Statutory Instruments
2018 No. 1390
Highways, England
The Warrington Borough Council (Construction of Warrington Waterfront – Centre Park Link Bridge) Scheme 2017 Confirmation Instrument 2018
Made
18th December 2018
Coming into force in accordance with article 1
1. This Instrument may be cited as The Warrington Borough Council (Construction of Warrington Waterfront – Centre Park Link Bridge) Scheme 2017 Confirmation Instrument 2018 and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.
2. The Warrington Borough Council (Construction of Warrington Waterfront – Centre Park Link Bridge) Scheme 2017, and as set out in the Schedule, is hereby confirmed with modifications.
3. The Scheme as confirmed is set out in the Schedule (including the plans) and copies of the Scheme with its accompanying plans are deposited at the offices of the Department for Transport, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex TN37 7GA and at the offices of the Warrington Borough Council, Contact Warrington, 26-30 Horsemarket Street, Warrington WA1 1XL.
Signed by authority of the Secretary of State for Transport
C J Miller
A Senior Civil Servant in the Department for Transport
18th December 2018
Regulation 3
THE SCHEDULE THE WARRINGTON BOROUGH COUNCIL (CONSTRUCTION OF WARRINGTON WATERFRONT – CENTRE PARK LINK BRIDGE) SCHEME 2017
The Warrington Borough Council (hereinafter referred to as “the Council” makes this Scheme in exercise of its powers under Section 106(3) of the Highways Act 1980 and of all other powers enabling it in that behalf.
2. The Scheme may be cited as The Warrington Borough Council (Construction of Warrington Waterfront – Centre Park Link Bridge) Scheme 2017.
3. The Scheme is made with the consent of Warrington Borough Council which is the Local Highway Authority for the area.
Given under the common seal of the Council on the 20th day of December 2017
THE COMMON SEAL of WARRINGTON BOROUGH COUNCIL was hereunto affixed in the presence of:
C.S
Authorised Signatory
THE SCHEDULE TO THE SCHEME
PLANS AND SPECIFICATIONS OF THE CENTRE PARK LINK BRIDGE – WCPL
The location and general design of the bridge are shown on the plans numbered CPL-RAM-ZZ-01-DR-S-1001 Rev. D1.1 and CPL-RAM-ZZ-01-DR-S-1010 Rev. C1A and marked “The Warrington Borough Council (Construction of Warrington Waterfront – Centre Park Link Bridge) Scheme 2017”.
POINTS OF COMMENCEMENT AND TERMINATION
From a point on the North Bank of the River Mersey whose coordinates are 360248.01E, 386609.64N to a point on the South Bank whose coordinates are 360286.83E, 386580.55N. Ordnance survey Map reference SJ68.
SPAN
A single clear span of 45 metres.
WIDTH
16.95m width.
The bridge carries vehicular traffic, pedestrians and cyclists.
HEADWAY
The deck spans over the main channel, which is approximately 24 metres wide. There is a minimum headway/air draft of 2.35 metres, based on the proposed soffit level of 8.65m A.O.D and water level at mean high water springs (MHWS) of 6.30 metres. The River Mersey at this location is only tidal during spring tides. For the remainder of the year the River Mersey is fluvial, resulting in a headway/air draft of 4.65 metres based upon the proposed soffit level of 8.65 metres A.O.D and mean water level of 3.70 metres.
WATERWAY – THE RIVER MERSEY
The navigable channel at the bridge is 24m wide.
1980 c.66 . Section 106(3) is amended by the Infrastructure Act 2015 (c.7) , paragraph 34(2) of Schedule 1(1).