πŸ”† πŸ“– βž• πŸ‘€

Statutory Instruments

2018 No. 1183

Electricity

Gas

The Electricity and Gas (Energy Company Obligation) Order 2018

Made

12th November 2018

Coming into force in accordance with article 1

The Secretary of State makes this Order in exercise of the powers conferred by section 33BD of the Gas Act 1986, section 41B of the Electricity Act 1989, section 103A of the Utilities Act 2000 and section 2(2) of the European Communities Act 1972 , with the agreement of the Scottish Ministers .

The Secretary of State is a Minister designated for the purpose of section 2(2) of the European Communities Act 1972 in relation to energy and energy sources .

The Secretary of State has consulted the Gas and Electricity Markets Authority, the National Association of Citizens Advice Bureaux, the Scottish Association of Citizens Advice Bureaux, electricity distributors, electricity suppliers, gas transporters, gas suppliers and such other persons as the Secretary of State considers appropriate.

A draft of this instrument has been approved by a resolution of each House of Parliament pursuant to section 33BC(12) of the Gas Act 1986, as applied by section 33BD(4) of that Act, section 41A(12) of the Electricity Act 1989, as applied by section 41B(4) of that Act, section 103A(6) of the Utilities Act 2000 and paragraph 2(2) of Schedule 2 to the European Communities Act 1972 .

PART 1 Introduction

Citation and commencement

1. This Order may be cited as the Electricity and Gas (Energy Company Obligation) Order 2018 and comes into force on the 21st day after the day on which this Order is made.

Interpretation

2. In this Orderβ€”

β€œ 2014 Order ” means the Electricity and Gas (Energy Company Obligation) Order 2014 ;

β€œ A to E private rented premises ” means private rented premises for which a pre-installation EPC expresses the energy performance rating of the premises as band A, B, C, D or E;

β€œ central heating system ” means a system whichβ€”

(a)

provides heat for the purpose of space heating through a boiler or other heat source connected to one or more separate heat emitters; and

(b)

does not include a district heating connection;

β€œ commencement date ” means the date on which this Order comes into force;

β€œ completed ”, in relation to a measure, has the meaning given in article 24(3);

β€œ cost savings ” means, in relation to a measureβ€”

(a)

the money that would be saved by that measure over its expected lifetime in heating domestic premises to 21 degrees Celsius in the main living areas and 18 degrees Celsius in all other areas; and

(b)

where the measure also resultsβ€”

(i)

in savings in the cost of heating water, the money that would be saved by the measure over its expected lifetime in heating water in those premises; or

(ii)

in the generation of electricity, the money that would be saved by the measure over its expected lifetime in generating electricity for use at those premises, excluding any electricity generated for the purpose of heating the premises or for heating water;

β€œ demonstration action ” has the meaning given in article 20(5);

β€œ district heating connection ” means a connection of domestic premises to a district heating system;

β€œ district heating system ” means a system that delivers heat through pipes or conduits toβ€”

(a)

at least two domestic premises in at least two separate buildings; or

(b)

at least three domestic premises located in a single building, provided that those premises are not all located within one house in multiple occupation, and for the purpose of this definition β€œhouse in multiple occupation”—

(i)

in respect of premises in England and Wales, has the meaning given by section 254 of the Housing Act 2004 ;

(ii)

in respect of premises in Scotland, has the meaning given to β€œHMO” in section 125 of the Housing (Scotland) Act 2006 ;

β€œ domestic customer ” means a person living in domestic premises in Great Britain who is supplied with electricity or gas at those premises wholly or mainly for domestic purposes;

β€œ domestic premises ” includes a mobile home;

β€œ efficient repairable electric storage heater ” means an electric storage heater whichβ€”

(a)

has a responsiveness rating of more than 0.2 when assessed against the Standard Assessment Procedure ; and

(b)

is not broken down or, if it is broken down, can be economically repaired;

β€œenergy performance certificate”—

(a)

in respect of domestic premises in England and Wales, has the meaning given in regulation 2 of the Energy Performance of Buildings (England and Wales) Regulations 2012 ;

(b)

in respect of domestic premises in Scotland, has the meaning given in regulation 2 of the Energy Performance of Buildings (Scotland) Regulations 2008 ;

β€œenergy performance rating”—

(a)

in respect of domestic premises in England and Wales, has the meaning given in regulation 11 of the Energy Performance of Buildings (England and Wales) Regulations 2012 ;

(b)

in respect of domestic premises in Scotland, has the same meaning as β€œenergy performance indicator” in regulation 2 of the Energy Performance of Buildings (Scotland) Regulations 2008;

β€œ F, G or unrated private rented premises ” means private rented premises other than A to E private rented premises;

β€œ first time heating system ” means the installation of a central heating system or a district heating connection at domestic premisesβ€”

(a)

which at no point prior to the installation were heated by a central heating system or a district heating system; and

(b)

which immediately prior to the installation do not contain an efficient repairable electric storage heater;

β€œgroup”, except in article 14(7), means a group of companies that includes as members of the group at least two companies that are licence-holders, and for the purpose of this definitionβ€”

(a)

β€œ company ” includes any body corporate; and

(b)

β€œ group of companies ” means a holding company and the wholly-owned subsidiaries of that holding company where β€œ holding company ” and β€œ wholly-owned subsidiary ” have the same meaning as in section 1159 of the Companies Act 2006 ;

β€œ innovation measure ” has the meaning given in article 21(5);

β€œinstallation”, except where otherwise stated, includes the carrying out of a repair, and cognate expressions are to be construed accordingly;

β€œ licence-holder ” means a person holding one or both of the followingβ€”

(a)

a licence under section 6(1)(d) of the Electricity Act 1989 ;

(b)

a licence under section 7A of the Gas Act 1986 ;

β€œ local authority ” meansβ€”

(a)

a county council;

(b)

a combined authority established under section 103 of the Local Democracy, Economic Development and Construction Act 2009 ;

(c)

a district council;

(d)

a London Borough Council;

(e)

the Greater London Authority;

(f)

the Common Council of the City of London;

(g)

the Council of the Isles of Scilly;

(h)

a county borough council; or

(i)

a council constituted under section 2 of the Local Government etc. (Scotland) Act 1994 ;

β€œ mobile home ” means a home which isβ€”

(a)

a caravan within the meaning of Part 1 of the Caravan Sites and Control of Development Act 1960(disregarding the modification made by section 13(2) of the Caravan Sites Act 1968); and

(b)

used as a dwelling for the purposes ofβ€”

(i)

Part 1 of the Local Government Finance Act 1992 if it is located in England or Wales;

(ii)

Part 2 of the Local Government Finance Act 1992 if it is located in Scotland;

β€œ monitored measure ” has the meaning given in article 22(5);

β€œ non-renewable source ” means a source of energy or technology not mentioned in section 100(4) of the Energy Act 2008 ;

β€œ oil ” means liquid hydrocarbons;

β€œ owner ” includes any person who under the Lands Clauses Acts would be enabled to sell and convey land to promoters of an undertaking;

β€œ owner-occupied premises ” means domestic premises other thanβ€”

(a)

private rented premises; or

(b)

social housing;

β€œ participant ” has the meaning given in article 3(1) and (2);

β€œ PAS 2030:2019 ” means Publicly Available Specification 2030:2019 ;

β€œ PAS 2030:2019 certified installer ” means, in relation to a measure, a person who is certified, by a certification body or organisation accredited to EN ISO/IEC 17065:2012 , as compliant with those parts of PAS 2030:2019 that apply to the measure;

β€œ PAS 2035:2019 ” means Publicly Available Specification 2035:2019 ;

β€œ phase ” means one of the four phases as followsβ€”

(a)

the period starting on the commencement date and ending with 31st March 2019 (β€œphase 1”);

(b)

the twelve months ending with 31st March 2020 (β€œphase 2”);

(c)

the twelve months ending with 31st March 2021 (β€œphase 3”);

(d)

the twelve months ending with 31st March 2022 (β€œphase 4”);

β€œ post-installation EPC ” means, in relation to domestic premises where a measure is installed, an energy performance certificate for the premises that was issued after the measure was installed;

β€œ pre-installation EPC ” means, in relation to domestic premises where a measure is installed, an energy performance certificate for the premises that is the most recent of any energy performance certificate for the premises issued before the measure was installed;

β€œ previous energy efficiency schemes ” meansβ€”

(a)

the Electricity and Gas (Energy Companies Obligation) Order 2012 ; or

(b)

the 2014 Order;

β€œ primary insulation measure ” means a qualifying action which is the installation at domestic premises ofβ€”

(a)

insulation of at least 50% of the floor area of the lowest storey of the premises containing a habitable room;

(b)

insulation of a cavity wall which divides the premises from other premises under different occupation;

(c)

wall insulation applied to at least 50%, by area, of the walls of the premises which are exterior facing;

(d)

insulation of at least 50%, by area, of the walls and ceiling of a room in the roof space of the premises;

(e)

insulation of at least 50% of the roof area of the premises, where the area insulated includes at least 50% of a flat roof; or

(f)

insulation applied to at least 50%, by area, of the floor, walls and ceiling of a mobile home;

β€œ private domestic premises ” means domestic premises other than social housing;

β€œ private rented premises ” meansβ€”

(a)

in respect of premises in England and Wales, private domestic premises which are a domestic PR property within the meaning of regulation 19 of the Energy Efficiency (Private Rented Property) (England and Wales) Regulations 2015 ; and

(b)

in respect of premises in Scotland, private domestic premises let under a tenancy to which Chapter 4 of Part 1 of the Housing (Scotland) Act 2006 applies;

β€œ qualification year ” meansβ€”

(a)

for phase 1, the year 2017;

(b)

for phase 2, the year 2018;

(c)

for phase 3, the year 2019; and

(d)

for phase 4, the year 2020;

β€œ qualifying action ” has the meaning given in article 13;

β€œ qualifying supply ” means, in relation to the qualification year for a phase, the supply to domestic customers ofβ€”

(a)

in the case of phase 1, 500 gigawatt hours of electricity or 1400 gigawatt hours of gas;

(b)

in the case of phase 2, 400 gigawatt hours of electricity or 1100 gigawatt hours of gas;

(c)

in the case of phase 3, 300 gigawatt hours of electricity or 700 gigawatt hours of gas;

(d)

in the case of phase 4, 300 gigawatt hours of electricity or 700 gigawatt hours of gas;

β€œ Reduced Data Standard Assessment Procedure ” means the Government's Reduced Data Standard Assessment Procedure for Energy Rating of Dwellings (2012 Edition, version 9.92) ;

β€œ relevant supplier ” meansβ€”

(a)

a participant; or

(b)

a licence-holder on whom a total carbon emissions reduction obligation was imposed within the meaning of the 2014 Order;

β€œ renewable heating measure ” means a measure for the generation of heat wholly or partly by means of a source of energy or technology mentioned in section 100(4) of the Energy Act 2008;

β€œ score ” means the contribution that a qualifying action makes towards a participant's total home-heating cost reduction obligation;

β€œ secondary heating measure ” means a measure whichβ€”

(a)

is installed at the same domestic premises where a primary insulation measure has been installed (β€œthe related primary measure”);

(b)

is completed on the same date as, or no more than six months after, the date on which the related primary measure is completed;

(c)

is promoted by the same participant who promoted the related primary measure;

(d)

is not installed to improve the insulating properties of domestic premises; and

(e)

is not the installation of equipment for the generation of heat wholly or partly from oil;

β€œ social housing ” means domestic premises described in Schedule 1;

β€œ social landlord ” has the meaning given in paragraph 4 of Schedule 1;

β€œ solid wall ” includes a metal or timber frame wall or a wall of pre-fabricated concrete construction;

β€œ solid wall insulation ” means internal or external insulation of a solid wall, but does not include insulation applied to the walls of a mobile home;

β€œ solid wall minimum requirement ” means the amount determined under article 6(1)(b) for a participant in respect of a phase;

β€œ Standard Assessment Procedure ” means the Government's Standard Assessment Procedure for Energy Rating of Dwellings (2012 Edition, version 9.92) ;

β€œ surplus action ” has the meaning given in article 23(3);

β€œ total home-heating cost reduction obligation ” means, in respect of a participant, and subject to article 35, the sum of home-heating cost reduction obligations which have been determined for the participant under article 6;

β€œ total solid wall minimum requirement ” has the meaning given in article 11(4);

β€œ wall insulation ” meansβ€”

(a)

insulation of a cavity wall;

(b)

solid wall insulation.

Definition of a participant

3. β€”(1) A licence-holder is a participant in relation to a phase ifβ€”

(a) the licence-holder supplies or, where the licence-holder is a member of a group, the group supplies, more thanβ€”

(i) a qualifying supply of electricity in the qualification year for that phase; and

(ii) the qualifying number of domestic customers at the end of that qualification year;

(b) the licence-holder supplies or, where the licence-holder is a member of a group, the group supplies, more thanβ€”

(i) a qualifying supply of gas in the qualification year for that phase; and

(ii) the qualifying number of domestic customers at the end of that qualification year; or

(c) in the case of phase 2, 3 or 4, the licence-holder was a participant in relation to the preceding phase.

(2) Where a dual licence-holder is a participant by virtue of paragraph (1), that licence-holder is to be treated under this Order as two participants, of whichβ€”

(a) one is a participant in respect of the supply of electricity; and

(b) the other is a participant in respect of the supply of gas.

(3) For the purposes of this articleβ€”

(a) whether or not a licence-holder is a member of a group is to be determined according to whether the licence-holder was a member of a group at the end of the qualification year; and

(b) where a licence-holder is a member of a group, the amount of electricity or gas supplied by the group in a qualification year is the amount supplied in that year by all licence-holders in the group, whether or not they were members of the group throughout that year.

(4) For the purposes of determining the number of domestic customers of a licence-holder under this Order, a domestic customer who receives electricity and gas from a dual licence-holder is a separate domestic customer under each licence.

