a measure at two or more domestic premises which is the subject of an application under paragraph (1) which has been approved by the Administrator.
(6) For the purposes of this articleβ
(a) a measure is not materially different from another measure merely because it is installed at different domestic premises; and
(b) when considering whether a measure is materially different from another measure, the Administrator may have regard to such matters as it thinks fit, including to any one or more of the followingβ
(i) the production method;
(ii) the installation method;
(iii) the materials used;
(iv) the technology used;
(v) the expected costs of promoting the measure;
(vi) the expected cost savings or other benefits of the measure.
(7) In this articleβ
β personal data β has the same meaning as in section 3 of the Data Protection Act 2018 ;
βtechnology readiness levelβ followed by a number has the same meaning as βTRLβ followed by that number in General Annex G to the Horizon 2020 Work Programme 2018-2020 adopted by Commission Decision C(2017)7124 of 27th October 2017 .
Innovation measures
21. β(1) A participant may apply to the Administrator in writing for a measure which the participant intends to promote to be approved as an innovation measure.
(2) An application under paragraph (1) must include the following informationβ
(a) a description of the characteristics of the measure (βthe innovation measure descriptionβ);
(b) an explanation of how the measure isβ
(i) an improvement on the measures that would otherwise be promoted by the participant; or
(ii) an improvement on the measures promoted by licence-holders to meet their obligations under previous energy efficiency schemes; and
(c) such other information relating to the measure as the Administrator may require.
(3) The Administrator must not approve the application unless it is satisfied thatβ
(a) the measure to which the application relates is capable of resulting in a reduction in the cost of heating domestic premises;
(b) the innovation measure description is accurate and contains sufficient detail to distinguish the measure from other measures that are materially different;
(c) the explanation provided under paragraph (2)(b) is reasonable;
(d) the measure is notβ
(i) a district heating connection;
(ii) the installation of equipment for the generation of heat wholly or partly from oil;
(iii) the installation of equipment for the generation of heat wholly from a non-renewable source; or
(iv) a repair; and
(e) the measure is materially different fromβ
(i) the measures promoted by licence-holders to meet their obligations under previous energy efficiency schemes; and
(ii) any measures, other than innovation measures, notified under article 24 before the date of the application under paragraph (1).
(4) If the Administrator approves the application it must publish on its websiteβ
(a) the innovation measure description; and
(b) the date on which the application was approved.
(5) An innovation measure is a measure whichβ
(a) is completed after the date on which an application under paragraph (1) is approved by the Administrator; and
(b) falls within the innovation measure description published by the Administrator in respect of that application.
(6) For the purposes of this article, article 20(6) applies as it applies for the purposes of that article.
Monitored measures
22. β(1) A participant may apply to the Administrator in writing for the installation of a measure at domestic premises to be approved as a monitored measure.
(2) An application under paragraph (1) must includeβ
(a) the following informationβ
(i) the arrangements for monitoring the cost savings achieved by the measure at the premises where it is installed;
(ii) reasons why the arrangements in paragraph (i) are likely to improve the information available about the cost savings achieved by the measure;
(iii) a methodology, based on the performance of the measure at the premises where it is installed, for calculating the cost savings achieved by the measure at those premises; and
(iv) such other information relating to the measure as the Administrator may require; and
(b) consent to the publication of information provided by the participant to the Administrator in relation to the methodology for calculating the cost savings achieved by the measure.
(3) An application under paragraph (1) must be made before the installation of the measure to which the application relates.
(4) The Administrator must not approve the application unless it is satisfied thatβ
(a) the measure to which the application relates is capable of resulting in a reduction in the cost of heating domestic premises;
(b) the arrangements described under paragraph (2)(a)(i) are reasonable, and are likely to improve the information available about the cost savings achieved by the measure;
(c) the methodology provided under paragraph (2)(a)(iii) is reasonable; and
(d) the measure is notβ
(i) a district heating connection;
(ii) the installation of equipment for the generation of heat wholly or partly from oil; or
(iii) a repair.
(5) A monitored measure is a measure which is the subject of an application under paragraph (1) which has been approved by the Administrator.
Surplus actions
23. β(1) On or before 30th November 2019 a relevant supplier may apply to the Administrator in writing for a measure to be recognised as a surplus action.
(2) An application under paragraph (1) must give details of the measure which the applicant considers constitutes a surplus action.
