Statutory Instruments

2020 No. 509

Electricity, England

The Electricity (Individual Exemptions from the Requirement for a Generation Licence) (England) Order 2020

Made

11th May 2020

Laid before Parliament

14th May 2020

Coming into force

5th June 2020

The Secretary of State makes the following Order in exercise of the powers conferred by section 5 of the Electricity Act 1989( 1 ).

The Secretary of State has given notice of the proposal to make this Order in accordance with section 5(2) and (3) of that Act. No representations in respect of the proposal have been made.

Citation and commencement

1. This Order may be cited as the Electricity (Individual Exemptions from the Requirement for a Generation Licence) (England) Order 2020 and comes into force on 5th June 2020.

Interpretation

2. In this Order—

the Act” means the Electricity Act 1989 ;

licensed generator” means the holder of a licence under section 6(1)(a) of the Act;

Lostock Sustainable Energy Plant” means the electricity generating station known as Lostock Sustainable Energy Plant on Griffiths Road in Northwich, Cheshire, whose entrance is situated at Ordnance Survey map reference SJ683740;

Lostock Sustainable Energy Plant Limited” means the company of that name registered in England and Wales with company number 09511491;

Rookery South Energy Recovery Facility” means the electricity generating station known as Rookery South Energy Recovery Facility at Rookery Pit, off Green Lane, in Stewartby, Bedford, whose entrance is situated at Ordnance Survey map reference TL014411;

Rookery South Limited” means the company of that name registered in England and Wales with company number 07094843;

the total system” means all transmission systems and distribution systems, located in England and Wales, of holders of licences under section 6(1)(b) and (c) of the Act( 2 ).

Exemptions from prohibition of unlicensed generation of electricity for supply

3. Exemption is granted from section 4(1)(a) of the Act (prohibition of unlicensed generation of electricity for supply) to—

(a) Lostock Sustainable Energy Plant Limited in respect of Lostock Sustainable Energy Plant; and

(b) Rookery South Limited in respect of Rookery South Energy Recovery Facility.

Conditions on exemptions

4. The exemption granted by article 3(a) of this Order is subject to compliance with the following conditions—

(a) Lostock Sustainable Energy Plant is connected to the total system;

(b) Lostock Sustainable Energy Plant does not export more than 100 megawatts of electrical power to the total system, except in circumstances outside the reasonable control of Lostock Sustainable Energy Plant Limited; and

(c) Lostock Sustainable Energy Plant Limited is not a licensed generator.

5. The exemption granted by article 3(b) of this Order is subject to compliance with the following conditions—

(a) Rookery South Energy Recovery Facility is connected to the total system;

(b) Rookery South Energy Recovery Facility does not export more than 100 megawatts of electrical power to the total system, except in circumstances outside the reasonable control of Rookery South Limited; and

(c) Rookery South Limited is not a licensed generator.

Kwasi Kwarteng

Minister of State

Department for Business, Energy and Industrial Strategy

11th May 2020

( 1 )

1989 c. 29 ; section 5 was substituted by section 29 of the Utilities Act 2000 (c. 27) . Section 5 has been amended by other instruments, but those amendments are not relevant to this Order.

( 2 )

Section 6 was substituted by section 30 of the Utilities Act 2000. Section 6(1)(b) was further substituted by section 136(1) of the Energy Act 2004. Section 6(1)(c) was amended by the Energy Act 2004. Section 6 has been amended by other instruments, but those amendments are not relevant to this Order.

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Electricity (Individual Exemptions from the Requirement for a Generation Licence) (England) Order 2020 (2020/509)
Version from: original only

Displaying information

Status of this instrument

in force Provision is in force
in force* In force only for specified purposes (see footnote)
not in force Not in force in England (may be in force in other geographies, see footnotes)
defined term Defined term
dfn Defined term (alternative style)
footnote commentary transitional and savings in force status related provisions geo extent insert/omit source count in force adj
Defined Term Section/Article ID Scope of Application
licensed generator art. 2. def_390fe018e2
Lostock Sustainable Energy Plant art. 2. def_f23665f5f6
Lostock Sustainable Energy Plant Limited art. 2. def_7a1f8b2e48
Rookery South Energy Recovery Facility art. 2. def_ec69a5a199
Rookery South Limited art. 2. def_adac9cf815
the Act art. 2. def_e916a546e2
the total system art. 2. def_528cd2aef5

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.

Contains public sector information licensed under the Open Government Licence v3.0.