🔆 📖 👤

Statutory Instruments

2025 No. 183

ELECTRICITY

The Electricity Capacity (Amendment) Regulations 2025

Made

13th February 2025

Coming into force

14th February 2025

The Secretary of State makes these Regulations in exercise of the powers conferred by sections 27(1) and (5), 28(1), (4)(e) and (f), 29(1), (2)(a) and (e), 36(1), (3) and (4)(d), and 40(1) of the Energy Act 2013 (“the Act”)(1).

The Secretary of State has before making these Regulations—

(a)

consulted the persons listed in section 40(2)(a) and (b) of the Act and such other persons as the Secretary of State considered it appropriate to consult;

(b)

in accordance with section 5(1)(d) had regard to the matters in section 5(2) of the Act.

In accordance with section 40(5) of the Act, a draft of this instrument was laid before Parliament and approved by a resolution of each House of Parliament.

Citation, commencement and extent

1.—(1) These Regulations may be cited as the Electricity Capacity (Amendment) Regulations 2025.

(2) These Regulations come into force on the day after the day on which they are made.

(3) These Regulations extend to England and Wales and Scotland.

Amendment of the Electricity Capacity Regulations 2014

2.The Electricity Capacity Regulations 2014(2) are amended in accordance with regulations 3 to 10.

Amendment to regulation 2 (interpretation)

3. In regulation 2(1)—

(a)in the definition of “a CFD”, after “the Act”, insert “or an investment contract under Schedule 2 to the Act”;

(b)after the definition of “interconnector CMU”, insert—

low emissions determination” has the meaning given in the Rules;.

Amendment to regulation 11 (meaning of auction parameters)

4. In regulation 11—

(a)in paragraph (1)(e), after “15 year minimum £/kW threshold” insert “, 9 year minimum £/kW threshold”;

(b)in paragraph (3)—

(i)for “In paragraph (1)”, substitute “In this regulation”;

(ii)for the definitions of “15 year minimum £/kW threshold” and “3 year minimum £/kW threshold” substitute—

3 year minimum £/kW threshold” means the minimum amount of capital expenditure per kilowatt of de-rated capacity which a bidder must commit to spending on a generating CMU or an unproven demand side response CMU that is not a three year zero capex threshold CMU to be eligible to bid for a capacity obligation for a period of 2 or 3 delivery years;

9 year minimum £/kW threshold” means the minimum amount of capital expenditure per kilowatt of de-rated capacity which a bidder must commit to spending on a declared low carbon CMU that is a new build CMU, a refurbishing CMU or an unproven demand side response CMU to be eligible to bid for a capacity obligation for a period of more than 3 and up to 9 delivery years;

15 year minimum £/kW threshold” means the minimum amount of capital expenditure per kilowatt of de-rated capacity which a bidder must commit to spending—

(a)

on a declared low carbon CMU that is a generating CMU or an unproven demand side response CMU to be eligible to bid for a capacity obligation for a period of more than 9 and up to 15 delivery years; or

(b)

on any other generating CMU or unproven demand side response CMU to be eligible to bid for a capacity obligation for a period of more than 3 and up to 15 delivery years;;

(iii) after the definition of “auction target capacity”, insert—

; and

“declared low carbon CMU”, “new build CMU”, “refurbishing CMU”, and “three year zero capex threshold CMU” have the meaning given in the Rules..

Amendment to regulation 16 (excluded capacity, low carbon support scheme CMUs)

5. For regulation 16(2), substitute—

(2)The Delivery Body must not prequalify CMU i if—

(a)the CFD counterparty has made an offer of a CFD in respect of the generating station that comprises or includes CMU i—

(i)under section 10(1) of the Energy Act 2013 (direction to offer to contract), and the CFD counterparty and an eligible generator have entered into that CFD; or

(ii)under regulation 10(1) of the Contracts for Difference (Standard Terms) Regulations 2014 (offer to contract) and an eligible generator has entered into that CFD; and

(b)that CFD has not expired or been terminated.

(2A)For the purposes of paragraph (2), a reference to an eligible generator entering into a CFD has the meaning given in regulation 10(3) of the Contracts for Difference (Standard Terms) Regulations 2014 (offer to contract)(3)..

Amendment to regulation 30 (capacity agreements)

6. In regulation 30(6), for “a capacity agreement”, substitute “once a capacity agreement takes effect in accordance with the Rules, it”.

Amendment to regulation 39 (determination of adjusted load-following capacity obligation, net output and adjusted net output)

7. In regulation 39(4), for “20”, substitute “34”.

Amendment to regulation 50 (reducing capacity payments: failure to demonstrate satisfactory performance)

8. In regulation 50(6)—

(a)before the definition of relevant month, insert—

extended performance” has the meaning given in the Rules;;

(b)in the definition of “satisfactory performance requirement”, after “demonstrate satisfactory performance days”, insert “or extend performance during a satisfactory performance day”.

Amendment to regulation 68 (delivery body reviewable decisions)

9. In the table in regulation 68(2), insert a row at the end, as follows—

A low emissions determinationThe capacity provider to whom the notice of the determination was given.

Amendment to regulation 70 (appeals to the Authority)

10. In regulation 70(4)(c), at the end, omit “and” and insert—

(ca)in the case of an appeal relating to a low emissions determination, a copy of—

(i)the notice setting out the determination; and

(ii)any notice that the Rules required to be given before the low emissions determination was made; and.

Hunt of Kings Heath

Minister of State for Energy Security and Net Zero

Department for Energy Security and Net Zero

13th February 2025

(2)

S.I. 2014/204; provisions amended by these Regulations are amended by S.I. 2015.875, 2016/742, 2020/697.

(3)

The Contracts for Difference (Standard Terms) Regulations 2014, S.I. 2014/2012; there are amending instruments but none is relevant.

(4)

See Capacity Market 2023: strengthening security of supply and alignment with net zero (Phase 1), at https://www.gov.uk/government/consultations/capacity-market-consultation-strengthening-security-of-supply-and-alignment-with-net-zero, and Capacity Market 2023: Phase 2 proposals and 10 year review, at https://www.gov.uk/government/consultations/capacity-market-2023-phase-2-proposals-and-10-year-review.

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Electricity Capacity (Amendment) Regulations 2025 (2025/183)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.