(3) A surplus action is a measure whichβ
(a) is an ECO2 carbon qualifying action or an ECO2 heating qualifying action which was achieved by the applicant;
(b) is not required by the applicant to meet any obligations under the 2014 Order or, by virtue of article 16(6) to (7A) of the 2014 Order, cannot be used by the applicant to meet any obligations under the 2014 Order;
(c) was completed on or after 1st April 2017; and
(d) is not the installation of equipment for the generation of heat wholly or partly from coal.
(4) The Administrator must recognise a measure as a surplus action if, following an application under paragraph (1), the Administrator is satisfied thatβ
(a) the measure to which the application relates is a surplus action; and
(b) in the case of an ECO2 carbon qualifying action, recognition of the measure as a surplus action would not cause the total carbon saving attributable to all of the ECO2 carbon qualifying actions achieved by the applicant and recognised by the Administrator as surplus actions to exceed 20% of the applicant's ECO2 CERO target.
(5) For the purposes of paragraph (4)(b), the carbon saving attributable to an ECO2 carbon qualifying action is the carbon saving attributed to it by the Administrator in accordance with article 25 of the 2014 Order.
(6) In this articleβ
β ECO2 carbon qualifying action β means a carbon qualifying action within the meaning of article 12(3) of the 2014 Order and which was notified to the Administrator in accordance with article 17 of the 2014 Order;
β ECO2 CERO target β means, in relation to an applicant, the applicant's total carbon emissions reduction obligation within the meaning of the 2014 Order;
β ECO2 heating qualifying action β means a heating qualifying action within the meaning of article 16(3) of the 2014 Order and which was notified to the Administrator in accordance with article 17 of the 2014 Order.
PART 6 Notification of completed measures
Notification requirements for completed measures
24. β(1) A measure is notified to the Administrator in accordance with this article if the notificationβ
(a) is made, in writing, by the participant that promoted the measure;
(b) includes a calculation of the score for the measure;
(c) if the measure is a demonstration action, includesβ
(i) the total cost in pounds sterling incurred by the participant in promoting and monitoring the demonstration action (βthe actual costβ);
(ii) a breakdown of the actual cost;
(iii) the information obtained by the participant as to whether the demonstration action achieved cost savings; and
(iv) an assessment of the effectiveness of the demonstration action at achieving cost savings;
(d) includes such other information relating to the measure as the Administrator may require;
(e) is made after the measure is completed; and
(f) is made on time within the meaning of article 25.
(2) The Administrator must publish, on its website, a summary of the information provided by a participant in respect of a demonstration action under paragraph (1)(c).
(3) For the purposes of this Order, a measure is completedβ
(a) in the case of a demonstration action, when the planned monitoring of the demonstration action is completed;
(b) in any other case, when the installation of the measure is completed.
(4) In this article, β planned monitoring β means the arrangements for monitoring whether a demonstration action achieves cost savingsβ
(a) as described in the application for approval of the demonstration action in accordance with article 20(2)(a)(iii); or
(b) as otherwise agreed, in writing, by the Administrator.
Deadline for notification of completed measures
25. β(1) For the purposes of article 24, a notification of a measure is made on time if it is madeβ
(a) before the original deadline, which isβ
(i) in the case of a measure completed before the commencement date, the end of the second month immediately following the month in which this Order comes into force;
(ii) in the case of a measure completed on or after the commencement date, the end of the first month immediately following the month in which the measure was completed;
(b) following an application under paragraph (4) which has been accepted by the Administrator, on or before the date specified by the Administrator under paragraph (6); or
(c) in the case of a measure falling within the 5% notification threshold for the participant (βthe notifying participantβ), before the earlier ofβ
(i) the end of the fourth month after the month in which the measure was completed; and
(ii) the end of June 2022.
(2) For the purposes of paragraph (1)(c), a measure falls within the 5% notification threshold for the notifying participant ifβ
(a) the measure is notified to the Administrator after the original deadline; and
(b) at the time the measure is notified, the result of the following formula is less than or equal to 0.05β
(3) In paragraph (2)β
βFβ is the number of measures (also counting the measure being notified) which areβ
(a)completed in the same month as the measure being notified; and
(b)notified after the original deadline byβ
(i)the notifying participant; or
(ii)by any other participant that is a member of the same group as the notifying participant;
βGβ is the number of measures which areβ
(a)completed in the same month as the measure being notified;
(b)the subject of an application under paragraph (4) which is accepted by the Administrator; and
(c)notified, after the original deadline and on or before the date specified by the Administrator under paragraph (6), byβ
(i)the notifying participant; or
(ii)any other participant that is a member of the same group as the notifying participant;
βHβ is the greater of 1 and the number of measures which areβ
(a)completed in the same month as the measure being notified; and
(b)notified within the original deadline byβ
(i)the notifying participant; or
(ii)any other participant that is a member of the same group as the notifying participant.