(5) In this articleβ€”

β€œ dual licence-holder ” means a person holding a licence under section 6(1)(d) of the Electricity Act 1989 and a licence under section 7A of the Gas Act 1986;

β€œ qualifying number ” means, in relation to the end of the qualification year forβ€”

(a)

phase 1, 250,000;

(b)

phase 2, 200,000;

(c)

phase 3, 150,000;

(d)

phase 4, 150,000.

PART 2 Overall home-heating cost reduction target

Overall home-heating cost reduction target

4. For the period from the commencement date to 31st March 2022 the overall home-heating cost reduction target is Β£8.253 billion.

PART 3 Determining obligations

Notification by participants of domestic customers and energy supplied

5. β€”(1) A licence-holder who is a participant in relation to a phase must notify the Administrator of the number of that participant's domestic customers as at the end of the qualification year for that phase.

(2) That participant must also notify the Administratorβ€”

(a) where it supplied electricity to domestic customers in that qualification year, of the amount of electricity it so supplied; or

(b) where it supplied gas to domestic customers in that qualification year, of the amount of gas it so supplied.

(3) Where a participant (β€œP”) is a member of a group with another participant, P must also notify the Administratorβ€”

(a) where P supplied electricity to domestic customers in that qualification year, ofβ€”

(i) the name and company registration number of any other participant in the group that supplied electricity to domestic customers in that year; and

(ii) the amount of electricity supplied to domestic customers by the group in that year; or

(b) where P supplied gas to domestic customers in that qualification year, ofβ€”

(i) the name and company registration number of any other participant in the group that supplied gas to domestic customers in that year; and

(ii) the amount of gas supplied to domestic customers by the group in that year.

(4) The notifications referred to in paragraphs (1) to (3) must be made in writing on or beforeβ€”

(a) for phase 1, the date falling 7 days after the commencement date;

(b) for phase 2, 1st February 2019;

(c) for phase 3, 1st February 2020;

(d) for phase 4, 1st February 2021.

(5) Where a participant fails to provide the information in paragraphs (1) to (3), or the Administrator considers any of the information notified by the participant under those paragraphs is inaccurate, the Administrator may determine the matters in those paragraphs.

(6) Anything determined by the Administrator under paragraph (5) is to be treated for the purposes of this Order as if it were notified by the participant.

(7) For the purposes of this articleβ€”

(a) whether or not a participant is a member of a group is to be determined according to whether the participant was a member of a group at the end of the qualification year; and

(b) where a participant is a member of a group, the amount of electricity or gas supplied by the group in a qualification year is the amount supplied in that year by all participants in the group, whether or not they were members of the group throughout that year.

Determining a participant's home-heating cost reduction obligation and solid wall minimum requirement

6. β€”(1) The Administrator must determine for each participant in relation to a phaseβ€”

(a) the participant's home-heating cost reduction obligation for that phase; and

(b) the participant's solid wall minimum requirement for that phase.

(2) For the purposes of paragraph (1), the Administrator mustβ€”

(a) in the case of a participant who is not a member of a group with another participant at the end of the qualification year for the phase, make the determination in accordance with article 7;

(b) in any other case, make the determination in accordance with article 8.

(3) The Administrator must notify a participant of its home-heating cost reduction obligation and solid wall minimum requirement in writingβ€”

(a) for phase 1, within 28 days of the commencement date;

(b) for phases 2, 3 and 4, on or before the last day of February prior to the commencement of the phase.

Determining obligations for a participant who is not a member of a group

7. β€”(1) Where this article appliesβ€”

(a) if the participant has notified under article 5(2) a supply of electricity or gas in the qualification year for the phase which does not exceed a qualifying supply, the participant's home-heating cost reduction obligation and solid wall minimum requirement for the phase are zero;

(b) in any other case, the participant's home-heating cost reduction obligation and solid wall minimum requirement for the phase are each to be calculated in accordance with the following formulaβ€”

(2) In this articleβ€”

(a) β€œA” is the value given for the obligation or requirement in the following table for the phaseβ€”

Phase Home-heating cost reduction obligation Solid wall minimum requirement
1 Β£589.5 million Β£51.5 million
2 Β£1.179 billion Β£103 million
3 Β£1.179 billion Β£103 million
4 Β£1.179 billion Β£103 million

(b) β€œTx” is the amount of electricity or gas supplied in the qualification year for the phase by the participant as determinedβ€”

(i) for phase 1, in accordance with article 9(2);

(ii) for phases 2 to 4, in accordance with article 10(2); and

(c) β€œT” is the total amount of electricity or gas, as applicable, supplied in the qualification year for the phase by all participants as determinedβ€”

(i) for phase 1, in accordance with article 9(6);

(ii) for phases 2 to 4, in accordance with article 10(4).

Determining obligations for a participant who is a member of a group

8. β€”(1) Where this article appliesβ€”

(a) if the participant has notified under article 5(3) a supply of electricity or gas for the group in the qualification year for the phase which does not exceed a qualifying supply, the participant's home-heating cost reduction obligation and solid wall minimum requirement for the phase are zero;

(b) in any other case, the participant's home-heating cost reduction obligation and solid wall minimum requirement for the phase are each to be calculated in accordance with the following formulaβ€”

(2) In paragraph (1)(b)β€”

(a) β€œ A ” and β€œ T ” have the same meaning as in article 7;

(b) β€œTg” is the amount of electricity or gas, as applicable, supplied in the qualification year for the phase by the group of which the participant is a member as determinedβ€”

(i) for phase 1, in accordance with article 9(3);

(ii) for phases 2 to 4, in accordance with article 10(3);

(c) β€œB” is the amount of electricity or gas notified by the participant under article 5(2) for the qualification year for the phase; and

(d) β€œC” is the amount of electricity or gas notified by the participant under article 5(3) as supplied in the qualification year for the phase by the group of which the participant is a member.

Determining supply for phase 1

9. β€”(1) This article applies for the purposes of articles 7 and 8.

(2) The amount of electricity or gas supplied by a participant in the qualification year for phase 1 isβ€”

(a) where the amount notified by the participant under article 5(2) for that year is more than a qualifying supply but less than 1000 gigawatt hours of electricity or 2800 gigawatt hours of gas, the amount determined using the formula in paragraph (4);

(b) where the amount notified under article 5(2) for that year is equal to or more than 1000 gigawatt hours of electricity or 2800 gigawatt hours of gas, the notified amount.

(3) The amount of electricity or gas supplied by a group in the qualification year for phase 1 isβ€”

(a) where the amount notified by the participant under article 5(3) for that year is more than a qualifying supply but less than 1000 gigawatt hours of electricity or 2800 gigawatt hours of gas, the amount determined using the formula in paragraph (4);

(b) where the amount notified under article 5(3) for that year is equal to or more than 1000 gigawatt hours of electricity or 2800 gigawatt hours of gas, the notified amount.

(4) The formula referred to in paragraphs (2)(a) and (3)(a) isβ€”

(5) In paragraph (4)β€”

(6) The total amount of electricity or gas supplied in the qualification year for phase 1 by all participants is the sum ofβ€”

(a) all the electricity or gas supplied in the qualification year by participants that are not members of a group with another participant at the end of the qualification year, as determined in accordance with paragraph (2); and

(b) all the electricity or gas supplied in the qualification year by groups, as determined in accordance with paragraph (3).

(7) In paragraph (6)(b), the reference to β€œgroups” is to those groups that, at the end of the qualification year, include at least two participants.

Determining supply for phases 2 to 4

10. β€”(1) This article applies for the purposes of articles 7 and 8.

(2) The amount of electricity or gas supplied by a participant in a qualification year for phase 2, 3 or 4 is the amount of electricity or gas notified by the participant under article 5(2) for the qualification year, but deducting an amount equal to the qualifying supply for the phase.

(3) The amount of electricity or gas supplied by a group in a qualification year for phase 2, 3 or 4 is the amount of electricity or gas notified by a participant under article 5(3) as supplied in the qualification year by the group of which the participant is a member, but deducting an amount equal to the qualifying supply for the phase.

(4) The total amount of electricity or gas supplied in a qualification year for phase 2, 3 or 4 by all participants is the sum ofβ€”

(a) all the electricity or gas supplied in the qualification year by participants that are not members of a group with another participant at the end of the qualification year, as determined in accordance with paragraph (2); and

(b) all the electricity or gas supplied in the qualification year by groups, as determined in accordance with paragraph (3).

(5) In paragraph (4)β€”

(a) in sub-paragraph (a), the reference to β€œ participants ” does not include those participants where the amount of electricity or gas, as applicable, notified under article 5(2) as supplied by the participant in the qualification year does not exceed the qualifying supply for the phase;

(b) in sub-paragraph (b), the reference to β€œgroups”—

(i) is to those groups that, at the end of the qualification year, include at least two participants; and

(ii) does not include those groups where the amount of electricity or gas, as applicable, notified under article 5(3) as supplied by the group in the qualification year does not exceed the qualifying supply for the phase.

PART 4 Achievement of obligations

Achievement of home-heating cost reduction obligation

11. β€”(1) A participant must achieve its total home-heating cost reduction obligation by no later than 31st March 2022.

(2) Subject to article 12, a participant must achieve its total home-heating cost reduction obligation by promoting qualifying actions.

(3) In meeting its total home-heating cost reduction obligationβ€”

(a) the participant must promote sufficient solid wall actions to meet or exceed its total solid wall minimum requirement; and

(b) at least 15% of the participant's total home-heating cost reduction obligation must be achieved by promoting qualifying actions thatβ€”

(i) are installed at domestic premises located in a rural area; and

(ii) are not the installation of equipment for the generation of heat wholly or partly from oil.

(4) For the purposes of this Order, a participant's total solid wall minimum requirement is, subject to article 35, the sum of the solid wall minimum requirements which have been determined for the participant under article 6 (and is the amount of the participant's total home-heating cost reduction obligation, as a minimum, which is to be achieved by promoting solid wall actions).

(5) In this articleβ€”

β€œ rural area ” meansβ€”

(a)

in respect of an area in England and Wales, an area classified as rural in the β€œ2011 rural-urban classification of output areas” published by the Office for National Statistics in August 2013 ;

(b)

in respect of an area in Scotland, an area classified as rural in the β€œScottish Government Urban Rural Classification 2016” published by the Scottish Government in March 2018 ;

β€œ solid wall action ” means a qualifying action that isβ€”

(a)

the installation of solid wall insulation to at least 50%, by area, of the exterior facing solid walls of uninsulated solid wall premises; or

(b)

a solid wall alternative measure installed at uninsulated solid wall premises that achieves at least the same amount of cost savings as would have been achieved by the installation of solid wall insulation at the premises, those cost savings to be calculatedβ€”

(i)

in accordance with a methodology published by the Administrator under article 33;

(ii)

disregarding any solid wall insulation already installed at the premises; and

(iii)

as if the solid wall insulation is installed to at least 95%, by area, of the exterior facing solid walls of the premises;

β€œ solid wall alternative measure ” means a qualifying action thatβ€”

(a)

isβ€”

(i)

installed to improve the insulating properties of domestic premises;

(ii)

the installation of heating controls;

(iii)

the installation, but not the repair, of a renewable heating measure; or

(iv)

a connection to a district heating system that delivers heat generated wholly or partly by means of a source of energy or technology mentioned in section 100(4) of the Energy Act 2008; and

(b)

is not the installation of solid wall insulation to at least 50%, by area, of the exterior facing solid walls of domestic premises;

β€œ uninsulated solid wall premises ” means, in relation to premises at which a qualifying action is installed, domestic premisesβ€”

(a)

with at least one exterior facing wall, whereβ€”

(i)

at least 50%, by area, of the exterior facing walls are solid walls; and

(ii)

before the installation of the qualifying action takes place, at least 50%, by area, of the exterior facing solid walls do not have internal or external insulation; and

(b)

which are not a mobile home.

Caps on certain types of qualifying actions

12. β€”(1) No more than 25% of a participant's total home-heating cost reduction obligation may be achieved by qualifying actions which areβ€”

(a) qualifying actions by virtue of meeting the condition in article 17; or

(b) heating qualifying actions, within the meaning of article 16(3) of the 2014 Order, by virtue of meeting the condition in article 16A(3), (4) or (5) of that Order.

(2) No more than 10% of a participant's total home-heating cost reduction obligation may be achieved by qualifying actions which areβ€”

(a) demonstration actions; or

(b) innovation measures other than excess innovation measures.

(3) No more than 10% of a participant's total home-heating cost reduction obligation may be achieved by qualifying actions which are monitored measures.

(4) No more than 5% of a participant's total home-heating cost reduction obligation may be achieved by the same demonstration action.

(5) No more than 5% of a participant's total home-heating cost reduction obligation may be achieved by innovation measuresβ€”

(a) which fall within the same innovation measure description; and

(b) which are not excess innovation measures, demonstration actions or monitored measures.

(6) No more than 5% of a participant's total home-heating cost reduction obligation may be achieved by measures which are the repair of a boiler.

(7) No more than 5% of a participant's total home-heating cost reduction obligation may be achieved by measures which are the repair of an electric storage heater.

(8) No more than 21.023% of a participant's total home-heating cost reduction obligation may be achieved by measures to which paragraph (9) applies.

(9) This paragraph applies to a measure which the Administrator is satisfiedβ€”

(a) is installed at domestic premises which immediately prior to the installation of the measureβ€”

(i) have a boiler, central heating system or district heating connection which in each case has broken down and cannot be economically repaired;

(ii) have one or more electric storage heaters, all of which are broken down and cannot be economically repaired; or

(iii) do not have a boiler, central heating system, district heating connection or electric storage heater, but which have been heated by a boiler, central heating system, district heating connection or electric storage heater; and

(b) is notβ€”

(i) installed to improve the insulating properties of domestic premises;

(ii) a district heating connection;

(iii) a first time heating system;

(iv) a secondary heating measure;

(v) the installation of heating controls;

(vi) a demonstration action;

(vii) an innovation measure;

(viii) a renewable heating measure; or

(ix) a repair.

