Statutory Instruments

2024 No. 955

Infrastructure Planning

The Thurrock Flexible Generation Plant Consent (Amendment No. 2) Order 2024

Made

12th September 2024

Coming into force

13th September 2024

An application has been made, under paragraph 2 of Schedule 6 to the Planning Act 2008( 1 ), to the Secretary of State in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011( 2 ) (“ the 2011 Regulations ”) for a non-material change to the Thurrock Flexible Generation Plant Development Consent Order 2022( 3 ).

The Secretary of State, having considered the application, the responses to the publicity and consultation required by regulations 6 and 7 of the 2011 Regulations ( 4 ), has decided to make the change on terms that in the opinion of the Secretary of State are not materially different from those proposed in the application.

Accordingly, the Secretary of State, in exercise of the powers in paragraph 2(1) and (9) of Schedule 6 to the Planning Act 2008, makes the following Order:

Citation and commencement

Amendment to Schedule 1 (Authorised Development)

3. In Schedule 1 to the 2022 Order (Authorised Development), in the description of Work no. 1 in 1A replace at 1A(b) “up to 48 gas reciprocating engines” with “up to 96 gas reciprocating engines” .

Signed by authority of the Secretary of State for Energy Security and Net Zero

John Wheadon

Head of Energy Infrastructure Planning Delivery

Department for Energy Security and Net Zero

12th September 2024

( 1 )

2008 c. 29 . Paragraph 2 of Schedule 6 was amended by paragraph 4 of Schedule 8 to the Marine and Coastal Access Act 2009 (c. 23) , by paragraphs 1 and 72 of Schedule 13 to the Localism Act 2011 (c. 20) , and by section 28 of the Infrastructure Act 2015 (c. 7) . There are other amendments to the Act that are not relevant to this Order.

( 3 )

S.I. 2022/157 as amended by the Thurrock Flexible Generation Plant Consent (Amendment) Order 2023, S.I. 2023/289 .

( 4 )

S.I. 2011/2055 . Regulations 6 and 7 were both amended by S.I. 2012/635 and 2015/760 .

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Thurrock Flexible Generation Plant Consent (Amendment No. 2) Order 2024 (2024/955)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application
the 2022 Orderart. 2.legTermasY262N0

Status of changes to instrument text