(4) A participant may apply at any time to the Administrator in writing for a measure to be notified after the original deadline.
(5) An application under paragraph (4) must includeβ
(a) details of why the participant is seeking an extension of time to notify the measure; and
(b) such other information relating to the measure as the Administrator may require.
(6) Following receipt of an application under paragraph (4), the Administrator mustβ
(a) accept the application and specify a date, as it thinks fit but falling after the original deadline, for the notification of the measure; or
(b) reject the application.
(7) In this article, β original deadline β has the meaning given in paragraph (1)(a).
PART 7 Scores
Attributing the score to a qualifying action
26. β(1) To determine whether a participant has achieved its total home-heating cost reduction obligation, the Administrator must attribute a score to each qualifying action.
(2) In the case of a qualifying action notified by a participant under article 24β
(a) where the Administrator is satisfied that the score notified by the participant under that article is correctly calculated, the Administrator must attribute that score to the qualifying action; or
(b) where the Administrator is not satisfied that the score notified by the participant under that article is correctly calculated, the Administrator must attribute the score which the Administrator considers would have been determined for the action had it been correctly calculated.
(3) In the case of a qualifying action that is a surplus action, the Administrator must attribute the score which is determined by the Administrator in accordance with article 31.
(4) The Administrator must notify in writingβ
(a) a participant of the score it has attributed to a qualifying action notified by the participant under article 24; and
(b) a relevant supplier of the score it has attributed to a surplus action which was the subject of an application by the relevant supplier under article 23.
The score for district heating connections
27. β(1) This article applies for the purpose of calculating the score of a qualifying action whichβ
(a) is a district heating connection; and
(b) is not a demonstration action or a surplus action.
(2) Where this article applies, the score is calculated by determining the cost savings for the qualifying action in accordance with the following formulaeβ
(a) in the case of a qualifying action which meets the conditions in paragraph (2A)β
(b) in all other casesβ
(2A) A qualifying action meets the conditions in this paragraph if the qualifying action is a measure whichβ
(a) is referred to in PAS 2030:2019;
(b) is installed in accordance with PAS 2030:2019 and PAS 2035:2019 by, or under the responsibility of, a PAS 2030:2019 certified installer; and
(c) is completed before 1st July 2021.
(3) In paragraph (2)β
βKβ is the cost savings for the qualifying action determined in accordance withβ
(a)the Standard Assessment Procedure;
(b)the Reduced Data Standard Assessment Procedure; or
(c)following an application under paragraph (4) in respect of the district heating connection, an alternative methodology approved by the Administrator under paragraph (6);
βLβ isβ
(a)1.25, in the case of a district heating connection which isβ
(i)a qualifying action by virtue of meeting the condition in article 17; and
(ii)installed at domestic premises described as relevant F or G owner-occupied premises in Schedule 4;
(b)1, in any other case.
(4) For the purposes of determining the cost savings achieved by a district heating connection (βthe proposed connectionβ), a participant may apply to the Administrator in writing for approval of a methodology other than the Standard Assessment Procedure or the Reduced Data Standard Assessment Procedure (βan alternative methodologyβ).
(5) An application under paragraph (4) must be madeβ
(a) in the case of a district heating connection installed before the commencement date, before the measure is notified to the Administrator under article 24;
(b) in any other case, before the proposed connection is installed.
(6) The Administrator may approve an alternative methodology ifβ
(a) it is satisfied thatβ
(i) neither the Standard Assessment Procedure nor the Reduced Data Standard Assessment Procedure contain an appropriate methodology for determining the cost savings achieved by the proposed connection; and
(ii) the alternative methodology is an appropriate methodology for determining the cost savings achieved by the proposed connection; or
(b) the alternative methodology is published by, or on behalf of, the Secretary of State as a replacement for the Standard Assessment Procedure or the Reduced Data Standard Assessment Procedure.
The score for demonstration actions
28. β(1) This article applies for the purpose of calculating the score of a qualifying action which is a demonstration action.
(2) The score of a demonstration action is calculated in accordance with the following formulaeβ
(a) in the case of a qualifying action which meets the conditions in paragraph (2A)β
(b) in all other casesβ
(2A) A qualifying action meets the conditions in this paragraph if the qualifying action is a measureβ
(a) which is referred to in PAS 2030:2019;
(b) which is installed in accordance with PAS 2030:2019 and PAS 2035:2019 by, or under the responsibility of, a PAS 2030:2019 certified installer; and
(c) in respect of which installation is completed before 1st July 2021.