(10) In this articleβ€”

β€œ excess innovation measure ” means an innovation measure which, following an application under article 29(4), is designated as an excess innovation measure for the purposes of that article and this article;

β€œ innovation measure description ” has the meaning given in article 21(2).

Qualifying actions

13. β€”(1) A qualifying action is a measure which the Administrator is satisfiedβ€”

(a) is installed at domestic premises;

(b) results in the reduction in the cost of heating those premises to 21 degrees Celsius in the main living areas and 18 degrees Celsius in all other areas, or in the case of a demonstration action, is reasonably expected to result in such a reduction;

(c) is completed on or after 1st October 2018;

(d) except in the case of a repair, is installed atβ€”

(i) premises erected before 1st October 2018; or

(ii) premises which were first occupied as domestic premises before the installation was completed;

(e) meets a condition in any one of articles 14 to 17 (measures installed at private domestic premises, certain social housing or accompanied by a statement from a local authority);

(f) meets the requirements of article 18 (installation standards, warranties and consumer protection);

(g) except in the case of a measure installed to improve the insulating properties of the premises, meets the requirements of article 19 (additional requirements to be met by heating measures); and

(h) is notified to the Administrator in accordance with article 24.

(2) A qualifying action is also a measure which is recognised by the Administrator as a surplus action.

Measures installed at private domestic premises

14. β€”(1) A measure meets the condition in this article if the measure is installed at owner-occupied premises which are occupied by a member of the help to heat group.

(2) A measure also meets the condition in this article ifβ€”

(a) the measure is installed at A to E private rented premises occupied by a member of the help to heat group; and

(b) the measure is not the replacement or repair of a boiler, electric storage heater or central heating system that has broken down.

(3) A measure also meets the condition in this article ifβ€”

(a) the measure is installed at F, G or unrated private rented premises occupied by a member of the help to heat group; and

(b) the measure isβ€”

(i) solid wall insulation; ...

(ii) a renewable heating measure; or

(iii) a first time heating system.

(4) A measure also meets the condition in this article if the measure (β€œthe in-fill measure”) isβ€”

(a) installed at private domestic premises;

(b) solid wall insulation or a district heating connection; and

(c) linked with at least two other qualifying actions (β€œthe primary actions”) which areβ€”

(i) also solid wall insulation or district heating connections, as the case may be;

(ii) promoted by the same participant that promoted the in-fill measure;

(iii) each installed at separate domestic premises which areβ€”

(aa) private domestic premises occupied by a member of the help to heat group; or

(bb) social housing to which paragraph (2) or (3) of article 16 applies;

(iv) installed in the same area as the in-fill measure; and

(v) completed within the same 6 month period as the in-fill measure.

(5) For the purposes of paragraph (4), an in-fill measure is linked with a primary action ifβ€”

(a) the in-fill measure is notified under article 24 after, or on the same day as, the notification of the primary action under that article;

(b) when notifying the in-fill measure under that article, the participant includes information sufficient to enable the Administrator to identify the primary action with which it is to be linked; and

(c) the primary action is not already linked with another in-fill measure.

(6) For the purposes of paragraph (4)(c)(iv), measures are installed in the same area if the domestic premises at which they are installed are located in the same building, in immediately adjacent buildings or in the same terrace.

(7) In this article, β€œ help to heat group ” means a group of persons where each person in the group isβ€”

(a) awarded at least one of the benefits set out in paragraph 1 of Schedule 2 and meets any condition in relation to that benefit which is specified in that Schedule; or

(b) a core group customer in relation to a scheme year beginning on or after 1st April 2019, where β€œ core group customer ” and β€œ scheme year ” have the same meaning as in regulation 2 of the Warm Home Discount Regulations 2011 .

Measures installed at D social housing

15. β€”(1) A measure meets the condition in this article if the measureβ€”

(a) is installed at social housing to which paragraph (2) or (3) applies; and

(b) is a demonstration action or an innovation measure.

(2) This paragraph applies to social housing if a post-installation EPC expresses the energy performance rating of the social housing as band D.

(3) This paragraph applies to social housing ifβ€”

(a) a pre-installation EPC expresses the energy performance rating of the social housing as band D; and

(b) the social landlord in respect of the social housing has confirmed in writing that, to the best of its knowledge and belief, no changes were made to the social housing, after the pre-installation EPC was issued and before the measure was installed, which would increase the energy performance rating of the social housing to band A, B or C.

Measures installed at E, F or G social housing

16. β€”(1) A measure meets the condition in this article if the measureβ€”

(a) is installed at social housing to which paragraph (2) or (3) applies; and

(b) isβ€”

(i) installed to improve the insulating properties of the premises;

(ii) a demonstration action;

(iii) an innovation measure; or

(iv) a first time heating system ... .

(2) This paragraph applies to social housing if a post-installation EPC expresses the energy performance rating of the social housing as band E, F or G.

(3) This paragraph applies to social housing ifβ€”

(a) a pre-installation EPC expresses the energy performance rating of the social housing as band E, F or G; and

(b) the social landlord in respect of the social housing has confirmed in writing that, to the best of its knowledge and belief, no changes were made to the social housing, after the pre-installation EPC was issued and before the measure was installed, which would increase the energy performance rating of the social housing to band A, B, C or D.

(4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Measures accompanied by a statement from a local authority

17. β€”(1) A measure meets the condition in this article ifβ€”

(a) the measure is installed at owner-occupied premises;

(b) a local authority has been consulted on the installation of a qualifying action at the premises; and

(c) that local authority has, on or after publication on its website of a statement of intent made in respect of the local authorityβ€”

(i) made a statement in writing that, in the opinion of the local authority, the premises are occupied by a household living on a low income in a home which cannot be kept warm at a reasonable cost; or

(ii) made a statement in writing that, in the opinion of the local authority, the premises are occupied by a household living on a low income and vulnerable to the effects of living in a cold home.

(2) A measure also meets the condition in this article ifβ€”

(a) the measure is installed at A to E private rented premises;

(b) paragraphs (1)(b) and (c) apply in respect of the premises; and

(c) the measure is not the replacement or repair of a boiler, electric storage heater or central heating system that has broken down.

(3) A measure also meets the condition in this article ifβ€”

(a) the measure is installed at F, G or unrated private rented premises;

(b) paragraphs (1)(b) and (c) apply in respect of the premises; and

(c) the measure isβ€”

(i) solid wall insulation; ...

(ii) a renewable heating measure; or

(iii) a first time heating system.

(4) A measure also meets the condition in this article ifβ€”

(a) it is solid wall insulation installed at private domestic premises;

(b) a local authority has been consulted on the installation of the solid wall insulation at the premises;

(c) that local authority has, on or after publication on its website of a statement of intent made in respect of the local authority, created a list of premises whichβ€”

(i) includes the premises at which the measure is installed;

(ii) identifies any premises in the list which in the opinion of the local authority are occupied by a household living on a low income in a home which cannot be kept warm at a reasonable cost; and

(iii) identifies any other premises in the list which in the opinion of the local authority are occupied by a household living on a low income and vulnerable to the effects of living in a cold home; and

(d) the local authority has made a statement in writing thatβ€”

(i) to the best of the local authority's knowledge and belief, all of the premises included in the list referred to in sub-paragraph (c) are private domestic premises;

(ii) all of the premises included in that list are located in the same building, in immediately adjacent buildings or in the same terrace; and

(iii) in the opinion of the local authority, at least 50% of the premises included in that list are occupied by householdsβ€”

(aa) living on a low income in a home which cannot be kept warm at a reasonable cost; or

(bb) living on a low income and vulnerable to the effects of living in a cold home.

(5) In this article, β€œ statement of intent ” meansβ€”

(a) a description of how a local authority intends to identify households that may benefit from a qualifying action and are livingβ€”

(i) on a low income in a home which cannot be kept warm at a reasonable cost; or

(ii) on a low income and are vulnerable to the effects of living in a cold home; or

(b) a statement of intent within the meaning of article 16A of the 2014 Order.

Installation standards, warranties and consumer protection

18.β€”(1) Where the installation of a measure is completed before 1st July 2021, that measure meets the requirements of this article ifβ€”

(a) the measure is installed in accordance with paragraph (2);

(b) subject to paragraph (3)β€”

(i) the measure is installed by, or under the responsibility of, a person who is registered with TrustMark for the purposes of that measure; and

(ii) a certificate of lodgement is issued by the operator of TrustMark in respect of the measure;

(c) in the case of the installation of a district heating connection, the measure meets one of the conditions in paragraph (4);

(d) in the case of the installation of a boilerβ€”

(i) in the case of a repair, the measure is accompanied by a warranty for at least two years;

(ii) in any other case, the measure is accompanied by a warranty that meets the requirements set out in Schedule 3; and

(e) in the case of the installation of an electric storage heater, the measure is accompanied by a warranty for at least two years.

(2) A measure is installed in accordance with this paragraph if the measureβ€”

(a) is referred to in PAS 2030:2017 and is installed in accordance with PAS 2030:2017 by, or under the responsibility of, a PAS 2030:2017 certified installer;

(b) is referred to in PAS 2030:2019 and is installed in accordance with PAS 2030:2019 and PAS 2035:2019 by, or under the responsibility of, a PAS 2030:2019 certified installer;

(c) is not referred to in PAS 2030:2017 and is installed by a person of appropriate skill and experience; or

(d) is not referred to in PAS 2030:2019 and is installed by a person of appropriate skill and experience.

(3) Paragraph (1)(b) does not apply where the measureβ€”

(a) is a demonstration action;

(b) is a district heating connection which falls within paragraph (4)(a) or (b); or

(c) is subject to arrangements for quality assurance and consumer protection, including arrangements for repairs and other remedies, which are equivalent to the requirements under TrustMark.

(4) The installation of a district heating connection meets one of the conditions in this paragraph ifβ€”

(a) it is a connection to a district heating system registered with the Heat Trust Scheme;

(b) it is subject to arrangements for consumer protection which are equivalent to the requirements under the Heat Trust Scheme; or

(c) it includes the installation of a ground source heat pump at the domestic premises.

(5) Where the installation of a measure is completed on or after 1st July 2021, that measure meets the requirements of this article ifβ€”

(a) in the case of a measure whichβ€”

(i) is a demonstration action;

(ii) is a district heating connection which falls within paragraph (4)(a) or (b); or

(iii) is subject to arrangements for quality assurance and consumer protection, including arrangements for repairs and other remedies, which are equivalent to the requirements under TrustMark,

the measure is installed in accordance with paragraph (6);

(b) in the case of a measure which does not fall within sub-paragraph (a)(i) to (iii)β€”

(i) the measure is installed by, or under the responsibility of, a person who is registered with TrustMark for the purposes of that measure; and

(ii) a certificate of lodgement is issued by the operator of TrustMark in respect of the measure;

(c) in the case of the installation of a district heating connection, the measure meets one of the conditions in paragraph (4); and

(d) in the case of the installation of a boiler which is not a repair, the measure is accompanied by a warranty that meets the requirements set out in Schedule 3.

(6) A measure is installed in accordance with this paragraph if the measureβ€”

(a) is referred to in PAS 2030:2019 and is installed in accordance with PAS 2030:2019 and PAS 2035:2019 by, or under the responsibility of, a PAS 2030:2019 certified installer; or

(b) is not referred to in PAS 2030:2019 and is installed by a person of appropriate skill and experience.

(7) In this articleβ€”

β€œcertificate of lodgement” means a document entitled β€œTrustMark Certificate of Lodgement” which sets out the address at which a measure has been installed and the type of measure;

β€œground source heat pump” means equipment which generates heatβ€”

(a)

using the heat energy provided by a shared ground loop; or

(b)

by absorbing energy stored in the form of heat in the ground, including water in the ground, or in surface water;

β€œHeat Trust Scheme” means the scheme operated by Heat Customer Protection Ltd, a company registered in England and Wales with company number 09456667;

β€œPAS 2030:2017” means Publicly Available Specification 2030:2017 ;

β€œPAS 2030:2017 certified installer” means, in relation to a measure, a person who is certified, by a certification body or organisation accredited to EN ISO/IEC 17065:2012, as compliant with those parts of PAS 2030:2017 that apply to the measure;

β€œshared ground loop” means equipment whichβ€”

(a)

absorbs energy stored in the form of heat in the ground, including water in the ground, or in surface water; and

(b)

provides heat energy through a hydraulic connection to two or more ground source heat pumps;

β€œTrustMark” means the scheme of that name operated by TrustMark (2005) Limited, a company registered in England and Wales with company number 05480144.

Additional requirements to be met by heating measures

19. β€”(1) A measure meets the requirements of this article if the measureβ€”

(a) is not the installation of equipment for the generation of heat wholly or partly from coal;

(b) is not the installation of equipment for the generation of heat wholly or partly from oil, unless the measure isβ€”

(i) a repair; or

(ii) installed at domestic premises which immediately prior to the installation of the measure have a central heating system or district heating connection that in either case has broken down and cannot be economically repaired;

(c) is not the installation of a connection to a district heating system that delivers heat generated wholly or partly from coal or oil;

(ca) is not the installation of a first time heating system at uninsulated premises;

(d) except in the case of the installation of a ground source heat pump, is not the installation of equipment that is, or has been at any timeβ€”

(i) an accredited domestic plant within the meaning of the Domestic Renewable Heat Incentive Scheme Regulations 2014 ; or

(ii) an accredited RHI installation within the meaning of the Renewable Heat Incentive Scheme Regulations 2018 ;

(e) is not the installation of a ground source heat pump generating heat in respect of which a participant, or a connected person, is, or has been at any time, entitled toβ€”

(i) RHI payments, within the meaning of regulation 26 of the Domestic Renewable Heat Incentive Scheme Regulations 2014; or

(ii) periodic support payments within the meaning of regulation 3 of the Renewable Heat Incentive Scheme Regulations 2018;

(f) in the case of a measure installed at domestic premises which immediately prior to the installation of the measure have an efficient repairable heating system, isβ€”

(i) a district heating connection;

(ii) the installation of heating controls;

(iii) a demonstration action;

(iv) an innovation measure;

(v) a renewable heating measure; or

(vi) a repair; and

(g) in the case of a measure installed at domestic premises which immediately prior to the installation of the measure have an inefficient repairable heating system, isβ€”

(i) a first time heating system;

(ii) a secondary heating measure;

(iii) a district heating connection;

(iv) the installation of heating controls;

(v) a demonstration action;

(vi) an innovation measure;

(vii) a renewable heating measure; or

(viii) a repair.

