Statutory Instruments

2025 No. 779

Highways, England

The Oxfordshire County Council (Didcot to Culham Thames Bridge) Scheme 2022 Confirmation Instrument 2025

Made

30th June 2025

Coming into force in accordance with article 1

The Secretary of State for Transport, makes this Instrument in exercise of the powers conferred by section 106(3) of the Highways Act 1980(1) and now vested in the Secretary of State(2).

In accordance with section 107(1) and (2) of the Act, the Secretary of State has taken into consideration the reasonable requirements of navigation over the waters affected and includes such plans and specifications as necessary.

1. This Instrument may be cited as the Oxfordshire County Council (Didcot to Culham Thames Bridge) Scheme 2022 Confirmation Instrument 2025 and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.

2. The Oxfordshire County Council (Didcot to Culham Thames Bridge) Scheme 2022 (“ the Scheme ”) is hereby confirmed.

3. The Scheme as confirmed including its Schedule and plan is set out in the Schedule to this Instrument and copies of the Scheme with its accompanying plan are deposited at the offices of the Department for Transport, Deposited Documents Service, MHCLG, 1 Priory Square, Priory Street, Hastings, East Sussex, TN34 1EA and at the offices of Oxfordshire County Council, County Hall, Oxford OX1 1DJ.

Signed by Authority of the Secretary of State

Martin Gilmour

A Senior Civil Servant in the Department for Transport

30th June 2025

Article 3

THE SCHEDULE THE OXFORDSHIRE COUNTY COUNCIL (DIDCOT TO CULHAM THAMES BRIDGE) SCHEME 2022

The Oxfordshire County Council (hereinafter referred to as “ the Council ”) makes this Scheme in exercise of their powers under Section 106(3) of the Highways Act 1980 and of all other powers enabling them in that behalf.

1. The Council is authorised to construct over the navigable wates of the River Thames, the bridge specified in the Schedule to this Scheme as part of the highway which they are proposing to construct between the A4130 at Didcot in the south and the A415 at Culham in the north, in the Parishes of Sutton Courtenay and Culham, in the Districts of South Oxfordshire and the Vale of White Horse, in the County of Oxfordshire.

2. This Scheme may be cited as The Oxfordshire County Council (Didcot to Culham Thames Bridge) Scheme 2022.

Given under the common seal of the Council on the
21st day of December 2022
CS
THE COMMON SEAL OF OXFORDSHIRE 1423/22
COUNTY COUNCIL was hereunto affixed in the
presence of
Authorised Officer

Article 3

THE SCHEDULE TO THE SCHEME

Plans and Specifications of the Didcot to Culham Thames Bridge

The location and general design of the Didcot to Culham Thames Bridge are shown on the plan numbered RIV_PD-ACM-SBR-DGT_STR_ZZ_ZZ-DR-CB-0035 P02 marked “The Oxfordshire County Council (Didcot to Culham Thames Bridge) Scheme 2022”.

Points of Commencement and Termination

From a point 8.3 metres north of the north bank of the River Thames, whose co-ordinates are 451974.098E, 194504.657N, to a point 8.6 metres south of the south bank of the River Thames, whose co-ordinates are 451965.645E, 194440.209N. Ordnance Survey Grid reference SU519944.

Span

A single river span of 65 metres between the centre of the piers situated on the north and south banks of the River Thames.

Headway

The minimum headway is 4.7 metres, based on the proposed soffit level of 51.502 metres AOD, over the standard headwater level at Clifton Lock of 46.802 metres AOD.

Waterway

The existing minimum clear navigable waterway of 13 metres is maintained.

Overall Dimensions

The bridge will have an overall width of 17.9 metres and will from its east to west side carry a 0.5 metre wide parapet, a 2 metre wide footway, a 3 metre wide segregated two way cycleway, a 2 metre wide verge, a 9.3 metre wide single carriageway, a 0.6 metre wide verge, and a 0.5 metre wide parapet.

(1)

1980 c. 66. Section 106(3) is amended by section 1(6) of, paragraphs 1 and 34(1) and (2) of Schedule 1 to, the Infrastructure Act 2015 (c. 7).

(2)

S.I. 1981/238.

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Oxfordshire County Council (Didcot to Culham Thames Bridge) Scheme 2022 Confirmation Instrument 2025 (2025/779)
Version from: original only

Displaying information

Status of this instrument

in force Provision is in force
in force* In force only for specified purposes (see footnote)
not in force Not in force in England (may be in force in other geographies, see footnotes)
defined term Defined term
dfn Defined term (alternative style)
footnote commentary transitional and savings in force status related provisions geo extent insert/omit source count in force adj
Defined Term Section/Article ID Scope of Application
the Council para THE SCHEDULE def_ff04b4d6d2
The Oxfordshire County Council (Didcot to Culham Thames Bridge) Scheme 2022 para THE SCHEDULE TO THE SCHEME def_a868a63f48
the Scheme Unknown def_f8f09b9fea

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.

Contains public sector information licensed under the Open Government Licence v3.0.