Highways, England

The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018 Confirmation Instrument 2019

Made

31st January 2019

Coming into force in accordance with article 1

The Secretary of State for Transport, makes this Instrument in exercise of the powers conferred by section 106(3) of the Highways Act 1980( 1 ), and now vested in the Secretary of State( 2 ):

1. This Instrument may be cited as β€œThe Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018 Confirmation Instrument 2019” and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.

2. The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018, and as set out in the Schedule, is hereby confirmed with modifications.

3. The Scheme as confirmed is set out in the Schedule (including the plan) and copies of the Scheme with its accompanying plan are deposited at the offices of the Department for Transport, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex TN37 7GA and at the offices of the Cambridgeshire County Council, Shire Hall, Castle Hill, Cambridge CB3 0AP.

Signed by authority of the Secretary of State for Transport

A. Rhind

A Senior Civil Servant

Department for Transport

31st January 2019

Regulation 3

THE SCHEDULE

THE CAMBRIDGESHIRE COUNTY COUNCIL (CONSTRUCTION OF CAMBRIDGE CHESTERTON / ABBEY FOOT / CYCLE BRIDGE) SCHEME 2018

The Cambridgeshire County Council (hereinafter referred to as β€œthe Council”) makes this Scheme in exercise of their powers under Section 106(3) of the Highways Act 1980 and of all other powers enabling them in that behalf.

1. The Council are authorised to construct over the navigable waters of the River Cam the bridge specified in the Schedule to this Scheme as part of the highway which they are proposing to construct between the Chesterton and the Abbey wards of Cambridge in the said County.

2. The Scheme may be cited as the Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018.

Given under the common seal of the Council on the 15th day of May 2018

C.S

THE COMMON SEAL of the COUNCIL was hereunto affixed in the presence of

Authorised Signatory

Regulation 3

THE SCHEDULE TO THE SCHEME

PLANS AND SPECIFICATIONS OF CAMBRIDGE CHESTERTON / ABBEY FOOT / CYCLE BRIDGE (SCHEME 2018)

The location and general plan layout of Chesterton/ Abbey Bridge are shown on the plan marked β€œThe Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey foot / cycle bridge) Scheme 2018” sealed with the Common Seal of the Cambridgeshire County Council and deposited at Shire Hall, Castle Hill, Cambridge CB3 0AP.

POINTS OF COMMENCEMENT AND TERMINATION

North Approach – Top of the North Abutment

Commencing from a point on the North bank of the River Cam 42.23 metres east of the existing railwaybridge and situated on the Halingway towing path.

Ditton Meadows Approach – Top of the South Abutment

Terminating at a point on the South bank of the River Cam, 35.79 metres east of the existing railwaybridge where the new bridgeapproach meets the existing Jubilee Cycle Path (Sustrans National Cycle Route 51).

Navigation Span

The bridge has a clear span of 44 metres (between abutments), spanning diagonally across the entire width of the River Cam (25 metres approx.). The bridge runs parallel and to the east of the Chesterton railwaybridge. It will be constructed 10 metres away from the railwaybridge.

Headway and Waterway

The navigation waterway is unrestricted for the full width of the river except where locally constrained by the jetty beneath the existing railwaybridge. At which point the Waterway measures 28.97m. The soffit level of the bridge is +7.03m AOD, giving a 3.17m clearance above the current air-draught requirement set by the nearby Chesterton railwaybridge.

Overall Dimensions

The proposed bridge consists of a segregated deck surface of separate lanes for pedestrian and cycle traffic separated by a white line.

The total clear width across both lanes at the abutments is 4.51 metres, with a wider section at the middle of the bridge of 4.92 metres. The bridge will carry a 2.69 metres wide cycle path and a 2.22 metres wide footpath at its widest point. The total clear width across both lanes at the abutments is 4.51 metres.

The structural parapet varies from a height of 1.1m (1.4m on the cycle side) above the deck at the abutments, to 2m above the deck at mid-span.

The length of the south ramp structure is 87.60 metres, whilst the north ramp is 81.3 metres long.

( 1 )

1980 c. 66 . Section 106(3) is amended by the Infrastructure Act 2015 (c. 7) , paragraph 34(2) of Schedule 1(1).

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018 Confirmation Instrument 2019 (2019/206)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application
the Councilpara THE SCHEDULEthe_Counci_rtpBbsb

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.