(3) In paragraph (2), βMβ is the lower ofβ
(a) the actual cost as stated in the notification of the demonstration action in accordance with article 24(1)(c)(i); and
(b) the estimated cost as stated in the application for approval of the demonstration action in accordance with article 20(2)(a)(vii).
The score for innovation measures
29. β(1) This article applies for the purpose of calculating the score of a qualifying action whichβ
(a) is an innovation measure; and
(b) is not a demonstration action or a monitored measure.
(2) Where this article applies, the score is calculated in accordance with the following formulaβ
(3) In paragraph (2)β
βNβ is the cost savings for the qualifying action calculated in accordance with article 32(2); and
βPβ isβ
(a)in the case of a qualifying action which is designated as an excess innovation measure, 1;
(b)in any other case, 1.25.
(4) A participant may apply for a qualifying action which is an innovation measure promoted by the participantβ
(a) to be designated as an excess innovation measure for the purposes of this article and article 12; or
(b) if it is already designated as an excess innovation measure for those purposes, to be no longer so designated.
(5) An application under paragraph (4) mustβ
(a) be made to the Administrator, in writing, by no later than 30th June 2022; and
(b) include such information relating to the qualifying action as the Administrator may require.
(6) The Administrator must approve an application if it is satisfied that the application is made in accordance with paragraphs (4) and (5).
(7) If the Administrator approves an applicationβ
(a) made under paragraph (4)(a), the qualifying action is designated as an excess innovation measure for the purposes of this article and article 12;
(b) made under paragraph (4)(b), the qualifying action ceases to be designated as an excess innovation measure for the purposes of this article and article 12.
The score for monitored measures
30. β(1) This article applies for the purpose of calculating the score of a qualifying action whichβ
(a) is a monitored measure; and
(b) is not a demonstration action.
(2) Where this article applies, the score is the greater ofβ
(a) the score for the qualifying action calculated in accordance with article 32(2); and
(b) eitherβ
(i) the score for the qualifying action calculated in accordance with the methodology stated in the application for approval of the monitored measure in accordance with article 22(2)(a)(iii); or
(ii) if the conditions in paragraph (2A) are met, the score under paragraph (i) multiplied by 1.2.
(2A) The conditions in this paragraph are met if the qualifying action is a measure whichβ
(a) is referred to in PAS 2030:2019;
(b) is installed in accordance with PAS 2030:2019 and PAS 2035:2019 by, or under the responsibility of, a PAS 2030:2019 certified installer; and
(c) is completed before 1st July 2021.
(3) Where the score for the qualifying action is the score under paragraph (2)(b), the Administrator must publish, on its website, a summary of the methodology referred to in that paragraph.
The score for surplus actions
31. β(1) This article applies for the purpose of determining the score of a qualifying action which is a surplus action.
(2) Where a cost score was attributed to the surplus action by the Administrator under article 25 of the 2014 Order, the score is the cost score so attributed.
(3) Where a cost score was not attributed to the surplus action under article 25 of the 2014 Order, the score is the cost score calculated in accordance with articles 19 and 23 of the 2014 Order.
(4) In this article, β cost score β has the meaning given in article 2 of the 2014 Order.
The score for all other qualifying actions
32. β(1) This article applies for the purpose of calculating the score of a qualifying action which is notβ
(a) a district heating connection;
(b) a demonstration action;
(c) an innovation measure;
(d) a monitored measure; or
(e) a surplus action.
(2) Where this article applies, the score is calculated by determining the cost savings for the qualifying action in accordance with the following formulaeβ
(a) in the case of a qualifying action which meets the conditions in paragraph (2A)β
(b) in all other casesβ
(2A) A qualifying action meets the conditions in this paragraph if the qualifying action is a measure whichβ
(a) is referred to in PAS 2030:2019;
(b) is installed in accordance with PAS 2030:2019 and PAS 2035:2019 by, or under the responsibility of, a PAS 2030:2019 certified installer; and
(c) is completed before 1st July 2021.
