Electricity, England

The Electricity (Individual Exemptions from the Requirement for a Generation Licence) (England) Order 2020

Made

11th May 2020

Laid before Parliament

14th May 2020

Coming into force

5th June 2020

The Secretary of State makes the following Order in exercise of the powers conferred by section 5 of the Electricity Act 1989( 1 ).

The Secretary of State has given notice of the proposal to make this Order in accordance with section 5(2) and (3) of that Act. No representations in respect of the proposal have been made.

Citation and commencement

1. This Order may be cited as the Electricity (Individual Exemptions from the Requirement for a Generation Licence) (England) Order 2020 and comes into force on 5th June 2020.

Interpretation

2. In this Orderโ€”

โ€œthe Actโ€ means the Electricity Act 1989;

โ€œlicensed generatorโ€ means the holder of a licence under section 6(1)(a) of the Act;

โ€œLostock Sustainable Energy Plantโ€ means the electricity generating station known as Lostock Sustainable Energy Plant on Griffiths Road in Northwich, Cheshire, whose entrance is situated at Ordnance Survey map reference SJ683740;

โ€œLostock Sustainable Energy Plant Limitedโ€ means the company of that name registered in England and Wales with company number 09511491;

โ€œRookery South Energy Recovery Facilityโ€ means the electricity generating station known as Rookery South Energy Recovery Facility at Rookery Pit, off Green Lane, in Stewartby, Bedford, whose entrance is situated at Ordnance Survey map reference TL014411;

โ€œRookery South Limitedโ€ means the company of that name registered in England and Wales with company number 07094843;

โ€œthe total systemโ€ means all transmission systems and distribution systems, located in England and Wales, of holders of licences under section 6(1)(b) and (c) of the Act( 2 ).

Exemptions from prohibition of unlicensed generation of electricity for supply

3. Exemption is granted from section 4(1)(a) of the Act (prohibition of unlicensed generation of electricity for supply) toโ€”

(a) Lostock Sustainable Energy Plant Limited in respect of Lostock Sustainable Energy Plant; and

(b) Rookery South Limited in respect of Rookery South Energy Recovery Facility.

Conditions on exemptions

4. The exemption granted by article 3(a) of this Order is subject to compliance with the following conditionsโ€”

(a) Lostock Sustainable Energy Plant is connected to the total system;

(b) Lostock Sustainable Energy Plant does not export more than 100 megawatts of electrical power to the total system, except in circumstances outside the reasonable control of Lostock Sustainable Energy Plant Limited; and

(c) Lostock Sustainable Energy Plant Limited is not a licensed generator.

5. The exemption granted by article 3(b) of this Order is subject to compliance with the following conditionsโ€”

(a) Rookery South Energy Recovery Facility is connected to the total system;

(b) Rookery South Energy Recovery Facility does not export more than 100 megawatts of electrical power to the total system, except in circumstances outside the reasonable control of Rookery South Limited; and

(c) Rookery South Limited is not a licensed generator.

Kwasi Kwarteng

Minister of State

Department for Business, Energy and Industrial Strategy

11th May 2020

( 1 )

1989 c. 29 ; section 5 was substituted by section 29 of the Utilities Act 2000 (c. 27) . Section 5 has been amended by other instruments, but those amendments are not relevant to this Order.

( 2 )

Section 6 was substituted by section 30 of the Utilities Act 2000. Section 6(1)(b) was further substituted by section 136(1) of the Energy Act 2004. Section 6(1)(c) was amended by the Energy Act 2004. Section 6 has been amended by other instruments, but those amendments are not relevant to this Order.

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Electricity (Individual Exemptions from the Requirement for a Generation Licence) (England) Order 2020 (2020/509)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application
licensed generatorart. 2.licensed_g_rt8MUnv
Lostock Sustainable Energy Plantart. 2.Lostock_Su_rt0YZyN
Lostock Sustainable Energy Plant Limitedart. 2.Lostock_Su_rtqbSJg
Rookery South Energy Recovery Facilityart. 2.Rookery_So_rtyACjy
Rookery South Limitedart. 2.Rookery_So_rtPXKZq
the Actart. 2.the_Act_rt3udVj
the total systemart. 2.the_total__rtBeWdq
This instrument is derived from the version at www.legislation.gov.uk. To see a list of all amendments (including any to be made) check the resources page for this instrument on their website. Note, the status of this instrument is given above.
This instrument is derived from the version at www.legislation.gov.uk. To see original commencement information, check the resources page associated with this instrument. n.b. commencement information for marked amendments is embedded in the relevant footnote.

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.