The Treasury make this Order in exercise of the powers conferred by sections 29A(3), 30(4) and 96(9) of the Value Added Tax Act 1994( 1 ).

Citation and Commencement I1,I2

1. This Order may be cited as the Value Added Tax (Installation of Energy-Saving Materials) Order 2022.

2. Articles 1 to 7 come into force on 1st April 2022.

F1 3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Amendments to the Value Added Tax Act 1994 I3

4. The Value Added Tax Act 1994 is amended as follows.

Installation of energy-saving materials: Northern Ireland I4

5. —(1) Schedule 7A (charge at a reduced rate)( 2 ) is amended as follows.

(2) In the table in Part 1 (index), after “Energy-saving materials: installation” insert “in Northern Ireland” .

(3) In Part 2 (the Groups), in Group 2 —

(a) in the heading, after “materials” insert “in Northern Ireland” ;

(b) in item 1, after “accommodation” insert “in Northern Ireland” ;

(c) in item 2, in the words before paragraph (a), after “accommodation” insert “in Northern Ireland” ; and

(d) in item 3, after “accommodation” insert “in Northern Ireland” .

Installation of energy-saving materials: England and Wales and Scotland from 1 April 2022 to 31 March 2027 I5,I6

6. In Schedule 7A, in Part 2, in Group 3 (grant-funded installation of heating equipment or security goods or connections of gas supply), in items 8A and 8B, after “Supplies” insert “, so far as not falling within Group 23 in Schedule 8,” .

7. —(1) Schedule 8 (zero-rating) is amended as follows.

(2) In the table in Part 1 (index), at the appropriate place insert—

Energy-saving materials: installation in England and Wales and Scotland from 1 April 2022 to 31 March 2027 Group 23

(3) In Schedule 8, in Part 2 (the Groups), at the end insert —

GROUP 23: INSTALLATION OF ENERGY-SAVING MATERIALS IN ENGLAND AND WALES AND SCOTLAND FROM 1 APRIL 2022 TO 31 MARCH 2027

Item No

1. Relevant supplies of services of installing energy-saving materials in residential accommodation in England and Wales and Scotland.

2. Relevant supplies of energy-saving materials by a person who installs those materials in residential accommodation in England and Wales and Scotland.

NOTES:

Meaning of “energy-saving materials”

1. For the purposes of this Group “ energy saving materials ” means any of the following—

(a) insulation for walls, floors, ceilings, roofs or lofts or for water tanks, pipes or other plumbing fittings;

(b) draught stripping for windows and doors;

(c) central heating system controls (including thermostatic radiator valves);

(d) hot water system controls;

(e) solar panels;

(f) wind turbines;

(g) water turbines;

(h) ground source heat pumps;

(i) air source heat pumps;

(j) micro combined heat and power units;

(k) boilers designed to be fuelled solely by wood, straw or similar vegetal matter.

Meaning of “residential accommodation”

2. —(1) For the purposes of this Group “ residential accommodation ” means —

(a) a building, or part of a building, that consists of a dwelling or a number of dwellings;

(b) a building, or part of a building, used for a relevant residential purpose;

(c) a caravan used as a place of permanent habitation; or

(d) a houseboat.

(2) For the purposes of this Group “ use for a relevant residential purpose ” has the same meaning as it has for the purposes of Group 1 in Schedule 7A (see paragraph 7(1) of the Notes to that Group).

(3) In sub-paragraph (1)(d) “ houseboat ” has the meaning given by paragraph 7(3) of the Notes to Group 1 in Schedule 7A.

Meaning of “relevant supplies”

3. For the purposes of this Group “ relevant supplies ” means supplies made on or after 1 April 2022 and before 1 April 2027. .

Prospective

Installation of energy-saving materials: England and Wales and Scotland from 1 April 2027

F2 8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Alan Mak

Amanda Solloway

Two of the Lords Commissioners for Her Majesty’s Treasury

At 11.20 a.m. on 23rd March 2022

( 1 )

1994 c. 23 . Section 29A was inserted by section 99(4) of the Finance Act 2001 (c. 9) ; section 96(9) was amended by paragraph 5 of Schedule 31 to the Finance Act 2001.

( 2 )

Schedule 7A was inserted by section 99(5) of, and paragraph 1 of Schedule 31 to, the Finance Act 2001. Relevant amending instruments are S.I. 2002/1100 and 2019/958 .

Status: There are currently no known outstanding effects for the The Value Added Tax (Installation of Energy-Saving Materials) Order 2022.
The Value Added Tax (Installation of Energy-Saving Materials) Order 2022 (2022/361)
Version from: 1 May 2023

Displaying information

Status of this instrument

in force Provision is in force
in force* In force only for specified purposes (see footnote)
not in force Not in force in England (may be in force in other geographies, see footnotes)
defined term Defined term
dfn Defined term (alternative style)
footnote commentary transitional and savings in force status related provisions geo extent insert/omit source count in force adj
F1 Art. 3 omitted (1.5.2023) by virtue of The Value Added Tax (Installation of Energy-Saving Materials) Order 2023 (S.I. 2023/376) , arts. 1 , 5 omitted
F2 Art. 8 omitted (1.5.2023) by virtue of The Value Added Tax (Installation of Energy-Saving Materials) Order 2023 (S.I. 2023/376) , arts. 1 , 5 omitted
I1 Art. 1 in force at 1.4.2022, see art. 2
I2 Art. 2 in force at 1.4.2022, see art. 2
I3 Art. 4 in force at 1.4.2022, see art. 2
I4 Art. 5 in force at 1.4.2022, see art. 2
I5 Art. 6 in force at 1.4.2022, see art. 2
I6 Art. 7 in force at 1.4.2022, see art. 2
Defined Term Section/Article ID Scope of Application

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.

Contains public sector information licensed under the Open Government Licence v3.0.