(2) In this articleβ€”

β€œ connected person ” means, in relation to a participant, a person connected with the participant within the meaning of section 1122 of the Corporation Tax Act 2010 ;

β€œ efficient repairable heating system ” meansβ€”

(a)

an efficient repairable electric storage heater; or

(b)

a central heating system or district heating connection whichβ€”

(i)

is not broken down or, if it is broken down, can be economically repaired; and

(ii)

is not an inefficient repairable heating system;

β€œ electric heating system ” means a central heating system or district heating connection which provides heat generated wholly or mainly from electricity;

β€œ ground source heat pump ” has the same meaning as in article 18;

β€œ inefficient repairable heating system ” means a central heating system, district heating connection or electric storage heater whichβ€”

(a)

is not broken down or, if it is broken down, can be economically repaired;

(b)

in the case of a central heating system other than an electric heating systemβ€”

(i)

includes a non-condensing boiler; or

(ii)

has a peak energy efficiency that is no better than a central heating system falling within sub-paragraph (i);

(c)

in the case of a district heating connection other than an electric heating system, is a connection to a district heating system thatβ€”

(i)

includes a non-condensing boiler; or

(ii)

has a peak energy efficiency that is no better than a central heating system falling within paragraph (b)(i); and

(d)

in the case of an electric heating system or an electric storage heater, has a responsiveness rating equal to or less than 0.2 when assessed against the Standard Assessment Procedure;

β€œ peak energy efficiency ” means the maximum efficiency at which a central heating system or district heating system, as the case may be, is designed to produce heat.

β€œ room-in-roof ” means, in relation to insulation, insulation of the ceiling and walls of a room in the roof space of a building;

β€œ uninsulated premises ” means premises other than a mobile homeβ€”

(a)

which include the top floor of the building in which they are located and whichβ€”

(i)

do not have flat roof, loft, rafter or room-in-roof insulation; and

(ii)

are premises at which flat roof, loft, rafter or room-in-roof insulation can be installed; or

(b)

which have exterior facing cavity walls whichβ€”

(i)

can be insulated; and

(ii)

are not insulated.

PART 5 Applications for demonstration actions, innovation measures, monitored measures and surplus actions

Demonstration actions

20. β€”(1) A participant may apply to the Administrator in writing for the installation of a measure at two or more domestic premises to be approved as a demonstration action.

(2) An application under paragraph (1) must includeβ€”

(a) the following informationβ€”

(i) an explanation of how the measure is expected to achieve cost savings;

(ii) the estimated amount of cost savings expected;

(iii) the arrangements for monitoring whether the measure achieves cost savings;

(iv) the arrangements for assessing the effectiveness of the measure at achieving cost savings;

(v) the arrangements for ensuring the safety of the measure, for repairing or removing any measure that is faulty and for preventing or remedying any adverse impacts caused by the measure on the domestic premises at which it is installed;

(vi) the number of domestic premises at which the participant intends to promote the installation of the measure, and an explanation of how that number was determined;

(vii) the estimated cost in pounds sterling to be incurred by the participant in respect of the matters described in paragraphs (iii) to (vi); and

(viii) such other information relating to the measure as the Administrator may require; and

(b) consent to the publication of information, other than personal data, provided by the participant to the Administrator in relation to the promotion, monitoring and assessment of the measure.

(3) An application under paragraph (1) must be made before the installation of the measure to which the application relates.

(4) The Administrator must not approve the application unless it is satisfied thatβ€”

(a) the measure to which the application relates is reasonably expected to result in a reduction in the cost of heating domestic premises;

(b) the estimates provided under paragraph (2)(a)(ii) and (vii) are reasonable, and having regard to those estimates, the measure is reasonably expected to provide value for money;

(c) the arrangements described under paragraph (2)(a)(iii) to (v) are reasonable;

(d) the number of domestic premises at which the participant intends to promote the installation of the measure is no more than is necessary in order to demonstrate the effectiveness of the measure at achieving cost savings;

(e) the measure is notβ€”

(i) the installation of equipment for the generation of heat wholly or partly from oil;

(ii) the installation of equipment for the generation of heat wholly from a non-renewable source; or

(iii) a repair;

(f) the measure is at technology readiness level 8 (system complete and qualified) or technology readiness level 9 (actual system proven in operational environment); and

(g) the measure is materially different from the measures promoted by licence-holders to meet their obligations under previous energy efficiency schemes and from any measures notified under article 24 before the date on which the application was made.

(5) A demonstration action is the installation of a measure at two or more domestic premises which is the subject of an application under paragraph (1) which has been approved by the Administrator.

(6) For the purposes of this articleβ€”

(a) a measure is not materially different from another measure merely because it is installed at different domestic premises; and

(b) when considering whether a measure is materially different from another measure, the Administrator may have regard to such matters as it thinks fit, including to any one or more of the followingβ€”

(i) the production method;

(ii) the installation method;

(iii) the materials used;

(iv) the technology used;

(v) the expected costs of promoting the measure;

(vi) the expected cost savings or other benefits of the measure.

(7) In this articleβ€”

β€œ personal data ” has the same meaning as in section 3 of the Data Protection Act 2018 ;

β€œtechnology readiness level” followed by a number has the same meaning as β€œTRL” followed by that number in General Annex G to the Horizon 2020 Work Programme 2018-2020 adopted by Commission Decision C(2017)7124 of 27th October 2017 .

Innovation measures

21. β€”(1) A participant may apply to the Administrator in writing for a measure which the participant intends to promote to be approved as an innovation measure.

(2) An application under paragraph (1) must include the following informationβ€”

(a) a description of the characteristics of the measure (β€œthe innovation measure description”);

(b) an explanation of how the measure isβ€”

(i) an improvement on the measures that would otherwise be promoted by the participant; or

(ii) an improvement on the measures promoted by licence-holders to meet their obligations under previous energy efficiency schemes; and

(c) such other information relating to the measure as the Administrator may require.

(3) The Administrator must not approve the application unless it is satisfied thatβ€”

(a) the measure to which the application relates is capable of resulting in a reduction in the cost of heating domestic premises;

(b) the innovation measure description is accurate and contains sufficient detail to distinguish the measure from other measures that are materially different;

(c) the explanation provided under paragraph (2)(b) is reasonable;

(d) the measure is notβ€”

(i) a district heating connection;

(ii) the installation of equipment for the generation of heat wholly or partly from oil;

(iii) the installation of equipment for the generation of heat wholly from a non-renewable source; or

(iv) a repair; and

(e) the measure is materially different fromβ€”

(i) the measures promoted by licence-holders to meet their obligations under previous energy efficiency schemes; and

(ii) any measures, other than innovation measures, notified under article 24 before the date of the application under paragraph (1).

(4) If the Administrator approves the application it must publish on its websiteβ€”

(a) the innovation measure description; and

(b) the date on which the application was approved.

(5) An innovation measure is a measure whichβ€”

(a) is completed after the date on which an application under paragraph (1) is approved by the Administrator; and

(b) falls within the innovation measure description published by the Administrator in respect of that application.

(6) For the purposes of this article, article 20(6) applies as it applies for the purposes of that article.

Monitored measures

22. β€”(1) A participant may apply to the Administrator in writing for the installation of a measure at domestic premises to be approved as a monitored measure.

(2) An application under paragraph (1) must includeβ€”

(a) the following informationβ€”

(i) the arrangements for monitoring the cost savings achieved by the measure at the premises where it is installed;

(ii) reasons why the arrangements in paragraph (i) are likely to improve the information available about the cost savings achieved by the measure;

(iii) a methodology, based on the performance of the measure at the premises where it is installed, for calculating the cost savings achieved by the measure at those premises; and

(iv) such other information relating to the measure as the Administrator may require; and

(b) consent to the publication of information provided by the participant to the Administrator in relation to the methodology for calculating the cost savings achieved by the measure.

(3) An application under paragraph (1) must be made before the installation of the measure to which the application relates.

(4) The Administrator must not approve the application unless it is satisfied thatβ€”

(a) the measure to which the application relates is capable of resulting in a reduction in the cost of heating domestic premises;

(b) the arrangements described under paragraph (2)(a)(i) are reasonable, and are likely to improve the information available about the cost savings achieved by the measure;

(c) the methodology provided under paragraph (2)(a)(iii) is reasonable; and

(d) the measure is notβ€”

(i) a district heating connection;

(ii) the installation of equipment for the generation of heat wholly or partly from oil; or

(iii) a repair.

(5) A monitored measure is a measure which is the subject of an application under paragraph (1) which has been approved by the Administrator.

Surplus actions

23. β€”(1) On or before 30th November 2019 a relevant supplier may apply to the Administrator in writing for a measure to be recognised as a surplus action.

(2) An application under paragraph (1) must give details of the measure which the applicant considers constitutes a surplus action.

(3) A surplus action is a measure whichβ€”

(a) is an ECO2 carbon qualifying action or an ECO2 heating qualifying action which was achieved by the applicant;

(b) is not required by the applicant to meet any obligations under the 2014 Order or, by virtue of article 16(6) to (7A) of the 2014 Order, cannot be used by the applicant to meet any obligations under the 2014 Order;

(c) was completed on or after 1st April 2017; and

(d) is not the installation of equipment for the generation of heat wholly or partly from coal.

(4) The Administrator must recognise a measure as a surplus action if, following an application under paragraph (1), the Administrator is satisfied thatβ€”

(a) the measure to which the application relates is a surplus action; and

(b) in the case of an ECO2 carbon qualifying action, recognition of the measure as a surplus action would not cause the total carbon saving attributable to all of the ECO2 carbon qualifying actions achieved by the applicant and recognised by the Administrator as surplus actions to exceed 20% of the applicant's ECO2 CERO target.

(5) For the purposes of paragraph (4)(b), the carbon saving attributable to an ECO2 carbon qualifying action is the carbon saving attributed to it by the Administrator in accordance with article 25 of the 2014 Order.

(6) In this articleβ€”

β€œ ECO2 carbon qualifying action ” means a carbon qualifying action within the meaning of article 12(3) of the 2014 Order and which was notified to the Administrator in accordance with article 17 of the 2014 Order;

β€œ ECO2 CERO target ” means, in relation to an applicant, the applicant's total carbon emissions reduction obligation within the meaning of the 2014 Order;

β€œ ECO2 heating qualifying action ” means a heating qualifying action within the meaning of article 16(3) of the 2014 Order and which was notified to the Administrator in accordance with article 17 of the 2014 Order.

PART 6 Notification of completed measures

Notification requirements for completed measures

24. β€”(1) A measure is notified to the Administrator in accordance with this article if the notificationβ€”

(a) is made, in writing, by the participant that promoted the measure;

(b) includes a calculation of the score for the measure;

(c) if the measure is a demonstration action, includesβ€”

(i) the total cost in pounds sterling incurred by the participant in promoting and monitoring the demonstration action (β€œthe actual cost”);

(ii) a breakdown of the actual cost;

(iii) the information obtained by the participant as to whether the demonstration action achieved cost savings; and

(iv) an assessment of the effectiveness of the demonstration action at achieving cost savings;

(d) includes such other information relating to the measure as the Administrator may require;

(e) is made after the measure is completed; and

(f) is made on time within the meaning of article 25.

(2) The Administrator must publish, on its website, a summary of the information provided by a participant in respect of a demonstration action under paragraph (1)(c).

(3) For the purposes of this Order, a measure is completedβ€”

(a) in the case of a demonstration action, when the planned monitoring of the demonstration action is completed;

(b) in any other case, when the installation of the measure is completed.

(4) In this article, β€œ planned monitoring ” means the arrangements for monitoring whether a demonstration action achieves cost savingsβ€”

(a) as described in the application for approval of the demonstration action in accordance with article 20(2)(a)(iii); or

(b) as otherwise agreed, in writing, by the Administrator.

Deadline for notification of completed measures

25. β€”(1) For the purposes of article 24, a notification of a measure is made on time if it is madeβ€”

(a) before the original deadline, which isβ€”

(i) in the case of a measure completed before the commencement date, the end of the second month immediately following the month in which this Order comes into force;

(ii) in the case of a measure completed on or after the commencement date, the end of the first month immediately following the month in which the measure was completed;

(b) following an application under paragraph (4) which has been accepted by the Administrator, on or before the date specified by the Administrator under paragraph (6); or

(c) in the case of a measure falling within the 5% notification threshold for the participant (β€œthe notifying participant”), before the earlier ofβ€”

(i) the end of the fourth month after the month in which the measure was completed; and

(ii) the end of June 2022.

(2) For the purposes of paragraph (1)(c), a measure falls within the 5% notification threshold for the notifying participant ifβ€”

(a) the measure is notified to the Administrator after the original deadline; and

(b) at the time the measure is notified, the result of the following formula is less than or equal to 0.05β€”

(3) In paragraph (2)β€”

(4) A participant may apply at any time to the Administrator in writing for a measure to be notified after the original deadline.

(5) An application under paragraph (4) must includeβ€”

(a) details of why the participant is seeking an extension of time to notify the measure; and

(b) such other information relating to the measure as the Administrator may require.

(6) Following receipt of an application under paragraph (4), the Administrator mustβ€”

(a) accept the application and specify a date, as it thinks fit but falling after the original deadline, for the notification of the measure; or

(b) reject the application.

(7) In this article, β€œ original deadline ” has the meaning given in paragraph (1)(a).

PART 7 Scores

Attributing the score to a qualifying action

26. β€”(1) To determine whether a participant has achieved its total home-heating cost reduction obligation, the Administrator must attribute a score to each qualifying action.

