🔆 📖 👤

Statutory Instruments

2024 No. 716 (C. 47)

PUBLIC PROCUREMENT

The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024

Made

22nd May 2024

The Minister for the Cabinet Office makes these Regulations in exercise of the powers conferred by sections 122(3)(c) and (d) and 127(2) of the Procurement Act 2023( 1 ).

These Regulations are made with the consent of the Welsh Ministers in accordance with section 127(3) of that Act.

Citation, extent and interpretation

1. —(1) These Regulations may be cited as the Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024.

(2) These Regulations extend to England and Wales, Scotland and Northern Ireland.

(3) In these Regulations—

the Act ” means the Procurement Act 2023;

the 2011 Regulations ” means the Defence and Security Public Contracts Regulations 2011( 2 );

the 2015 Regulations ” means the Public Contracts Regulations 2015( 3 );

the 2016 CC Regulations ” means the Concession Contract Regulations 2016( 4 );

the 2016 UC Regulations ” means the Utilities Contracts Regulations 2016( 5 ).

Provisions coming into force

2. —(1) Subsections (2), (3) and (4) of section 115 of the Act come into force the day after the day on which these Regulations are made.

(2) The provisions of the Act set out in the Schedule come into force on 24th February 2025 .

Saving provisions relating to the 2011 Regulations

3. —(1) Despite the revocation of the 2011 Regulations by section 119(1) of, and paragraph 4 of Schedule 11 to, the Act, those Regulations continue to apply in respect of procurement procedures, contracts and framework agreements in any of the circumstances described in paragraph (2).

(2) The circumstances are that, with reference to the 2011 Regulations, before 24th February 2025

(a) a contracting authority has awarded the contract or concluded the framework agreement;

(b) a contracting authority has sought offers in relation to a proposed Part B services contract or a framework agreement in respect of which only Part B services contracts can be based or awarded, other than one excluded by virtue of regulation 7 or 9, for any services referred to in sub-paragraph (c), (d) or (e) of regulation 6(1);

(c) a contracting authority has contacted an economic operator in order to commence the negotiated procedure without prior publication of a contract notice in accordance with regulations 16(1) and 18(1), (2), (9) and (10);

(d) a contracting authority using the restricted procedure has submitted a contract notice inviting requests to be selected to tender in accordance with regulation 17(2);

(e) a contracting authority using the negotiated procedure has submitted a contract notice inviting requests to be selected to negotiate in accordance with regulation 18(3);

(f) a contracting authority using the competitive dialogue procedure has submitted a contract notice inviting requests to participate in accordance with regulation 19(4).

(3) Where the 2011 Regulations continue to apply in accordance with paragraph (1), the Act does not apply.

(4) Terms used in this regulation have the same meaning as in the 2011 Regulations( 6 ) as they had effect immediately before 24th February 2025 .

Transitional provisions relating to repeat services or works under a contract awarded under the 2011 Regulations

4. —(1) This regulation applies for the purposes of determining whether a contracting authority may award a public contract directly under section 41 of the Act (direct award in special cases) in a case where—

(a) the public contract concerns the supply of services or works by the existing supplier that are a repetition of existing services or works, and

(b) the existing services or works were supplied under a contract or framework agreement that was awarded in accordance with the 2011 Regulations.

(2) The direct award justification in paragraph 8 of Schedule 5 to the Act (direct award justifications) has effect as if—

(a) in the words before paragraph (a), “goods,”, in each place it occurs, were omitted,

(b) in paragraph (a)—

(i) “goods,” and “public” were omitted, and

(ii) for “in accordance with a competitive tendering procedure” there were substituted “otherwise than in accordance with regulation 16 of the Defence and Security Public Contracts Regulations 2011 ,

(c) for paragraph (b) there were substituted—

(b) a contract notice in respect of that earlier contract or framework agreement contained a statement complying with the requirements of regulation 16(6)(a) of the Defence and Security Public Contracts Regulations 2011. , and

(d) in paragraph 9 of that Schedule—

(i) for “paragraphs 7 and” there were substituted “paragraph” , and

(ii) “goods,” in each place it occurs in the first definition, and where it occurs in the second definition, were omitted.

