Statutory Instruments

2006 No. 2375

town and country planning, england

The Town and Country Planning (General Development Procedure) (Amendment) (No. 2) (England) Order 2006

Made

4th September 2006

Laid before Parliament

8th September 2006

Coming into force

1st October 2006

The Secretary of State, in exercise of the powers conferred by sections 59, 61(1), 74(1)(c) and 333(7) of the Town and Country Planning Act 1990( 1 ) makes the following Order:

Citation, commencement, interpretation and application

1. —(1) This Order may be cited as the Town and Country Planning (General Development Procedure) (Amendment) (No. 2) (England) Order 2006 and shall come into force on 1st October 2006.

(2) In this Order, “the 1995 Order” means the Town and Country Planning (General Development Procedure) Order 1995( 2 ).

(3) This Order applies in relation to England only.

Amendment of the Town and Country Planning (General Development Procedure) Order 1995

2. —(1) The 1995 Order is amended as follows.

(2) In the table in article 10 (consultations before the grant of planning permission)

(a) for paragraph (p) substitute—

(p)

Development involving—

(i)

the carrying out of works or operations in the bed of, or within 20 metres of the top of a bank of, a main river which has been notified to the local planning authority by the Environment Agency as a main river for the purposes of this provision; or

(ii)

the culverting or control of flow of any river or stream

The Environment Agency

(b) after paragraph (zc) insert—

(zd)

Development, other than minor development, which is to be carried out on land—

(i)

in an area within Flood Zones 2 or 3; or

(ii)

in an area within Flood Zone 1 which has critical drainage problems and which has been notified for the purpose of this provision to the local planning authority by the Environment Agency

The Environment Agency
(ze) Any development of land of one hectare or more The Environment Agency .

(3) In article 10(2)—

(a) after subparagraph (g), insert—

(ga) in paragraph (p), “main river” has the same meaning as in section 113 of the Water Resources Act 1991 ( 3 ) ; ;

(b) after subparagraph (n), insert—

(o) in paragraph (zd)—

“Flood Zone 1” means land which has a less than a 1 in 1000 annual probability of river or sea flooding ( 4 ) ;

“Flood Zone 2” means land which has—

(i)

between a one in 100 and 1 in 1000 annual probability of river flooding; or

(ii)

between a one in 200 and 1 in 1000 annual probability of sea flooding;

“Flood Zone 3” means land which has—

(i)

a 1 in 100 or greater annual probability of river flooding; or

(ii)

a 1 in 200 or greater annual probability of sea flooding;

“minor development” means—

(i)

development of an existing dwelling-house, or development within the curtilage of such a dwelling-house, for any purpose incidental to the enjoyment of the dwelling-house as such;

(ii)

the extension of an existing building used for non-domestic purposes where the floorspace created by the development does not exceed 250 square metres; and

(iii)

the alteration of an existing building where the alteration does not increase the size of the building; and .

.

Transitional provision

3. The amendments made to the 1995 Order by article 2 do not apply in relation to any application made before 1st October 2006.

Signed by authority of the Secretary of State

Angela Smith

Parliamentary Under Secretary of State

Department for Communities and Local Government

4th September 2006

( 1 )

1990 c. 8 . The functions of the Secretary of State under the 1990 Act were, so far as exercisable in relation to Wales, transferred to the National Assembly for Wales by article 2 of the National Assembly for Wales (Transfer of Functions) Order 1999 ( S.I. 1999/672 ); see the entry in Schedule 1 for the 1990 Act.

( 2 )

S.I. 1995/419 . Relevant amendments were made by S.I. 2003/247 .

( 3 )

1991 c. 57 .

( 4 )

Maps showing the various Flood Zones are available from the Environment Agency at http://www.environment-agency.gov.uk .

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Town and Country Planning (General Development Procedure) (Amendment) (No. 2) (England) Order 2006 (2006/2375)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application
the 1995 Orderart. 1.the_1995_O_rt8IYi8
This instrument is derived from the version at www.legislation.gov.uk. To see a list of all amendments (including any to be made) check the resources page for this instrument on their website. Note, the status of this instrument is given above.
This instrument is derived from the version at www.legislation.gov.uk. To see original commencement information, check the resources page associated with this instrument. n.b. commencement information for marked amendments is embedded in the relevant footnote.

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.