(2) In the case of a qualifying action notified by a participant under article 24β€”

(a) where the Administrator is satisfied that the score notified by the participant under that article is correctly calculated, the Administrator must attribute that score to the qualifying action; or

(b) where the Administrator is not satisfied that the score notified by the participant under that article is correctly calculated, the Administrator must attribute the score which the Administrator considers would have been determined for the action had it been correctly calculated.

(3) In the case of a qualifying action that is a surplus action, the Administrator must attribute the score which is determined by the Administrator in accordance with article 31.

(4) The Administrator must notify in writingβ€”

(a) a participant of the score it has attributed to a qualifying action notified by the participant under article 24; and

(b) a relevant supplier of the score it has attributed to a surplus action which was the subject of an application by the relevant supplier under article 23.

The score for district heating connections

27. β€”(1) This article applies for the purpose of calculating the score of a qualifying action whichβ€”

(a) is a district heating connection; and

(b) is not a demonstration action or a surplus action.

(2) Where this article applies, the score is calculated by determining the cost savings for the qualifying action in accordance with the following formulaeβ€”

(a) in the case of a qualifying action which meets the conditions in paragraph (2A)β€”

(b) in all other casesβ€”

(2A) A qualifying action meets the conditions in this paragraph if the qualifying action is a measure whichβ€”

(a) is referred to in PAS 2030:2019;

(b) is installed in accordance with PAS 2030:2019 and PAS 2035:2019 by, or under the responsibility of, a PAS 2030:2019 certified installer; and

(c) is completed before 1st July 2021.

(3) In paragraph (2)β€”

(4) For the purposes of determining the cost savings achieved by a district heating connection (β€œthe proposed connection”), a participant may apply to the Administrator in writing for approval of a methodology other than the Standard Assessment Procedure or the Reduced Data Standard Assessment Procedure (β€œan alternative methodology”).

(5) An application under paragraph (4) must be madeβ€”

(a) in the case of a district heating connection installed before the commencement date, before the measure is notified to the Administrator under article 24;

(b) in any other case, before the proposed connection is installed.

(6) The Administrator may approve an alternative methodology ifβ€”

(a) it is satisfied thatβ€”

(i) neither the Standard Assessment Procedure nor the Reduced Data Standard Assessment Procedure contain an appropriate methodology for determining the cost savings achieved by the proposed connection; and

(ii) the alternative methodology is an appropriate methodology for determining the cost savings achieved by the proposed connection; or

(b) the alternative methodology is published by, or on behalf of, the Secretary of State as a replacement for the Standard Assessment Procedure or the Reduced Data Standard Assessment Procedure.

The score for demonstration actions

28. β€”(1) This article applies for the purpose of calculating the score of a qualifying action which is a demonstration action.

(2) The score of a demonstration action is calculated in accordance with the following formulaeβ€”

(a) in the case of a qualifying action which meets the conditions in paragraph (2A)β€”

(b) in all other casesβ€”

(2A) A qualifying action meets the conditions in this paragraph if the qualifying action is a measureβ€”

(a) which is referred to in PAS 2030:2019;

(b) which is installed in accordance with PAS 2030:2019 and PAS 2035:2019 by, or under the responsibility of, a PAS 2030:2019 certified installer; and

(c) in respect of which installation is completed before 1st July 2021.

(3) In paragraph (2), β€œM” is the lower ofβ€”

(a) the actual cost as stated in the notification of the demonstration action in accordance with article 24(1)(c)(i); and

(b) the estimated cost as stated in the application for approval of the demonstration action in accordance with article 20(2)(a)(vii).

The score for innovation measures

29. β€”(1) This article applies for the purpose of calculating the score of a qualifying action whichβ€”

(a) is an innovation measure; and

(b) is not a demonstration action or a monitored measure.

(2) Where this article applies, the score is calculated in accordance with the following formulaβ€”

(3) In paragraph (2)β€”

(4) A participant may apply for a qualifying action which is an innovation measure promoted by the participantβ€”

(a) to be designated as an excess innovation measure for the purposes of this article and article 12; or

(b) if it is already designated as an excess innovation measure for those purposes, to be no longer so designated.

(5) An application under paragraph (4) mustβ€”

(a) be made to the Administrator, in writing, by no later than 30th June 2022; and

(b) include such information relating to the qualifying action as the Administrator may require.

(6) The Administrator must approve an application if it is satisfied that the application is made in accordance with paragraphs (4) and (5).

(7) If the Administrator approves an applicationβ€”

(a) made under paragraph (4)(a), the qualifying action is designated as an excess innovation measure for the purposes of this article and article 12;

(b) made under paragraph (4)(b), the qualifying action ceases to be designated as an excess innovation measure for the purposes of this article and article 12.

The score for monitored measures

30. β€”(1) This article applies for the purpose of calculating the score of a qualifying action whichβ€”

(a) is a monitored measure; and

(b) is not a demonstration action.

(2) Where this article applies, the score is the greater ofβ€”

(a) the score for the qualifying action calculated in accordance with article 32(2); and

(b) eitherβ€”

(i) the score for the qualifying action calculated in accordance with the methodology stated in the application for approval of the monitored measure in accordance with article 22(2)(a)(iii); or

(ii) if the conditions in paragraph (2A) are met, the score under paragraph (i) multiplied by 1.2.

(2A) The conditions in this paragraph are met if the qualifying action is a measure whichβ€”

(a) is referred to in PAS 2030:2019;

(b) is installed in accordance with PAS 2030:2019 and PAS 2035:2019 by, or under the responsibility of, a PAS 2030:2019 certified installer; and

(c) is completed before 1st July 2021.

(3) Where the score for the qualifying action is the score under paragraph (2)(b), the Administrator must publish, on its website, a summary of the methodology referred to in that paragraph.

The score for surplus actions

31. β€”(1) This article applies for the purpose of determining the score of a qualifying action which is a surplus action.

(2) Where a cost score was attributed to the surplus action by the Administrator under article 25 of the 2014 Order, the score is the cost score so attributed.

(3) Where a cost score was not attributed to the surplus action under article 25 of the 2014 Order, the score is the cost score calculated in accordance with articles 19 and 23 of the 2014 Order.

(4) In this article, β€œ cost score ” has the meaning given in article 2 of the 2014 Order.

The score for all other qualifying actions

32. β€”(1) This article applies for the purpose of calculating the score of a qualifying action which is notβ€”

(a) a district heating connection;

(b) a demonstration action;

(c) an innovation measure;

(d) a monitored measure; or

(e) a surplus action.

(2) Where this article applies, the score is calculated by determining the cost savings for the qualifying action in accordance with the following formulaeβ€”

(a) in the case of a qualifying action which meets the conditions in paragraph (2A)β€”

(b) in all other casesβ€”

(2A) A qualifying action meets the conditions in this paragraph if the qualifying action is a measure whichβ€”

(a) is referred to in PAS 2030:2019;

(b) is installed in accordance with PAS 2030:2019 and PAS 2035:2019 by, or under the responsibility of, a PAS 2030:2019 certified installer; and

(c) is completed before 1st July 2021.

(3) In paragraph (2)β€”

(4) In this articleβ€”

β€œ broken boiler ” means a boiler that has broken down and cannot be economically repaired;

β€œ broken electric storage heater ” means an electric storage heater that has broken down and cannot be economically repaired;

β€œ non-gas fuelled premises ” means domestic premises where, both before and after the installation of the qualifying actionβ€”

(a)

the main space heating system for the premises is not fuelled by mains gas; and

(b)

the premises are not connected to a district heating system.

Publication of a cost savings methodology

33. β€”(1) The Administrator must publish, on its website, a methodology for the purpose of calculating the cost savings of a qualifying action under article 32.

(2) Under the methodology published by the Administrator the calculation of the cost savings must be based onβ€”

(a) in the case of a qualifying action which is the repair of a boiler or electric storage heater, an expected lifetime for the qualifying action of 2 years;

(b) in the case of a qualifying action which is the replacement of a broken boiler with another boiler, an expected lifetime for the qualifying action of 3 years;

(c) in the case of a qualifying action which is the replacement of a broken electric storage heater with another electric storage heater, an expected lifetime for the qualifying action of 5 years;

(d) in the case of a qualifying action which is the installation of cavity wall insulation and which is accompanied by an appropriate warranty, an expected lifetime for the qualifying action of 42 years;

(e) in the case of a qualifying action which is the installation of insulation applied to the floor, walls and ceiling of a mobile home and which is accompanied by an appropriate warranty, an expected lifetime for the qualifying action of 30 years;

(f) in the case of a qualifying action which is the installation of solid wall insulation and which is accompanied by an appropriate warranty, an expected lifetime for the qualifying action of 36 years; ...

(fa) in the case of a qualifying action which is the installation of room-in-roof insulation and which, if completed on or after 1st July 2020, is accompanied by an appropriate warranty, an expected lifetime for the qualifying action of 42 years;

(fb) in the case of a qualifying action which is the installation of underfloor insulation and which, if completed on or after 1st July 2020, is accompanied by an appropriate warranty, an expected lifetime for the qualifying action of 42 years;

(fc) in the case of a qualifying action which is a first time heating system other than the installation of a district heating connection, an expected lifetime for the qualifying action of 20 years; and

(g) in the case of any other qualifying action, an expected lifetime for the qualifying action that is specified in, or determined in accordance with, the methodology.

(3) Before publishing a methodology under this article, the Administrator must have regard toβ€”

(a) the Standard Assessment Procedure and the Reduced Data Standard Assessment Procedure, or to any methodology published by, or on behalf of, the Secretary of State as a replacement for the Standard Assessment Procedure or the Reduced Data Standard Assessment Procedure; and

(b) the desirability of the methodology being easy to use.

(4) In this articleβ€”

β€œ appropriate warranty ” means a warranty which the Administrator is satisfiedβ€”

(a)

is supported by a mechanism that gives assurance thatβ€”

(i)

funds will be available to honour the warranty; and

(ii)

the installation of the insulation and products used in the insulation comply with a quality assurance framework;

(b)

is for 25 years or more; and

(c)

provides for repair, or replacement where appropriate, of the insulation, covering the cost of remedial and replacement works and materials;

β€œ broken boiler ” and β€œ broken electric storage heater ” have the same meaning as in article 32;

β€œ room-in-roof ” in relation to insulation has the same meaning as in article 19;

β€œ underfloor insulation ” means insulation of all or part of the floor of a room in a building, where that floor, or that part of the floor, is not situated above a habitable room.

PART 8 Transfers

Transfers of qualifying actions

34. β€”(1) A relevant supplier may apply to the Administrator with another relevant supplier for one or more qualifying actions promoted by the relevant supplier (β€œA”) to be treated as promoted by the other relevant supplier (β€œB”) (β€œa proposed transfer”).

(2) An application under paragraph (1) mustβ€”

(a) be made by A and B, in writing, on or before 30th June 2022; and

(b) include such information relating to the proposed transfer as the Administrator may require.

(3) The Administrator must not approve the application ifβ€”

(a) the application is made in respect of an in-fill measure or a primary action with which an in-fill measure is linked, unless the application is made in respect of the in-fill measure and all of the primary actions with which the in-fill measure is linked; or

(b) the application is made in respect of a secondary heating measure or a measure that is a related primary measure for a secondary heating measure, unless the application is made in respect of the secondary heating measure and its related primary measure.

(4) In paragraph (3)β€”

(a) β€œ in-fill measure ” and β€œ primary actions ” have the same meaning as in article 14(4); and

(b) β€œ related primary measure ” has the meaning given in the definition of β€œsecondary heating measure” in article 2.

(5) If the Administrator decides not to approve the application it must notify A and B in writing of the reasons for that decision.

(6) If the Administrator approves the applicationβ€”

(a) the qualifying actions in respect of which the application was made are treated as promoted by B and not A; and

(b) the Administrator must notify A and B in writing of the date on which the application was approved.

Transfer of obligations

35. β€”(1) A participant may apply to the Administrator with another participant for all or part of its total home-heating cost reduction obligation or total solid wall minimum requirement to be transferred from the participant (β€œA”) to the other participant (β€œB”) (β€œa proposed transfer”).

(2) An application under paragraph (1) mustβ€”

(a) be made by A and B, in writing, on or before 30th September 2021;

(b) state in respect of which one of the following the application is being made (β€œthe relevant obligation”)β€”

(i) a total home-heating cost reduction obligation; or

(ii) a total solid wall minimum requirement;

(c) state the amount of its relevant obligation that A intends to transfer to B (β€œthe proposed transfer amount”); and

(d) include such other information relating to the proposed transfer as the Administrator may require.

(3) The Administrator must not approve the application ifβ€”

(a) the proposed transfer amount exceeds A's relevant obligation;

(b) approval of the application would result in A or B's total solid wall minimum requirement being greater than its total home-heating cost reduction obligation;

(c) having regard to section 30O of the Gas Act 1986 and section 27O of the Electricity Act 1989 (maximum amount of penalty or compensation), the Administrator considers that, if the application were approved, there is a significant risk that it would adversely affect the Administrator's ability to enforce the requirements placed on B under this Order; or

(d) where A and B are not members of the same group, the Administrator considers that, if the application were approved, there is a significant risk that B will be unable to achieve its total home-heating cost reduction obligation or total solid wall minimum requirement.

(4) If the Administrator decides not to approve the application it must in writingβ€”

(a) notify A of any reasons for that decision relating to A; and

(b) notify B of any reasons for that decision relating to B.

(5) If the Administrator approves the applicationβ€”

(a) A's relevant obligation is treated as reduced by the proposed transfer amount, and the Administrator must notify A in writing of its reduced relevant obligation; and

(b) B's relevant obligation is treated as increased by the proposed transfer amount, and the Administrator must notify B in writing of its increased relevant obligation.

PART 9 Information and enforcement

Final determination and reporting

36. β€”(1) The Administrator must determine whether a participant has achieved its total home-heating cost reduction obligation.