(3) In paragraph (1)—

existing services or works ” means services or works already supplied, or contracted to be supplied, to the contracting authority;

existing supplier ” means the supplier that has already supplied, or contracted to supply, the existing services or works.

Saving provisions relating to the 2015 Regulations

5. —(1) Despite the revocation of the 2015 Regulations by section 119(1) of, and paragraph 5 of Schedule 11 to, the Act, those Regulations continue to apply, as modified by paragraph (4)(b) and (c), in respect of procurement procedures, contracts, framework agreements and dynamic purchasing systems in any of the circumstances described in paragraphs (2) and (3).

(2) The circumstances in this paragraph are that, with reference to the 2015 Regulations, before 26th May 2023, a sub-central contracting authority submitted for publication in accordance with regulation 51 (publication on the UK e-notification service) a prior information notice as a call for competition in accordance with regulation 26(9).

(3) The circumstances in this paragraph are that, with reference to the 2015 Regulations, before 24th February 2025

(a) a contracting authority has awarded the contract, concluded the framework agreement or established the dynamic purchasing system;

(b) a contracting authority has contacted an economic operator in order to commence the negotiated procedure without prior publication in any of the specific cases and circumstances set out in regulation 32;

(c) either—

(i) a contract notice required by regulation 26(8) or 75(1)(a) (publication of notices: public contracts for social and other specific services), or

(ii) a contest notice required by regulation 79 (notices)

has been submitted for publication in accordance with regulation 51;

(d) a contracting authority has had published on the UK e-notification service a voluntary transparency notice expressing its intention to enter into a contract in accordance with regulation 99(3)(b) (grounds for ineffectiveness: one of the conditions for the non-application of the first ground);

(e) a contracting authority has published information about a contract award opportunity on Contracts Finder in accordance with regulation 110(2) (publication of contract award opportunities on Contracts Finder).

(4) Where the 2015 Regulations continue to apply in accordance with paragraph (1)—

(a) the Act does not apply;

(b) the period of validity of a dynamic purchasing system under regulation 34 of those Regulations—

(i) may not be changed after 23rd February 2026 , and

(ii) expires (if it has not already done so) at the end of 23rd February 2029 ;

(c) regulation 113 of those Regulations (payment of undisputed invoices within 30 days by contracting authorities, contractors and subcontractors) is to be read as if—

(i) in paragraph (7), in the words before sub-paragraph (a)—

(aa) for “Every financial year” there were substituted “In every period, the first being the period beginning with 24th February 2025 and ending with 30th September 2025 and subsequent periods being each subsequent successive period of six months” , and

(bb) after “preceding”, for “financial year” there were substituted “period” ,

(ii) in paragraph (8)(b), for “financial year” there were substituted “period” , and

(iii) in paragraph (11), the definition of “financial year” were omitted.

(5) Terms used in this regulation have the same meaning as in the 2015 Regulations( 7 ) as they had effect immediately before 24th February 2025 .

Transitional provisions relating to repeat services or works supplied under a contract awarded under the 2015 Regulations

6. —(1) This regulation applies for the purposes of determining whether a contracting authority may award a public contract directly under section 41 of the Act (direct award in special cases) in a case where—

(a) the public contract concerns the supply of services or works by the existing supplier that are similar to existing services or works, and

(b) the existing services or works were supplied under a public contract or framework agreement that was awarded in accordance with the 2015 Regulations.