(3) In paragraph (2)β
βQβ is the cost savings for the qualifying action calculated in accordance with a methodology published by the Administrator under article 33;
βRβ isβ
(a)1.35, in the case of a qualifying action which is installed to improve the insulating properties of non-gas fuelled premises;
(b)4, in the case of a qualifying action which is the replacement of a broken boiler with another boiler and which isβ
(i)a measure to which article 12(9) applies; or
(ii)a renewable heating measure;
(ba)2, in the case of a qualifying action which is the replacement of a broken boiler with another boiler and which is not a qualifying action described in paragraph (b);
(c)2.4, in the case of a qualifying action which is the replacement of a broken electric storage heater with another electric storage heater;
(d)1.25, in the case of a qualifying action whichβ
(i)is not a qualifying action described in paragraph (a), (b) , (ba) or (c);
(ii)is a qualifying action by virtue of meeting the condition in article 17; and
(iii)is installed at domestic premises described as relevant F or G owner-occupied premises in Schedule 4;
(e)1, in all other cases.
(4) In this articleβ
β broken boiler β means a boiler that has broken down and cannot be economically repaired;
β broken electric storage heater β means an electric storage heater that has broken down and cannot be economically repaired;
β non-gas fuelled premises β means domestic premises where, both before and after the installation of the qualifying actionβ
the main space heating system for the premises is not fuelled by mains gas; and
the premises are not connected to a district heating system.
Publication of a cost savings methodology
33. β(1) The Administrator must publish, on its website, a methodology for the purpose of calculating the cost savings of a qualifying action under article 32.
(2) Under the methodology published by the Administrator the calculation of the cost savings must be based onβ
(a) in the case of a qualifying action which is the repair of a boiler or electric storage heater, an expected lifetime for the qualifying action of 2 years;
(b) in the case of a qualifying action which is the replacement of a broken boiler with another boiler, an expected lifetime for the qualifying action of 3 years;
(c) in the case of a qualifying action which is the replacement of a broken electric storage heater with another electric storage heater, an expected lifetime for the qualifying action of 5 years;
(d) in the case of a qualifying action which is the installation of cavity wall insulation and which is accompanied by an appropriate warranty, an expected lifetime for the qualifying action of 42 years;
(e) in the case of a qualifying action which is the installation of insulation applied to the floor, walls and ceiling of a mobile home and which is accompanied by an appropriate warranty, an expected lifetime for the qualifying action of 30 years;
(f) in the case of a qualifying action which is the installation of solid wall insulation and which is accompanied by an appropriate warranty, an expected lifetime for the qualifying action of 36 years; ...
(fa) in the case of a qualifying action which is the installation of room-in-roof insulation and which, if completed on or after 1st July 2020, is accompanied by an appropriate warranty, an expected lifetime for the qualifying action of 42 years;
(fb) in the case of a qualifying action which is the installation of underfloor insulation and which, if completed on or after 1st July 2020, is accompanied by an appropriate warranty, an expected lifetime for the qualifying action of 42 years;
(fc) in the case of a qualifying action which is a first time heating system other than the installation of a district heating connection, an expected lifetime for the qualifying action of 20 years; and
(g) in the case of any other qualifying action, an expected lifetime for the qualifying action that is specified in, or determined in accordance with, the methodology.
(3) Before publishing a methodology under this article, the Administrator must have regard toβ
(a) the Standard Assessment Procedure and the Reduced Data Standard Assessment Procedure, or to any methodology published by, or on behalf of, the Secretary of State as a replacement for the Standard Assessment Procedure or the Reduced Data Standard Assessment Procedure; and
(b) the desirability of the methodology being easy to use.
(4) In this articleβ
β appropriate warranty β means a warranty which the Administrator is satisfiedβ
is supported by a mechanism that gives assurance thatβ
funds will be available to honour the warranty; and
the installation of the insulation and products used in the insulation comply with a quality assurance framework;
is for 25 years or more; and
provides for repair, or replacement where appropriate, of the insulation, covering the cost of remedial and replacement works and materials;
β broken boiler β and β broken electric storage heater β have the same meaning as in article 32;
β room-in-roof β in relation to insulation has the same meaning as in article 19;
β underfloor insulation β means insulation of all or part of the floor of a room in a building, where that floor, or that part of the floor, is not situated above a habitable room.
PART 8 Transfers
Transfers of qualifying actions
34. β(1) A relevant supplier may apply to the Administrator with another relevant supplier for one or more qualifying actions promoted by the relevant supplier (βAβ) to be treated as promoted by the other relevant supplier (βBβ) (βa proposed transferβ).
(2) An application under paragraph (1) mustβ
(a) be made by A and B, in writing, on or before 30th June 2022; and
(b) include such information relating to the proposed transfer as the Administrator may require.