(2) The Administrator must notify the participant in writing of its determination under paragraph (1) by no later than 30th September 2022.

(3) The Administrator must submit to the Secretary of State a report each month setting out the progress which participants have made towards achieving their total home-heating cost reduction obligation.

(4) The first report under paragraph (3) is to be submitted in the month following the month in which the commencement date occurs.

(5) The final report under paragraph (3) is to be submitted in April 2022.

(6) Not later than 30th September 2022 the Administrator must submit to the Secretary of State a report setting out whether participants achieved the overall home-heating cost reduction target.

Information from participants

37. The Administrator may require a participantβ€”

(a) to provide it with such information, or information of such nature, as it may specifyβ€”

(i) about the participant's proposals for complying with any requirement under this Order; or

(ii) relating to the cost to the participant of achieving its total home-heating cost reduction obligation; and

(b) to produce to it evidence, of such kind as it may specify, demonstrating that the participant is complying with, or has complied with, any requirement under this Order.

Publication of energy savings achieved by participants and provision of information to the Secretary of State by participants

38. β€”(1) At least once in each reporting year the Secretary of State must publish, on a website maintained by or on behalf of the Secretary of State, the energy savings achievedβ€”

(a) by each participant by qualifying actions whichβ€”

(i) have been promoted by the participant; and

(ii) are not surplus actions; and

(b) by all qualifying actions other than surplus actions.

(2) No more than once each reporting year, the Secretary of State may require a participant to provide to the Secretary of Stateβ€”

(a) aggregated statistical information on its final customers (identifying significant changes to previously submitted information); and

(b) current information on final customers' consumption, including, where applicable, load profiles, customer segmentation and geographical location of customers.

(3) In this articleβ€”

(a) β€œenergy savings” and β€œfinal customer” have the meaning given by Article 2 of the Energy Efficiency Directive;

(b) β€œ aggregated statistical information ”, β€œ customer segmentation ” and β€œ load profiles ” have the same meaning as in the Energy Efficiency Directive;

(c) β€œ the Energy Efficiency Directive ” means Directive 2012/27/EU of the European Parliament and of the Council on energy efficiency ; and

(d) β€œ reporting year ” means 2019, 2020, 2021 and 2022.

Enforcement

39. A requirement placed on a participant under this Order is a relevant requirement for the purpose of Part 1 of the Electricity Act 1989 and Part 1 of the Gas Act 1986.

Claire Perry

Minister of State for Climate Change and Industry

Department for Business, Energy and Industrial Strategy

The Scottish Ministers consent to the making of this Order.

Kevin Stewart

A member of the Scottish Government

Article 2

SCHEDULE 1 Domestic premises which are social housing

1. Domestic premises in England and Wales are β€œsocial housing” if the premises are let below the market rate andβ€”

(a) the relevant interest in those premises is registered as belonging to a social landlord; or

(b) if no relevant interest in the premises has been registered, the premises are let by a social landlord other than under a lease granted pursuant to Part 5 of the Housing Act 1985 .

2. Domestic premises in Scotland are β€œsocial housing” if the premises are let below the market rate andβ€”

(a) the relevant interest in the premises is registered as belonging to a social landlord; or

(b) if no relevant interest in the premises has been registered, the premises are let by a social landlord other than under a lease granted pursuant to sections 61 to 84 of the Housing (Scotland) Act 1987 , as modified by section 84A of that Act .

3. For the purposes of this Scheduleβ€”

(a) in respect of premises in England and Wales, a relevant interest is registered if it is registered in the register of title maintained by Her Majesty's Land Registry; and

(b) in respect of premises in Scotland, a relevant interest is registered if it isβ€”

(i) registered in the Land Register of Scotland; or

(ii) recorded in the Register of Sasines.

4. In this Scheduleβ€”

β€œ relevant interest ” meansβ€”

(a)

in respect of premises in England and Walesβ€”

(i)

the freehold estate, unless the whole of the premises have been let under a registered lease; or

(ii)

the leasehold estate, unless the whole of the premises have been further let under a registered lease; and

(b)

in respect of premises in Scotlandβ€”

(i)

the owner's interest or right, unless the whole of the premises have been let under a registered lease; or

(ii)

the lessee's interest under a lease, unless the whole of the premises have been further let under a registered lease;

β€œ social landlord ” meansβ€”

(a)

in respect of premises in Englandβ€”

(i)

a local housing authority, within the meaning of section 1 of the Housing Act 1985 ;

(ii)

a housing association, within the meaning of section 5 of the Housing Act 1985 ;

(iii)

a housing trust, within the meaning of section 6 of the Housing Act 1985; or

(iv)

a charity, within the meaning of section 1 of the Charities Act 2011 ;

(b)

in respect of premises in Scotland, a person so described in section 165 of the Housing (Scotland) Act 2010 ; and

(c)

in respect of premises in Walesβ€”

(i)

a local housing authority, within the meaning of section 1 of the Housing Act 1985;

(ii)

a housing association, within the meaning of section 5 of the Housing Act 1985;

(iii)

a housing trust, within the meaning of section 6 of the Housing Act 1985;

(iv)

a charity, within the meaning of section 1 of the Charities Act 2011;

(v)

a person listed in section 80(1) of the Housing Act 1985 ; or

(vi)

a body registered as a social landlord under Chapter 1 of Part 1 of the Housing Act 1996 .

Article 14

SCHEDULE 2 Help to heat group eligibility

1. The benefits referred to in the definition of β€œhelp to heat group” in article 14 areβ€”

(a) armed forces independence payment under a scheme established under section 1 of the Armed Forces (Pensions and Compensation) Act 2004 ;

(b) attendance allowance under Part 3 of the 1992 Act ;

(c) carer's allowance under Part 3 of the 1992 Act ;

(d) child benefit under Part 9 of the 1992 Act ;

(e) child tax credit under section 8 of the Tax Credits Act 2002 ;

(f) constant attendance allowance underβ€”

(i) article 14 of the Personal Injuries (Civilians) Scheme 1983 , or

(ii) article 8 of the Naval, Military and Air Forces etc (Disablement and Death) Service Pensions Order 2006 ;

(g) disability living allowance under Part 3 of the 1992 Act ;

(h) guarantee credit (and for this purpose β€œ guarantee credit ” is to be construed in accordance with sections 1 and 2 of the State Pension Credit Act 2002 );

(i) income-related employment and support allowance within the meaning of section 1 of the Welfare Reform Act 2007 ;

(j) income-based jobseeker's allowance within the meaning of section 1 of the Jobseekers Act 1995 ;

(k) income support under Part 7 of the 1992 Act ;

(l) industrial injuries disablement benefit under Part 5 of the 1992 Act ;

(m) personal independence payment under Part 4 of the Welfare Reform Act 2012 ;

(n) severe disablement allowance under Part 3 of the 1992 Act ;

(o) universal credit under Part 1 of the Welfare Reform Act 2012 ;

(p) mobility supplement as defined in section 150(2) of the 1992 Act ;

(q) working tax credit under section 10 of the Tax Credits Act 2002 .

2. The condition as to income in paragraph 3 is specified in relation to child benefit.

3. Where the person claiming child benefit isβ€”

(a) a single claimant, the condition as to income is that the claimant's annual income from all sources does not exceed the amount set out in the first row of the table in the column corresponding to the number of children or qualifying young persons for whom the claimant is responsible;

(b) a member of a couple, the condition as to income is that the couple's combined annual income from all sources does not exceed the amount set out in the second row of the table in the column corresponding to the number of children or qualifying young persons for whom at least one member of the couple is responsible.

Table

Type of claimant Number of children or qualifying young persons
1 2 3 4 or more
Single claimant Β£18,500 Β£23,000 Β£27,500 Β£32,000
Member of a couple Β£25,500 Β£30,000 Β£34,500 Β£39,000

4. For the purposes of paragraph 3, whether a person is responsible for a child or qualifying young person is to be determined in accordance with Part 9 of the 1992 Act .

5. In this Scheduleβ€”

β€œ 1992 Act ” means the Social Security Contributions and Benefits Act 1992 ;

β€œ child ” and β€œ qualifying young person ” have the same meaning as in Part 9 of the 1992 Act ;

β€œ couple ” meansβ€”

(a)

two people who are married to, or civil partners of, each other and are members of the same household; or

(b)

two people who are not married to, or civil partners of, each other but are living together as if they were a married couple or civil partners ;

β€œ single claimant ” means a person who is not a member of a couple.

Article 18

SCHEDULE 3 Requirements for warranties for boiler installations

1. The requirements referred to in article 18(1)(d)(ii) and (5)(d) for a warranty are as follows.

2. Subject to paragraph 3, the warranty must provide for the rectification, without any charge to a consumer, of all problems which affect the functioning of the boiler or the heating system it serves and whichβ€”

(a) relate to its installation or its suitability for the heating system it serves; and

(b) are notified to the person providing the warranty within 2 years of the boiler being installed.

3. The warranty is not required to provide for the rectification of a problem whichβ€”

(a) is covered by a warranty provided by the manufacturer of the boiler; or

(b) arises after the boiler is installed where that problem arises from one or more ofβ€”

(i) negligence of a third party;

(ii) accident caused by a third party;

(iii) misuse of the boiler by a third party;

(iv) repair of the boiler by a third party.

4. In paragraph 3, β€œ third party ” means a person other thanβ€”

(a) the person who installed the boiler;

(b) the person providing the warranty; or

(c) a person acting on behalf of a person in sub-paragraph (a) or (b).

5. The warranty must be accompanied by confirmation in writing from an occupier of the domestic premises at which the boiler is installed that, to that person's knowledge, no consumer has been charged for the warranty.

Articles 27 and 32

SCHEDULE 4 Relevant F or G owner-occupied premises

1. A qualifying action is installed at domestic premises that are β€œrelevant F or G owner-occupied premises” ifβ€”

(a) a relevant local authority has made a statement in writing that, in the opinion of the local authority, the premises are occupiedβ€”

(i) by a household living on a low income in a home which cannot be kept warm at a reasonable cost; or

(ii) by a household living on a low income and vulnerable to the effects of living in a cold home;

(b) the premises are owner-occupied premises; and

(c) the condition in paragraph 2 or 3 is met.

2. The condition in this paragraph is that a post-installation EPC expresses the energy performance rating of the premises as band F or G.

3. The condition in this paragraph is thatβ€”

(a) a pre-installation EPC expresses the energy performance rating of the premises as band F or G; and

(b) an owner or occupier of the premises has confirmed in writing that, to the best of its knowledge and belief, no changes were made to the premises, after the pre-installation EPC was issued and before the qualifying action was installed, which would increase the energy performance rating of the premises to band A, B, C, D or E.

4. In this Schedule, β€œ relevant local authority ” means a local authority that has published, on its website, a statement of intent made in respect of the local authority, and for the purpose of this definition β€œ statement of intent ” has the meaning given in article 17(5).

