Statutory Instruments

2018 No. 381

Highways, England

The Wigan Borough Council (Scotman’s Flash, Wigan Canal Bridge) Scheme 2017 Confirmation Instrument 2018

Made

15th March 2018

Coming into force in accordance with article 1

The Secretary of State for Transport, makes this Instrument in exercise of the powers conferred by section 106(3) of the Highways Act 1980( 1 ), and now vested in the Secretary of State( 2 ):

1. This Instrument may be cited as The Wigan Borough Council (Scotman’s Flash, Wigan Canal Bridge) Scheme 2017 Confirmation Instrument 2018 and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.

2. The Wigan Borough Council (Scotman’s Flash, Wigan Canal Bridge) Scheme 2017, and as set out in the Schedule, is hereby confirmed with modifications.

3. The Scheme as confirmed is set out in the Schedule (including the plan) and copies of the Scheme with its accompanying plan are deposited at the offices of the Department for Transport, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex TN37 7GA and at the offices of the Wigan Borough Council, Town Hall, Library Street, Wigan, WN1 1YN.

Signed by authority of the Secretary of State for Transport

C J Miller

A Senior Civil Servant in the Department for Transport

15th March 2018

Regulation 3

THE SCHEDULE

THE WIGAN BOROUGH COUNCIL (SCOTMAN’S FLASH, WIGAN CANAL BRIDGE) SCHEME 2017

The Wigan Borough Council (hereinafter referred to as “the Council”) make this Scheme in exercise of their powers under section 106(3) of the Highways Act 1980 and of all other powers enabling them in that behalf:

2. This Scheme may be cited as The Wigan Borough Council (Scotman’s Flash, Wigan Canal Bridge) Scheme 2017.

Given under the common seal of the Council
On the 25th day of October 2017
THE COMMON SEAL of the
WIGAN BOROUGH COUNCIL
was hereunto affixed in the presence of:
C.S
Assistant Director - Legal

Regulation 3

THE SCHEDULE TO THE SCHEME

Plans and Specifications of the Scotman’s Canal Bridge

The location and general design of the bridge are shown on the plans numbered H/8894/100/2 and H279/HCL/601 rev. C marked ‘The Wigan Borough Council (Scotman’s Flash, Wigan Canal Bridge) Scheme 2017’.

Points of commencement and termination

From a point on the west bank of the Leeds Liverpool Canal 550 metres east of the B5238 Poolstock Lane.

To a point on the east bank of the Leeds Liverpool Canal 575 metres east of the B5238 Poolstock Lane.

Span(s)

Single span bridge. Clear span between faces of abutments of 32.00 metres. Clear span between reinforced soil abutments of 25.3 metres.

Headway

Not less than 5.0 metres above top water level and not less than 3.87 metres above the new towpath level, which runs alongside the canal.

Waterway

A minimum clear navigable waterway of 9.35 metres.

Overall dimensions

The bridge will carry a 2 lane dual carriageway comprising of 4 x 3.65 metre lane highway, a 3.5 metre combined cycleway/footway, a 2 metre clear verge and 2.3 metre central reserve.

( 1 )

1980 c. 66 . Section 106(3) is amended by the Infrastructure Act 2015 (c. 7) , paragraph 34(2) of Schedule 1(1).

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Wigan Borough Council (Scotman’s Flash, Wigan Canal Bridge) Scheme 2017 Confirmation Instrument 2018 (2018/381)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application
Scheme 2017para THE SCHEDULE TO THE SCHEMEScheme_201_msqR0MNl
the Councilpara THE SCHEDULEthe_Counci_rtTH63U