(3) The Administrator must not approve the application ifβ
(a) the application is made in respect of an in-fill measure or a primary action with which an in-fill measure is linked, unless the application is made in respect of the in-fill measure and all of the primary actions with which the in-fill measure is linked; or
(b) the application is made in respect of a secondary heating measure or a measure that is a related primary measure for a secondary heating measure, unless the application is made in respect of the secondary heating measure and its related primary measure.
(4) In paragraph (3)β
(a) β in-fill measure β and β primary actions β have the same meaning as in article 14(4); and
(b) β related primary measure β has the meaning given in the definition of βsecondary heating measureβ in article 2.
(5) If the Administrator decides not to approve the application it must notify A and B in writing of the reasons for that decision.
(6) If the Administrator approves the applicationβ
(a) the qualifying actions in respect of which the application was made are treated as promoted by B and not A; and
(b) the Administrator must notify A and B in writing of the date on which the application was approved.
Transfer of obligations
35. β(1) A participant may apply to the Administrator with another participant for all or part of its total home-heating cost reduction obligation or total solid wall minimum requirement to be transferred from the participant (βAβ) to the other participant (βBβ) (βa proposed transferβ).
(2) An application under paragraph (1) mustβ
(a) be made by A and B, in writing, on or before 30th September 2021;
(b) state in respect of which one of the following the application is being made (βthe relevant obligationβ)β
(i) a total home-heating cost reduction obligation; or
(ii) a total solid wall minimum requirement;
(c) state the amount of its relevant obligation that A intends to transfer to B (βthe proposed transfer amountβ); and
(d) include such other information relating to the proposed transfer as the Administrator may require.
(3) The Administrator must not approve the application ifβ
(a) the proposed transfer amount exceeds A's relevant obligation;
(b) approval of the application would result in A or B's total solid wall minimum requirement being greater than its total home-heating cost reduction obligation;
(c) having regard to section 30O of the Gas Act 1986 and section 27O of the Electricity Act 1989 (maximum amount of penalty or compensation), the Administrator considers that, if the application were approved, there is a significant risk that it would adversely affect the Administrator's ability to enforce the requirements placed on B under this Order; or
(d) where A and B are not members of the same group, the Administrator considers that, if the application were approved, there is a significant risk that B will be unable to achieve its total home-heating cost reduction obligation or total solid wall minimum requirement.
(4) If the Administrator decides not to approve the application it must in writingβ
(a) notify A of any reasons for that decision relating to A; and
(b) notify B of any reasons for that decision relating to B.
(5) If the Administrator approves the applicationβ
(a) A's relevant obligation is treated as reduced by the proposed transfer amount, and the Administrator must notify A in writing of its reduced relevant obligation; and
(b) B's relevant obligation is treated as increased by the proposed transfer amount, and the Administrator must notify B in writing of its increased relevant obligation.
PART 9 Information and enforcement
Final determination and reporting
36. β(1) The Administrator must determine whether a participant has achieved its total home-heating cost reduction obligation.
(2) The Administrator must notify the participant in writing of its determination under paragraph (1) by no later than 30th September 2022.
(3) The Administrator must submit to the Secretary of State a report each month setting out the progress which participants have made towards achieving their total home-heating cost reduction obligation.
(4) The first report under paragraph (3) is to be submitted in the month following the month in which the commencement date occurs.
(5) The final report under paragraph (3) is to be submitted in April 2022.
(6) Not later than 30th September 2022 the Administrator must submit to the Secretary of State a report setting out whether participants achieved the overall home-heating cost reduction target.
Information from participants
37. The Administrator may require a participantβ
(a) to provide it with such information, or information of such nature, as it may specifyβ
(i) about the participant's proposals for complying with any requirement under this Order; or
(ii) relating to the cost to the participant of achieving its total home-heating cost reduction obligation; and
(b) to produce to it evidence, of such kind as it may specify, demonstrating that the participant is complying with, or has complied with, any requirement under this Order.
Publication of energy savings achieved by participants and provision of information to the Secretary of State by participants
38. β(1) At least once in each reporting year the Secretary of State must publish, on a website maintained by or on behalf of the Secretary of State, the energy savings achievedβ
(a) by each participant by qualifying actions whichβ
(i) have been promoted by the participant; and
(ii) are not surplus actions; and
(b) by all qualifying actions other than surplus actions.
(2) No more than once each reporting year, the Secretary of State may require a participant to provide to the Secretary of Stateβ
(a) aggregated statistical information on its final customers (identifying significant changes to previously submitted information); and
(b) current information on final customers' consumption, including, where applicable, load profiles, customer segmentation and geographical location of customers.
