Statutory Instruments
2003 No.845
OFFSHORE INSTALLATIONS
The Offshore Installations (Safety Zones) Order 2003
Made
24 March 2003
Coming into force
7 April 2003
The Secretary of State, in exercise of the powers conferred on him by section 22(1) and (2) of the Petroleum Act 1987( 1 ) (hereinafter referred to as “the Act”) and of all other powers enabling him in that behalf, and for the purpose of giving effect to proposals submitted to him by the Health and Safety Commission under section 24(2A) of the Act, hereby makes the following order:
Citation and commencement
1. This order may be cited as the Offshore Installations (Safety Zones) Order 2003 and shall come into force on 7th April 2003.
Establishment of safety zones
2. A safety zone is hereby established around each installation specified in column 1 of the Schedule hereto (being an installation stationed in waters to which subsection (7) of section 21 of the Act applies) having a radius of five hundred metres from the point as respects that installation which has the co-ordinates of latitude and longitude according to European Datum (1950) specified in columns 2 and 3 of the Schedule.
Amendment of the Offshore Installations (Safety Zones) (No. 2) Order 2002
3. In the Schedule to the Offshore Installations (Safety Zones) (No. 2) Order 2002( 2 )—
(a) in the entry relating to Madoes Production Manifold, for “01° 26.02− E” in column 3 there shall be substituted “01° 26.21− E”;
(b) in the entry relating to Mirren East Production Well—
(i) for “57° 18.5−” in column 2 there shall be substituted “57° 18.51−”; and
(ii) for “00° 54.66− E” in column 3 there shall be substituted “01° 54.66− E”;
(c) in the entry relating to Mirren West Production Well—
(i) for “57° 18.06−” in column 2 there shall be substituted “57° 18.65−”; and
(ii) for “01° 52.04− E” in column 3 there shall be substituted “01° 52.42− E”;
(d) in the entry relating to Galley G6 Well and Tree, for “00° 31.06− E” in column 3 there shall be substituted “00° 31.61− E”;
(e) in the entry relating to Drill Centre 4 (DC4), for “Block 211/13a” in column 1 there shall be substituted “Block 211/14”; and
(f) in the entry relating to Drill Centre 5 (DC5), for “Block 211/13a” in column 1 there shall be substituted “Block 211/14”.
Revocation of orders
4. The following orders are revoked—
(a) the Offshore Installations (Safety Zones) (No. 2) Order 1983( 3 );
(b) the Offshore Installations (Safety Zones) (No. 21) Order 1983( 4 ); and
(c) the Offshore Installations (Safety Zones) (No. 50) Order 1984( 5 ).
Signed by authority of the Secretary of State for Work and Pensions.
Nick Brown
Minister of State,
Department for Work and Pensions
24 th March 2003
Article 2
SCHEDULE SAFETY ZONES
(1) | (2) | (3) |
---|---|---|
Name or other designation of the offshore installation | Latitude North | Longitude East |
Jill Well 30/7a-12, Block 30/6, Jill-Julia Field | 56° 45.699− | 02° 18.712− |
Sycamore Main Manifold, Block 16/12a, Sycamore Field | 58° 32.49− | 01° 16.06− |
Sycamore Satellite Manifold, Block 16/12a, Sycamore Field | 58° 32.24− | 01° 15.43− |