(2) The direct award justification in paragraph 8 of Schedule 5 to the Act (direct award justifications) has effect as if—

(a) in the words before paragraph (a), “goods,”, in each place it occurs, were omitted,

(b) in paragraph (a)—

(i) “goods,” were omitted, and

(ii) for “a competitive tendering procedure” there were substituted regulation 26(1) and (2) of the Public Contracts Regulations 2015 ,

(c) for paragraph (b) there were substituted—

(b) there was a disclosure as soon as that earlier contract was put up for tender that met the requirements of regulation 32(11) of the Public Contracts Regulations 2015. , and

(d) in paragraph 9 of that Schedule—

(i) for “paragraphs 7 and” there were substituted “paragraph” , and

(ii) “goods,” in each place it occurs in the first definition, and where it occurs in the second definition were omitted.

(3) In paragraph (1)—

existing services or works ” means services or works already supplied, or contracted to be supplied, to the contracting authority;

existing supplier ” means the supplier that has already supplied, or contracted to supply, the existing services or works.

Saving provisions relating to the 2016 CC Regulations

7. —(1) Despite the revocation of the 2016 CC Regulations by section 119(1) of, and paragraph 6 of Schedule 11 to, the Act, those Regulations continue to apply in respect of procurement procedures and contracts where, with reference to those Regulations, before 24th February 2025 , a contracting authority has—

(a) awarded the contract, or

(b) submitted—

(i) a concession notice required by regulation 31(1), or

(ii) a prior information notice required by regulation 31(3),

for publication in accordance with regulation 33(1) (form and manner of publication of notices).

(2) Where the 2016 CC Regulations continue to apply in accordance with paragraph (1), the Act does not apply.

(3) Terms used in paragraph (1) have the same meaning as in the 2016 CC Regulations( 8 ) as they had effect immediately before 24th February 2025 .

Saving provisions relating to the 2016 UC Regulations

8. —(1) Despite the revocation of the 2016 UC Regulations by section 119(1) of, and paragraph 7 of Schedule 11 to, the Act, those Regulations continue to apply in respect of procurement procedures, contracts, framework agreements and dynamic purchasing systems in any of the circumstances described in paragraphs (2) and (3).

(2) The circumstances in this paragraph are that, with reference to the 2016 UC Regulations, before 26th May 2023, a utility submitted for publication in accordance with regulation 71 (publication on the UK e-notification service) a periodic indicative notice as a call for competition in accordance with regulation 44(4)(a)( 9 ).

(3) The circumstances in this paragraph are that, with reference to the 2016 UC Regulations, before 24th February 2025

(a) a utility has awarded the contract, concluded the framework agreement or established the dynamic purchasing system;

(b) a utility has contacted an economic operator in respect of a proposed contract to which regulation 33 (contracts subject to special arrangements) applies;

(c) a utility has contacted an economic operator to commence the negotiated procedure without prior call for competition in any of the cases set out in regulation 50 (use of the negotiated procedure without prior call for competition);

(d) one of the following notices has been submitted for publication in accordance with regulation 71(1) (publication on the UK e-notification service)

(i) a notice on the existence of a qualification system required by regulation 68;

(ii) a contract notice required by regulation 69;

(iii) a contest notice required by regulation 95.

(4) Where the 2016 UC Regulations continue to apply in accordance with paragraph (1)—

(a) the Act does not apply;

(b) the period of validity of a dynamic purchasing system under regulation 52 of the 2016 UC Regulations

(i) may not be changed after 23rd February 2026 , and

(ii) expires (if it has not already done so) at the end of 23rd February 2029 ;

(c) the period of validity of a qualification system under regulation 68 of the 2016 UC Regulations

(i) may not be changed after 23rd February 2026 , and

(ii) expires (if it has not already done so) at the end of 23rd February 2029 .

(5) Terms used in this regulation have the same meaning as in the 2016 UC Regulations( 10 ) as they had effect immediately before 24th February 2025 .