(3) In this articleβ
(a) βenergy savingsβ and βfinal customerβ have the meaning given by Article 2 of the Energy Efficiency Directive;
(b) β aggregated statistical information β, β customer segmentation β and β load profiles β have the same meaning as in the Energy Efficiency Directive;
(c) β the Energy Efficiency Directive β means Directive 2012/27/EU of the European Parliament and of the Council on energy efficiency ; and
(d) β reporting year β means 2019, 2020, 2021 and 2022.
Enforcement
39. A requirement placed on a participant under this Order is a relevant requirement for the purpose of Part 1 of the Electricity Act 1989 and Part 1 of the Gas Act 1986.
Claire Perry
Minister of State for Climate Change and Industry
Department for Business, Energy and Industrial Strategy
The Scottish Ministers consent to the making of this Order.
Kevin Stewart
A member of the Scottish Government
Article 2
SCHEDULE 1 Domestic premises which are social housing
1. Domestic premises in England and Wales are βsocial housingβ if the premises are let below the market rate andβ
(a) the relevant interest in those premises is registered as belonging to a social landlord; or
(b) if no relevant interest in the premises has been registered, the premises are let by a social landlord other than under a lease granted pursuant to Part 5 of the Housing Act 1985 .
2. Domestic premises in Scotland are βsocial housingβ if the premises are let below the market rate andβ
(a) the relevant interest in the premises is registered as belonging to a social landlord; or
(b) if no relevant interest in the premises has been registered, the premises are let by a social landlord other than under a lease granted pursuant to sections 61 to 84 of the Housing (Scotland) Act 1987 , as modified by section 84A of that Act .
3. For the purposes of this Scheduleβ
(a) in respect of premises in England and Wales, a relevant interest is registered if it is registered in the register of title maintained by Her Majesty's Land Registry; and
(b) in respect of premises in Scotland, a relevant interest is registered if it isβ
(i) registered in the Land Register of Scotland; or
(ii) recorded in the Register of Sasines.
4. In this Scheduleβ
β relevant interest β meansβ
in respect of premises in England and Walesβ
the freehold estate, unless the whole of the premises have been let under a registered lease; or
the leasehold estate, unless the whole of the premises have been further let under a registered lease; and
in respect of premises in Scotlandβ
the owner's interest or right, unless the whole of the premises have been let under a registered lease; or
the lessee's interest under a lease, unless the whole of the premises have been further let under a registered lease;
β social landlord β meansβ
in respect of premises in Englandβ
a local housing authority, within the meaning of section 1 of the Housing Act 1985 ;
a housing association, within the meaning of section 5 of the Housing Act 1985 ;
a housing trust, within the meaning of section 6 of the Housing Act 1985; or
a charity, within the meaning of section 1 of the Charities Act 2011 ;
in respect of premises in Scotland, a person so described in section 165 of the Housing (Scotland) Act 2010 ; and
in respect of premises in Walesβ
a local housing authority, within the meaning of section 1 of the Housing Act 1985;
a housing association, within the meaning of section 5 of the Housing Act 1985;
a housing trust, within the meaning of section 6 of the Housing Act 1985;
a charity, within the meaning of section 1 of the Charities Act 2011;
a person listed in section 80(1) of the Housing Act 1985 ; or
a body registered as a social landlord under Chapter 1 of Part 1 of the Housing Act 1996 .
Article 14
SCHEDULE 2 Help to heat group eligibility
1. The benefits referred to in the definition of βhelp to heat groupβ in article 14 areβ
(a) armed forces independence payment under a scheme established under section 1 of the Armed Forces (Pensions and Compensation) Act 2004 ;
(b) attendance allowance under Part 3 of the 1992 Act ;
(c) carer's allowance under Part 3 of the 1992 Act ;
(d) child benefit under Part 9 of the 1992 Act ;
(e) child tax credit under section 8 of the Tax Credits Act 2002 ;
(f) constant attendance allowance underβ
(i) article 14 of the Personal Injuries (Civilians) Scheme 1983 , or
(ii) article 8 of the Naval, Military and Air Forces etc (Disablement and Death) Service Pensions Order 2006 ;
(g) disability living allowance under Part 3 of the 1992 Act ;
(h) guarantee credit (and for this purpose β guarantee credit β is to be construed in accordance with sections 1 and 2 of the State Pension Credit Act 2002 );
(i) income-related employment and support allowance within the meaning of section 1 of the Welfare Reform Act 2007 ;
(j) income-based jobseeker's allowance within the meaning of section 1 of the Jobseekers Act 1995 ;
(k) income support under Part 7 of the 1992 Act ;
(l) industrial injuries disablement benefit under Part 5 of the 1992 Act ;
(m) personal independence payment under Part 4 of the Welfare Reform Act 2012 ;
(n) severe disablement allowance under Part 3 of the 1992 Act ;
(o) universal credit under Part 1 of the Welfare Reform Act 2012 ;
(p) mobility supplement as defined in section 150(2) of the 1992 Act ;
(q) working tax credit under section 10 of the Tax Credits Act 2002 .