Status: There are currently no known outstanding effects for the The Electricity and Gas (Energy Company Obligation) Order 2018.
The Electricity and Gas (Energy Company Obligation) Order 2018 (2018/1183)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
F1Words in art. 2 inserted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 3 (with art. 15 )this amendment (text inserted) should be read in conjunction with other related provisions, see the commentary.inserted
F2Word in art. 14(3)(b)(i) omitted (1.1.2020) by virtue of The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 4(a) (with art. 15 )this amendment (text omitted) should be read in conjunction with other related provisions, see the commentary.omitted
F3Word in art. 14(3)(b)(ii) inserted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 4(b) (with art. 15 )this amendment (text inserted) should be read in conjunction with other related provisions, see the commentary.inserted
F4Art. 14(3)(b)(iii) inserted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 4(c) (with art. 15 )this amendment (text inserted) should be read in conjunction with other related provisions, see the commentary.inserted
F5Words in art. 16(1)(b)(iv) omitted (1.1.2020) by virtue of The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 5(a) (with art. 15 )this amendment (text omitted) should be read in conjunction with other related provisions, see the commentary.omitted
F6Art. 16(4) omitted (1.1.2020) by virtue of The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 5(b) (with art. 15 )this amendment (text omitted) should be read in conjunction with other related provisions, see the commentary.omitted
F7Word in art. 17(3)(c)(i) omitted (1.1.2020) by virtue of The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 6(a) (with art. 15 )this amendment (text omitted) should be read in conjunction with other related provisions, see the commentary.omitted
F8Word in art. 17(3)(c)(ii) inserted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 6(b) (with art. 15 )this amendment (text inserted) should be read in conjunction with other related provisions, see the commentary.inserted
F9Art. 17(3)(c)(iii) inserted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 6(c) (with art. 15 )this amendment (text inserted) should be read in conjunction with other related provisions, see the commentary.inserted
F10Art. 18 substituted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 7 (with art. 15 )this amendment (text substituted) should be read in conjunction with other related provisions, see the commentary.substituted
F11Art. 19(1)(ca) inserted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 8(a) (with art. 15 )this amendment (text inserted) should be read in conjunction with other related provisions, see the commentary.inserted
F12Words in art. 19(2) inserted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 8(b) (with art. 15 )this amendment (text inserted) should be read in conjunction with other related provisions, see the commentary.inserted
F13Art. 27(2) substituted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 9(a) (with art. 15 )this amendment (text substituted) should be read in conjunction with other related provisions, see the commentary.substituted
F14Art. 27(2A) inserted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 9(b) (with art. 15 )this amendment (text inserted) should be read in conjunction with other related provisions, see the commentary.inserted
F15Art. 28(2) substituted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 10(a) (with art. 15 )this amendment (text substituted) should be read in conjunction with other related provisions, see the commentary.substituted
F16Art. 28(2A) inserted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 10(b) (with art. 15 )this amendment (text inserted) should be read in conjunction with other related provisions, see the commentary.inserted
F17Art. 30(2)(b) substituted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 11(a) (with art. 15 )this amendment (text substituted) should be read in conjunction with other related provisions, see the commentary.substituted
F18Art. 30(2A) inserted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 11(b) (with art. 15 )this amendment (text inserted) should be read in conjunction with other related provisions, see the commentary.inserted
F19Art. 32(2) substituted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 12(a) (with art. 15 )this amendment (text substituted) should be read in conjunction with other related provisions, see the commentary.substituted
F20Art. 32(2A) inserted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 12(b) (with art. 15 )this amendment (text inserted) should be read in conjunction with other related provisions, see the commentary.inserted
F21Words in art. 32(3) substituted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 12(c)(i) (with art. 15 )this amendment (text substituted) should be read in conjunction with other related provisions, see the commentary.substituted
F22Words in art. 32(3) inserted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 12(c)(ii) (with art. 15 )this amendment (text inserted) should be read in conjunction with other related provisions, see the commentary.inserted
F23Word in art. 32(3) inserted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 12(c)(iii) (with art. 15 )this amendment (text inserted) should be read in conjunction with other related provisions, see the commentary.inserted
F24Art. 33(2)(a) substituted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 13(a)(i) (with art. 15 )this amendment (text substituted) should be read in conjunction with other related provisions, see the commentary.substituted
F25Word in art. 33(2)(f) omitted (1.1.2020) by virtue of The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 13(a)(ii) (with art. 15 )this amendment (text omitted) should be read in conjunction with other related provisions, see the commentary.omitted
F26Art. 33(2)(fa)-(fc) inserted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 13(a)(iii) (with art. 15 )this amendment (text inserted) should be read in conjunction with other related provisions, see the commentary.inserted
F27Words in art. 33(4) inserted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 13(b) (with art. 15 )this amendment (text inserted) should be read in conjunction with other related provisions, see the commentary.inserted
F28Words in Sch. 2 para. 5 substituted (2.12.2019) by The Civil Partnership (Opposite-sex Couples) Regulations 2019 (S.I. 2019/1458) , reg. 1(2) , Sch. 3 para. 105substituted
F29Words in Sch. 3 para. 1 substituted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 14(a) (with art. 15 )this amendment (text substituted) should be read in conjunction with other related provisions, see the commentary.substituted
F30Words in Sch. 3 para. 2(b) substituted (1.1.2020) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2019 (S.I. 2019/1441) , arts. 1 , 14(b) (with art. 15 )this amendment (text substituted) should be read in conjunction with other related provisions, see the commentary.substituted
M11986 c.44 . Section 33BD was inserted by section 68 of the Energy Act 2011 (c.16) .
M21989 c.29 . Section 41B was inserted by section 69 of the Energy Act 2011.
M32000 c.27 . Section 103A was inserted by section 70 of the Energy Act 2011 and amended by section 60 of the Scotland Act 2016 (c.11) and S.I. 2014/631 . Section 60 of the Scotland Act 2016 was brought into force by S.I. 2017/1157 for the purpose of making orders to come into force not earlier than 1st October 2018.
M41972 c.68 . Section 2(2) was amended by section 27(1)(a) of the Legislative and Regulatory Reform Act 2006 (c.51) and by Part 1 of the Schedule to the European Union (Amendment) Act 2008 (c.7) . The European Communities Act 1972 is prospectively repealed by the European Union (Withdrawal) Act 2018 (c.16) .
M5Notwithstanding section 33BDA of the Gas Act 1986 and section 41BA of the Electricity Act 1989, as inserted by section 59 of the Scotland Act 2016, the Secretary of State may, by virtue of section 33BDA(10) of the Gas Act 1986 and section 41BA(10) of the Electricity Act 1989, make provision under section 33BD of the Gas Act 1986 and section 41B of the Electricity Act 1989 for the purposes of obligations imposed under those sections in relation to Scotland, with the agreement of the Scottish Ministers. Section 59 of the Scotland Act 2016 was brought into force by S.I. 2017/1157 for the purpose of making orders to come into force not earlier than 1st October 2018, and comes into force for remaining purposes on 1st October 2018.
M6S.I. 2010/761 .
M7Section 33BC was inserted by section 99 of the Utilities Act 2000 (c.27) and amended by section 15 of, and the Schedule to, the Climate Change and Sustainable Energy Act 2006 (c.19) , Schedule 8 to the Climate Change Act 2008 (c.27) , section 66 of the Energy Act 2011 (c.16) and S.I. 2014/631 .
M8Section 41A was inserted by section 70 of the Utilities Act 2000 and amended by section 16 of, and the Schedule to, the Climate Change and Sustainable Energy Act 2006, Schedule 8 to the Climate Change Act 2008, section 67 of, and Schedule 1 to, the Energy Act 2011 and S.I. 2014/631 .
M9Paragraph 2(2) of Schedule 2 was amended by section 27(2)(a) of the Legislative and Regulatory Reform Act 2006.
M10S.I. 2014/3219 was amended by S.I. 2017/490 .
M112004 c.34 .
M122006 asp 1 . Section 125 was amended by section 13 of the Private Rented Housing (Scotland) Act 2011 (asp 14) .
M13The responsiveness ratings for electric storage heaters are set out in table 4a of the Standard Assessment Procedure.
M14S.I. 2012/3118 . Regulation 2 was amended by S.I. 2016/284 . There are other amendments which are not relevant.
M15S.S.I. 2008/309 . Regulation 2 was amended by S.S.I. 2012/208 and S.S.I. 2013/12 . There are other amendments which are not relevant.
M16Regulation 11 was amended by S.I. 2014/880 , S.I . 2015/609 and S.I. 2016/284 .
M172006 c.46 .
M181989 c.29 . Section 6 was substituted by section 30 of the Utilities Act 2000 (c.27) and amended by section 89(3) of the Energy Act 2004 (c.20) and S.I. 2011/2704 . There are other amendments which are not relevant.
M191986 c.44 ; section 7A was inserted by section 6(1) of the Gas Act 1995 (c.45) and amended by section 3(2) of, and Schedule 6 to, the Utilities Act 2000. There are other amendments which are not relevant.
M202009 c.20 . Section 103 was amended by sections 12(2) and 14(2) of the Cities and Local Government Devolution Act 2016 (c.1) .
M211994 c.39 . Section 2 was amended by paragraph 232 of Schedule 22 to the Environment Act 1995 (c.25) .
M221960 c.62 . There are amendments to Part 1 which are not relevant.
M231968 c.52 . There are amendments to section 13 which are not relevant.
M241992 c.14 . See section 3, which was amended by S.I. 2013/468 .
M25See section 72.
M262008 c.32 . Section 100(4) was amended by S.I. 2011/2195 .
M27Defined in Schedule 1 to the Interpretation Act 1978 (c.30) .
M28ISBN 978 0 580 99563 7. This specification for the installation of energy efficiency measures in existing dwellings and insulation in residential park homes was published by the British Standards Institution on 30th June 2019.
M28ISBN 978 0 580 99563 7. This specification for the installation of energy efficiency measures in existing dwellings and insulation in residential park homes was published by the British Standards Institution on 30th June 2019.
M29ISBN 978 0 580 78472 9. This international standard was published by the British Standards Institution on 31st October 2012.
M29ISBN 978 0 580 78472 9. This international standard was published by the British Standards Institution on 31st October 2012.
M30ISBN 978 0 580 99564 4. This specification and guidance for retrofitting dwellings for improved energy efficiency was published by the British Standards Institution on 30th June 2019.
M30ISBN 978 0 580 99564 4. This specification and guidance for retrofitting dwellings for improved energy efficiency was published by the British Standards Institution on 30th June 2019.
M31S.I. 2012/3018 , as amended by S.I. 2014/1131 , S.I . 2014/2897 and S.I. 2014/3231 .
M32S.I. 2015/962 .
M332006 asp 1 . See section 12 which was amended by Schedule 2 to the Land Reform (Scotland) Act 2016 (asp 18) .
M34The Government's Reduced Data Standard Assessment Procedure for Energy Rating of Dwellings (2012 Edition, version 9.92) is at Appendix S of the document entitled β€œThe Government's Standard Assessment Procedure for the Energy Rating of Dwellings 2012 edition” which can be accessed at
M35See the footnote to the definition of β€œReduced Data Standard Assessment Procedure”.
M36See section 33BD(1) of the Gas Act 1986 and section 41B(1) of the Electricity Act 1989 for the definition of β€œhome-heating cost reduction obligation”.
M37S.I. 2011/1033 , as amended by S.I. 2014/695 , S.I. 2015/652 and S.I. 2016/806 and the Warm Home Discount (Miscellaneous Amendments) Regulations 2018 .
M38ISBN 978 0 580 82569 9. This specification for the installation of energy efficiency measures in existing buildings was published by the British Standards Institution on 31st January 2017.
M39S.I. 2014/928 , amended by S.I. 2015/143 , S.I. 2015/145 , S.I. 2015/1459 , S.I. 2016/257 , S.I. 2017/857 , S.I. 2018/610 and S.I. 2018/635 . See regulation 2.
M40S.I. 2018/611 , amended by S.I. 2018/635 . See regulation 2.
M412010 c.4 .
M422018 c.12 .
M43OJ No. C 368, 28.10.2017, p.6. The Horizon 2020 Work Programme 2018-2020 and its General Annexes can be found at: http://ec.europa.eu/research/participants/portal/desktop/en/funding/reference_docs.html#h2020-work-programmes-2018-20 A copy can be inspected by contacting the Energy Company Obligation Team at the Department for Business, Energy and Industrial Strategy, 1 Victoria Street, London SW1H 0ET.
M441986 c.44 . Section 30O was inserted by paragraph 1 of Schedule 14 to the Energy Act 2013 (c.32) .
M451989 c.29 . Section 27O was inserted by paragraph 2 of Schedule 14 to the Energy Act 2013.
M46OJ No. L 315, 14.11.2012, p.1. The Directive has been amended but the amendments are not relevant.