Transitional provisions relating to repeat services or works previously supplied under a contract awarded under the 2016 UC Regulations

9. —(1) This regulation applies for the purposes of determining whether a contracting authority may award a public contract directly under section 41 of the Act (direct award in special cases) in a case where—

(a) the public contract concerns the supply of services or works by the existing supplier that are similar to existing services or works, and

(b) the existing services or works were supplied under a public contract of framework agreement that was awarded in accordance with the 2016 UC Regulations.

(2) The direct award justification in paragraph 8 of Schedule 5 to the Act (direct award justifications) has effect as if—

(a) in the words before paragraph (a), “goods,”, in each place it occurs, were omitted,

(b) in paragraph (a)—

(i) “goods,” were omitted;

(ii) for “a competitive tendering procedure” there were substituted regulation 44(1) and (2) of the Utilities Contracts Regulations 2016 ,

(c) for paragraph (b) there were substituted—

(b) there was a disclosure as soon as that earlier contract was put up for tender that met the requirements of regulation 50(4)(b) of the Utilities Contracts Regulations 2016. , and

(d) in paragraph 9 of that Schedule—

(i) for “paragraphs 7 and” there were substituted “paragraph” , and

(ii) “goods,”, in each place it occurs in the first definition, and where it occurs in the second definition, were omitted.

(3) In paragraph (1)—

existing services or works ” means services or works already supplied, or contracted to be supplied, to the utility;

existing supplier ” means the supplier that has already supplied, or contracted to supply, the existing services or works.

Alex Burghart

Parliamentary Secretary

Cabinet Office

22nd May 2024

Regulation 2(2)

Schedule Provisions of the Procurement Act 2023 coming into force on 24th February 2025

( 1 )

2023 c. 54 . For the meaning of “Minister of the Crown”, see section 123(1) and the definition in the Ministers of the Crown Act 1975 (c. 26) to which that provision cross-refers.

( 6 )

For the meaning of “competitive dialogue procedure”, “contract notice”, “framework agreement”, “negotiated procedure”, “Part B services contract” and “restricted procedure”, see regulation 3(1) to (3), for the meaning of “contracting authority”, see regulation 4, and for the meaning of “economic operator”, see regulation 5(1) of the 2011 Regulations.

( 7 )

For the meaning of “call for competition”, “contest notice”, “contract notice”, “contracting authority”, “Contracts Finder”, “dynamic purchasing system”, “economic operator”, “framework agreement”, “negotiated procedure” and “sub-central contracting authority”, see regulation 2(1) of the 2015 Regulations. For the meaning of “contract award opportunity”, “the UK e-notification service” and “voluntary transparency notice”, see, respectively, regulations 110(6), 51(5) and 99(4) (as amended by S.I. 2020/1319 ), of those Regulations.

( 8 )

For the meaning of ”prior information notice”, see regulation 2(1) of the 2016 CC Regulations. For the meaning of “concession notice” and “contracting authority” see, respectively, regulations 6 and 4 of those Regulations.

( 9 )

Regulation 44(4)(a) was revoked by S.I. 2023/484 and by S.I. 2023/567 (W. 88) . For transitional provisions, see regulation 5 of each S.I.

( 10 )

For the meaning of “call for competition”, “contest notice”, “contract notice”, “dynamic purchasing system”, “economic operator”, “framework agreement”, “periodic indicative notice” and “utilities”, see regulation 2(1) of the 2016 UC Regulations. For the meaning of “UK e-notification service”, see regulation 71(6) of those Regulations and regulation 51(5) of the 2015 Regulations. For the meaning of “negotiated procedure” and “qualification system”, see regulation 2(2) of the 2016 Regulations.