2. The condition as to income in paragraph 3 is specified in relation to child benefit.
3. Where the person claiming child benefit isβ
(a) a single claimant, the condition as to income is that the claimant's annual income from all sources does not exceed the amount set out in the first row of the table in the column corresponding to the number of children or qualifying young persons for whom the claimant is responsible;
(b) a member of a couple, the condition as to income is that the couple's combined annual income from all sources does not exceed the amount set out in the second row of the table in the column corresponding to the number of children or qualifying young persons for whom at least one member of the couple is responsible.
Table
Type of claimant | Number of children or qualifying young persons | |||
---|---|---|---|---|
1 | 2 | 3 | 4 or more | |
Single claimant | Β£18,500 | Β£23,000 | Β£27,500 | Β£32,000 |
Member of a couple | Β£25,500 | Β£30,000 | Β£34,500 | Β£39,000 |
4. For the purposes of paragraph 3, whether a person is responsible for a child or qualifying young person is to be determined in accordance with Part 9 of the 1992 Act .
5. In this Scheduleβ
β 1992 Act β means the Social Security Contributions and Benefits Act 1992 ;
β child β and β qualifying young person β have the same meaning as in Part 9 of the 1992 Act ;
β couple β meansβ
two people who are married to, or civil partners of, each other and are members of the same household; or
two people who are not married to, or civil partners of, each other but are living together as if they were a married couple or civil partners ;
β single claimant β means a person who is not a member of a couple.
Article 18
SCHEDULE 3 Requirements for warranties for boiler installations
1. The requirements referred to in article 18(1)(d)(ii) and (5)(d) for a warranty are as follows.
2. Subject to paragraph 3, the warranty must provide for the rectification, without any charge to a consumer, of all problems which affect the functioning of the boiler or the heating system it serves and whichβ
(a) relate to its installation or its suitability for the heating system it serves; and
(b) are notified to the person providing the warranty within 2 years of the boiler being installed.
3. The warranty is not required to provide for the rectification of a problem whichβ
(a) is covered by a warranty provided by the manufacturer of the boiler; or
(b) arises after the boiler is installed where that problem arises from one or more ofβ
(i) negligence of a third party;
(ii) accident caused by a third party;
(iii) misuse of the boiler by a third party;
(iv) repair of the boiler by a third party.
4. In paragraph 3, β third party β means a person other thanβ
(a) the person who installed the boiler;
(b) the person providing the warranty; or
(c) a person acting on behalf of a person in sub-paragraph (a) or (b).
5. The warranty must be accompanied by confirmation in writing from an occupier of the domestic premises at which the boiler is installed that, to that person's knowledge, no consumer has been charged for the warranty.
Articles 27 and 32
SCHEDULE 4 Relevant F or G owner-occupied premises
1. A qualifying action is installed at domestic premises that are βrelevant F or G owner-occupied premisesβ ifβ
(a) a relevant local authority has made a statement in writing that, in the opinion of the local authority, the premises are occupiedβ
(i) by a household living on a low income in a home which cannot be kept warm at a reasonable cost; or
(ii) by a household living on a low income and vulnerable to the effects of living in a cold home;
(b) the premises are owner-occupied premises; and
(c) the condition in paragraph 2 or 3 is met.
2. The condition in this paragraph is that a post-installation EPC expresses the energy performance rating of the premises as band F or G.
3. The condition in this paragraph is thatβ
(a) a pre-installation EPC expresses the energy performance rating of the premises as band F or G; and
(b) an owner or occupier of the premises has confirmed in writing that, to the best of its knowledge and belief, no changes were made to the premises, after the pre-installation EPC was issued and before the qualifying action was installed, which would increase the energy performance rating of the premises to band A, B, C, D or E.
4. In this Schedule, β relevant local authority β means a local authority that has published, on its website, a statement of intent made in respect of the local authority, and for the purpose of this definition β statement of intent β has the meaning given in article 17(5).