Statutory Instruments
2020 No. 509
Electricity, England
The Electricity (Individual Exemptions from the Requirement for a Generation Licence) (England) Order 2020
Made
11th May 2020
Laid before Parliament
14th May 2020
Coming into force
5th June 2020
The Secretary of State makes the following Order in exercise of the powers conferred by section 5 of the Electricity Act 1989( 1 ).
The Secretary of State has given notice of the proposal to make this Order in accordance with section 5(2) and (3) of that Act. No representations in respect of the proposal have been made.
Citation and commencement
1. This Order may be cited as the Electricity (Individual Exemptions from the Requirement for a Generation Licence) (England) Order 2020 and comes into force on 5th June 2020.
Interpretation
2. In this Orderโ
โthe Actโ means the Electricity Act 1989;
โlicensed generatorโ means the holder of a licence under section 6(1)(a) of the Act;
โLostock Sustainable Energy Plantโ means the electricity generating station known as Lostock Sustainable Energy Plant on Griffiths Road in Northwich, Cheshire, whose entrance is situated at Ordnance Survey map reference SJ683740;
โLostock Sustainable Energy Plant Limitedโ means the company of that name registered in England and Wales with company number 09511491;
โRookery South Energy Recovery Facilityโ means the electricity generating station known as Rookery South Energy Recovery Facility at Rookery Pit, off Green Lane, in Stewartby, Bedford, whose entrance is situated at Ordnance Survey map reference TL014411;
โRookery South Limitedโ means the company of that name registered in England and Wales with company number 07094843;
โthe total systemโ means all transmission systems and distribution systems, located in England and Wales, of holders of licences under section 6(1)(b) and (c) of the Act( 2 ).
Exemptions from prohibition of unlicensed generation of electricity for supply
3. Exemption is granted from section 4(1)(a) of the Act (prohibition of unlicensed generation of electricity for supply) toโ
(a) Lostock Sustainable Energy Plant Limited in respect of Lostock Sustainable Energy Plant; and
(b) Rookery South Limited in respect of Rookery South Energy Recovery Facility.
Conditions on exemptions
4. The exemption granted by article 3(a) of this Order is subject to compliance with the following conditionsโ
(a) Lostock Sustainable Energy Plant is connected to the total system;
(b) Lostock Sustainable Energy Plant does not export more than 100 megawatts of electrical power to the total system, except in circumstances outside the reasonable control of Lostock Sustainable Energy Plant Limited; and
(c) Lostock Sustainable Energy Plant Limited is not a licensed generator.
5. The exemption granted by article 3(b) of this Order is subject to compliance with the following conditionsโ
(a) Rookery South Energy Recovery Facility is connected to the total system;
(b) Rookery South Energy Recovery Facility does not export more than 100 megawatts of electrical power to the total system, except in circumstances outside the reasonable control of Rookery South Limited; and
(c) Rookery South Limited is not a licensed generator.
Kwasi Kwarteng
Minister of State
Department for Business, Energy and Industrial Strategy
11th May 2020
1989 c. 29 ; section 5 was substituted by section 29 of the Utilities Act 2000 (c. 27) . Section 5 has been amended by other instruments, but those amendments are not relevant to this Order.
Section 6 was substituted by section 30 of the Utilities Act 2000. Section 6(1)(b) was further substituted by section 136(1) of the Energy Act 2004. Section 6(1)(c) was amended by the Energy Act 2004. Section 6 has been amended by other instruments, but those amendments are not relevant to this Order.