M471985 c.68 . Part 5 was amended by section 83 of the Housing Act 1988 (c.50) , sections 104 , 105 , 108 to 120 of, and Schedules 21 and 22 to, the Leasehold Reform, Housing and Urban Development Act 1993 (c. 28) , Schedules 16 and 18 to the Government of Wales Act 1998 (c.38) , Schedule 5 to the Commonhold and Leasehold Reform Act 2002 (c.15) , sections 180 to 190 , 192 , 193 of, and Schedule 16 to, the Housing Act 2004 (c.34) , Schedules 11 and 13 to the Land Registration Act 2002 (c.9) , Schedules 19 and 22 to the Localism Act 2011 (c.20) , section 100 of, and Schedule 11 to, the Anti-social Behaviour, Crime and Policing Act 2014 (c.12) , the Abolition of the Right to Buy and Associated Rights (Wales) Act 2018 (anaw 1), S.I . 1996/2325 and S.I. 2010/866 . There are other amendments which are not relevant.
M481987 c.26 . Sections 61 to 84 were amended by sections 3 and 65 of, and Schedules 2, 8, 9 and 10 to, the Housing (Scotland) Act 1988 (c.43) , sections 168 and 176 of, and Schedules 11 and 12 to, the Local Government and Housing Act 1989 (c.42) , sections 144 , 145 , 157 of, and Schedule 22 to, the Leasehold Reform, Housing and Urban Development Act 1993 (c.28) , Schedules 13 and 14 to the Local Government etc. (Scotland) Act 1994 (c.39) , Schedule 2 to the Planning (Consequential Provisions) (Scotland) Act 1997 (c.11) , Schedule 18 to the Government of Wales Act 1998 (c.38) , sections 42 to 49 , 51 and 108 of, and Schedule 10 to, the Housing (Scotland) Act 2001 (asp 10) , Schedule 7 to the Water Industry (Scotland) Act 2002 (asp 3) , sections 140 to 144 of the Housing (Scotland) Act 2010 (asp 17) , section 113 of the Housing (Scotland) Act 2006 (asp 1) and S.I. 2000/2040 . Sections 61 to 81 and 84 are repealed by section 1 of the Housing (Scotland) Act 2014 (asp 14) , subject to savings made by S.S.I. 2014/264 .
M49Section 84A was inserted by section 178 of the Local Government and Housing Act 1989 (c.42) . It was amended by paragraph 13 of Schedule 10 to the Housing (Scotland) Act 2001. Section 84A is repealed by section 1 of the Housing (Scotland) Act 2014, subject to savings made by S.S.I. 2014/264 .
M50Section 1 was amended by Schedule 8 to the Local Government (Wales) Act 1994 (c.19) .
M51Section 5 was amended by S.I. 1996/2325 , S.I . 2010/866 and Schedule 4 to the Co-operative and Community Benefit Societies Act 2014 (c.14) .
M522011 c.25 .
M532010 asp 17 . There are amendments to section 165 which are not relevant.
M54Section 80(1) was amended by section 83 of, and Schedule 18 to, the Housing Act 1988 (c.50) , Schedules 16 and 18 to the Government of Wales Act 1998 (c.38) , Schedules 19 and 22 to the Localism Act 2011 (c.20) , S.I . 2008/3002 and S.I. 2010/866 .
M551996 c.52 . Chapter 1 of Part 1 was amended by Schedules 16 and 18 to the Government of Wales Act 1998, Schedule 8 to the Charities Act 2006 (c.50) , section 61 of, and Schedule 16 to, the Housing and Regeneration Act 2008 (c.17) , Schedule 4 to the Co-operative and Community Benefit Societies Act 2014 (c.14) , S.I . 2009/1941 and S.I. 2013/496 . There are other amendments which are not relevant.
M562004 c.32 . Section 1 was amended by Schedule 8 to the Public Service Pensions Act 2013 (c.25) .
M57See section 64. That section was amended by section 66 of the Welfare Reform and Pensions Act 1999 (c.30) , Schedule 1 to the Pensions Act 2007 (c.22) and Schedules 9 and 14 to the Welfare Reform Act 2012 (c.5) .
M58See section 70. That section was amended by S.I. 1994/2556 , S.I . 2002/1457, S.I. 2011/2426 , S.I . 2013/388, S.I. 2013/796 and S.I. 2015/1754 .
M59See sections 141 and 145A. Section 141 was amended by section 1 of the Child Benefit Act 2005 (c.6) . Section 145A was inserted by section 55 of the Tax Credits Act 2002 (c.21) and was amended by Schedule 24 to the Civil Partnership Act 2004 (c.33) and Schedule 1 to the Child Benefit Act 2005.
M602002 c.21 . Section 8 is prospectively repealed by Schedule 14 to the Welfare Reform Act 2012.
M61S.I. 1983/686 . Article 14 was substituted by S.I. 2001/420 .
M62S.I. 2006/606 . Article 8 was amended by S.I. 2006/1455 and S.I. 2009/706 .
M63See section 71. That section was amended by section 67 of the Welfare Reform and Pensions Act 1999. Disability living allowance under Part 3 of the 1992 Act is prospectively repealed by section 90 of the Welfare Reform Act 2012.
M642002 c.16 . Section 2 was amended by Schedule 24 to the Civil Partnership Act 2004.
M652007 c.5 . Section 1 was amended by sections 50, 52 and 53 of the Welfare Reform Act 2012. It was also amended by section 54 of, and Schedules 3 and 14 to, the Welfare Reform Act 2012 and these amendments have been brought into force for certain purposes. It is prospectively amended by section 62 of the Welfare Reform Act 2012.
M661995 c.18 . Section 1 was amended by Schedules 7 and 13 to the Welfare Reform and Pensions Act 1999, Schedule 24 to the Civil Partnership Act 2004 and Schedule 3 to the Welfare Reform Act 2007 (c.5) . It was also amended by sections 44 and 49 of, and Schedule 14 to, the Welfare Reform Act 2012 and these amendments have been brought into force for certain purposes. It is prospectively amended by section 61 of the Welfare Reform Act 2012.
M67See section 124. That section was amended by Schedules 2 and 3 to the Jobseekers Act 1995, Schedule 8 to the Welfare Reform and Pensions Act 1999, Schedules 2 and 3 to the State Pension Credit Act 2002, Schedule 24 to the Civil Partnership Act 2004, Schedules 3 and 8 to the Welfare Reform Act 2007, section 3 of the Welfare Reform Act 2009 (c.24) and section 59 of the Welfare Reform Act 2012. Part 7 is prospectively repealed by Schedule 14 to the Welfare Reform Act 2012.
M68See section 94(2)(a).
M692012 c.5 . See section 77.
M70See section 68. That section was repealed by section 65 of the Welfare Reform and Pensions Act 1999. S.I. 2000/2958 made savings relating to those entitled to severe disablement allowance before the repeal was brought into force.
M71See section 1.
M72Section 150(2) was amended by section 132 of the Pensions Act 1995 (c.26) and Schedule 6 to the Income Tax (Earnings and Pensions) Act 2003 (c.1) . There are other amendments which are not relevant. The mobility supplement defined in that section is known as war pensions mobility supplement.
M73Section 10 is prospectively repealed by Schedule 14 to the Welfare Reform Act 2012.
M74See section 143. That section was amended by section 72 of the Child Support, Pensions and Social Security Act 2000 (c.19) , Schedule 24 to the Civil Partnership Act 2004, Schedules 1 and 2 to the Child Benefit Act 2005, S.I. 2013/1465 and S.I. 2016/413 .
M751992 c.4 .
M76See section 142. That section was amended by section 1 of the Child Benefit Act 2005.
Defined TermSection/ArticleIDScope of Application
1992 Actpara SCHEDULE 2legTermSUiIPo02
2014 Orderart. 2. of PART 1legTermU3AfJrl1
a proposed transferart. 34. of PART 8(β€œ_prnpNj1f
a proposed transferart. 35. of PART 8(β€œ_prnkSit4
A to E private rented premisesart. 2. of PART 1legTermIF1z4LAV
aggregated statistical informationart. 38. of PART 9legTermqY3uSTeT
an alternative methodologyart. 27. of PART 7(β€œ_prnOEwfh
appropriate warrantyart. 33. of PART 7legTerm3Roz4ZXX
broken boilerart. 32. of PART 7legTerm9lddK9vO
broken boilerart. 33. of PART 7legTermZltxrdwZ
broken electric storage heaterart. 32. of PART 7legTermeA06Vg0I
broken electric storage heaterart. 33. of PART 7legTermDwcggyQR
central heating systemart. 2. of PART 1legTermRF92vPUE
certificate of lodgementart. 18. of PART 4certificat_rtkWuk2
childpara SCHEDULE 2legTermEUZ7EHpM
commencement dateart. 2. of PART 1legTermeUHlQiUR
companyart. 2. of PART 1legTermlqjPSlNP
completedart. 2. of PART 1legTermR97NDirR
connected personart. 19. of PART 4legTermg9FmsNi4
core group customerart. 14. of PART 4legTermbeUO85GD
cost savingsart. 2. of PART 1legTermUCM3UXEF
cost scoreart. 31. of PART 7legTermQLxJKCUK
couplepara SCHEDULE 2legTerm1XtqnMe3
customer segmentationart. 38. of PART 9legTermwk5xl6lD
demonstration actionart. 2. of PART 1legTermZZet7g90
district heating connectionart. 2. of PART 1legTermYQEBTfrK
district heating systemart. 2. of PART 1legTermXMcUgAdE
domestic customerart. 2. of PART 1legTermJ0rIopiv
domestic premisesart. 2. of PART 1legTermLrTCuGcY
dual licence-holderart. 3. of PART 1legTermBQnfBx6R
ECO2 carbon qualifying actionart. 23. of PART 5legTermkp9kn0PA
ECO2 CERO targetart. 23. of PART 5legTermAYXFXEm7
ECO2 heating qualifying actionart. 23. of PART 5legTermShWkkWiu
efficient repairable electric storage heaterart. 2. of PART 1legTermlNkZX9Hp
efficient repairable heating systemart. 19. of PART 4legTermUj81aO9r
electric heating systemart. 19. of PART 4legTermmv5iqa01
energy performance certificateart. 2. of PART 1energy_per_rtos01o
energy performance indicatorart. 2. of PART 1energy_per_rttkb16
energy performance ratingart. 2. of PART 1energy_per_rtjaIzU
energy savingsart. 38. of PART 9energy_sav_rtSFZfE
excess innovation measureart. 12. of PART 4legTermTxX3SNkk
F, G or unrated private rented premisesart. 2. of PART 1legTerm3POEEwxo
final customerart. 38. of PART 9final_cust_rtxClo5
first time heating systemart. 2. of PART 1legTermOAA6KEQ8
ground source heat pumpart. 18. of PART 4ground_sou_rt6sx25
ground source heat pumpart. 19. of PART 4legTermAekqocov
groupart. 2. of PART 1group_rtV3EoB
group of companiesart. 2. of PART 1legTermBw1ti14H
groupsart. 10. of PART 3groups_rt9iNOk
groupsart. 9. of PART 3groups_rtUVMYL
guarantee creditpara SCHEDULE 2legTerm81NjSxet
Heat Trust Schemeart. 18. of PART 4Heat_Trust_rtLUUfY
help to heat groupart. 14. of PART 4legTermLLcROtzl
HMOart. 2. of PART 1HMO_rty0Aof
holding companyart. 2. of PART 1legTermM5wcTqLB
house in multiple occupationart. 2. of PART 1house_in_m_rtzotrJ
in-fill measureart. 34. of PART 8legTermADN2blpH
inefficient repairable heating systemart. 19. of PART 4legTermTr9PVdfm
innovation measureart. 2. of PART 1legTermiujEuQPX
innovation measure descriptionart. 12. of PART 4legTermAdhwPIoW
installationart. 2. of PART 1installati_rt7FNp8
licence-holderart. 2. of PART 1legTerm5pMPGZNu
load profilesart. 38. of PART 9legTerm4yzhx8Pz
local authorityart. 2. of PART 1legTermZj9eAKJN
mobile homeart. 2. of PART 1legTermNUpJLPnP
monitored measureart. 2. of PART 1legTermhzmnusKQ
non-gas fuelled premisesart. 32. of PART 7legTermy3hWKIay
non-renewable sourceart. 2. of PART 1legTermovKFgeVW
oilart. 2. of PART 1legTermW0ISfjCs
original deadlineart. 25. of PART 6legTerm04VUOmo6
ownerart. 2. of PART 1legTermx0FqsRYl
owner-occupied premisesart. 2. of PART 1legTermZPJpfdLJ
participantart. 2. of PART 1legTerm6gj9EsyA
participantsart. 10. of PART 3legTermx565OHLV
PAS 2030:2017art. 18. of PART 4PAS_2030:2_rtJQhXn
PAS 2030:2017 certified installerart. 18. of PART 4PAS_2030:2_rtDn7Qi
PAS 2030:2019art. 2. of PART 1legTermbhDGW58W
PAS 2030:2019 certified installerart. 2. of PART 1legTermOCxDkaw6
PAS 2035:2019art. 2. of PART 1legTerm1wGHMzi6
peak energy efficiencyart. 19. of PART 4legTermLVZ1mkSp
personal dataart. 20. of PART 5legTermazu28zA1
phaseart. 2. of PART 1legTermsqhSPgrY
phase 1art. 2. of PART 1(β€œ_prnOQKT0
phase 2art. 2. of PART 1(β€œ_prnkRDw2
phase 3art. 2. of PART 1(β€œ_prnltjNi
phase 4art. 2. of PART 1(β€œ_prnmww36
planned monitoringart. 24. of PART 6legTermTs72fTqk
post-installation EPCart. 2. of PART 1legTermD0KlPeYF
pre-installation EPCart. 2. of PART 1legTerm3kfA0UT8
previous energy efficiency schemesart. 2. of PART 1legTermThSsUp4b
primary actionsart. 34. of PART 8legTermOQXFEH8C
primary insulation measureart. 2. of PART 1legTermQiomsJJG
private domestic premisesart. 2. of PART 1legTerm5NamHyzC
private rented premisesart. 2. of PART 1legTermhAtHKRVi
qualification yearart. 2. of PART 1legTermU56StI3f
qualifying actionart. 2. of PART 1legTermEm5tcXvq
qualifying numberart. 3. of PART 1legTermkx42DUwz
qualifying supplyart. 2. of PART 1legTermtzyhYBa4
qualifying young personpara SCHEDULE 2legTermfjMv9oxI
Reduced Data Standard Assessment Procedureart. 2. of PART 1legTermFRBumSh3
related primary measureart. 34. of PART 8legTermokRyrHng
relevant F or G owner-occupied premisespara SCHEDULE 4relevant_F_rtgjt9L
relevant interestpara SCHEDULE 1legTermFfWBGDfL
relevant local authoritypara SCHEDULE 4legTermshhUVjrz
relevant supplierart. 2. of PART 1legTermzj0TXTV1
renewable heating measureart. 2. of PART 1legTermq26vCN8n
reporting yearart. 38. of PART 9legTerm7TjEWTDM
room-in-roofart. 19. of PART 4legTermOgxGmshr
room-in-roofart. 33. of PART 7legTermpmlgqGsI
rural areaart. 11. of PART 4legTermq5hIF3uC
scheme yearart. 14. of PART 4legTerm52ecL40S
scoreart. 2. of PART 1legTermzSsr8b85
secondary heating measureart. 2. of PART 1legTermo5VNKToj
shared ground loopart. 18. of PART 4shared_gro_rttxMTc
single claimantpara SCHEDULE 2legTermnP10U7BI
social housingart. 2. of PART 1legTermKsaV2QT5
social landlordart. 2. of PART 1legTermv72BhEq8
social landlordpara SCHEDULE 1legTermqmF1Ky3b
solid wallart. 2. of PART 1legTermI94XuEuL
solid wall actionart. 11. of PART 4legTermmbhHzSFR
solid wall alternative measureart. 11. of PART 4legTermwxglryT3
solid wall insulationart. 2. of PART 1legTermWuvd1otT
solid wall minimum requirementart. 2. of PART 1legTermXfV4wNY3
Standard Assessment Procedureart. 2. of PART 1legTermEqhdgpGd
statement of intentart. 17. of PART 4legTermi2YLcgjn
statement of intentpara SCHEDULE 4legTermndD03Saf
surplus actionart. 2. of PART 1legTermPrLA4w06
technology readiness levelart. 20. of PART 5technology_rtFOEVj
Tgart. 8. of PART 3Tg_rt6cNdp
the actual costart. 24. of PART 6(β€œ_prn61vnC
the Energy Efficiency Directiveart. 38. of PART 9legTermByBJAVf5
the in-fill measureart. 14. of PART 4the_in-fil_rtLn47t
the innovation measure descriptionart. 21. of PART 5(β€œ_prnc2o9V
the notifying participantart. 25. of PART 6(β€œ_prnLOgOD
the primary actionsart. 14. of PART 4the_primar_rtzkpjA
the proposed connectionart. 27. of PART 7the_propos_rtM5ssv
the proposed transfer amountart. 35. of PART 8(β€œ_prnbICy9
the related primary measureart. 2. of PART 1(β€œ_prnKxJsH
the relevant obligationart. 35. of PART 8(β€œ_prnezguy
third partypara SCHEDULE 3legTermPoH8rmk3alert
total home-heating cost reduction obligationart. 2. of PART 1legTermG4VjyyZg
total solid wall minimum requirementart. 2. of PART 1legTermD8gIsvDp
TRLart. 20. of PART 5TRL_rtMDgRV
TrustMarkart. 18. of PART 4TrustMark_rtUhFAs
TrustMark Certificate of Lodgementart. 18. of PART 4TrustMark__rtJP3U7
Txart. 7. of PART 3Tx_rtOXZcN
underfloor insulationart. 33. of PART 7legTermXYkBAmLT
uninsulated premisesart. 19. of PART 4legTermqpP6mRMt
uninsulated solid wall premisesart. 11. of PART 4legTermaCgUpw3a
wall insulationart. 2. of PART 1legTermBMFhMifU
wholly-owned subsidiaryart. 2. of PART 1legTermPCGVFptt

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.