Status: There are currently no known outstanding effects for the The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024.
The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 (2024/716)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
F1Words in reg. 2(2) substituted (17.9.2024) by The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) (Amendment) Regulations 2024 (S.I. 2024/959) , regs. 1(2) , 2(2)substituted
F2Words in reg. 3 substituted (17.9.2024) by The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) (Amendment) Regulations 2024 (S.I. 2024/959) , regs. 1(2) , 2(3)substituted
F3Words in reg. 5 substituted (17.9.2024) by The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) (Amendment) Regulations 2024 (S.I. 2024/959) , regs. 1(2) , 2(4)(a)substituted
F4Words in reg. 5(4)(b)(i) substituted (17.9.2024) by The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) (Amendment) Regulations 2024 (S.I. 2024/959) , regs. 1(2) , 2(4)(b)substituted
F5Words in reg. 5(4)(b)(ii) substituted (17.9.2024) by The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) (Amendment) Regulations 2024 (S.I. 2024/959) , regs. 1(2) , 2(4)(c)substituted
F6Words in reg. 5(4)(c)(i)(aa) substituted (17.9.2024) by The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) (Amendment) Regulations 2024 (S.I. 2024/959) , regs. 1(2) , 2(4)(d)substituted
F7Words in reg. 7 substituted (17.9.2024) by The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) (Amendment) Regulations 2024 (S.I. 2024/959) , regs. 1(2) , 2(5)substituted
F8Words in reg. 8 substituted (17.9.2024) by The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) (Amendment) Regulations 2024 (S.I. 2024/959) , regs. 1(2) , 2(6)(a)substituted
F9Words in reg. 8 substituted (17.9.2024) by The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) (Amendment) Regulations 2024 (S.I. 2024/959) , regs. 1(2) , 2(6)(b)substituted
F10Words in reg. 8 substituted (17.9.2024) by The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) (Amendment) Regulations 2024 (S.I. 2024/959) , regs. 1(2) , 2(6)(c)substituted
F11Words in Sch. heading substituted (17.9.2024) by The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) (Amendment) Regulations 2024 (S.I. 2024/959) , regs. 1(2) , 2(7)(a)substituted
F12Words in Sch. inserted (17.9.2024) by The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) (Amendment) Regulations 2024 (S.I. 2024/959) , regs. 1(2) , 2(7)(b)inserted
F13Word in Sch. substituted (17.9.2024) by The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) (Amendment) Regulations 2024 (S.I. 2024/959) , regs. 1(2) , 2(7)(c)substituted
I1Reg. 1 in force at made date
I2Reg. 2 in force at made date
I3Reg. 3 in force at made date
I4Reg. 4 in force at made date
I5Reg. 5 in force at made date
I6Reg. 6 in force at made date
I7Reg. 7 in force at made date
I8Reg. 8 in force at made date
I9Reg. 9 in force at made date
I10Sch. in force at made date
Defined TermSection/ArticleIDScope of Application
existing services or worksreg. 4.legTermqvsVCQls
existing services or worksreg. 6.legTermli8YIGTJ
existing services or worksreg. 9.legTermE32I4lln
existing supplierreg. 4.legTermIMriyWaQ
existing supplierreg. 6.legTermoHrfW3mC
existing supplierreg. 9.legTermEI16Uvk9
the 2011 Regulationsreg. 1.legTermKkCfHJB2
the 2015 Regulationsreg. 1.legTermdZPBi8rv
the 2016 CC Regulationsreg. 1.legTerm9HM7mloX
the 2016 UC Regulationsreg. 1.legTermuziOCu2o
the Actreg. 1.legTermNJFCWAeX
Changes that affect Made by
Sort descending by Changed Legislation Sort descending by Year and Number Changed Provision Type of effect Sort descending by Affecting Legislation Title Sort descending by Year and Number Affecting Provision Sort descending by Changes made to website text Note
The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 reg. 1 coming into force The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 Yes
The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 reg. 2 coming into force The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 Yes
The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 reg. 3 coming into force The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 Yes
The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 reg. 4 coming into force The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 Yes
The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 reg. 5 coming into force The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 Yes
The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 reg. 6 coming into force The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 Yes
The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 reg. 7 coming into force The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 Yes
The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 reg. 8 coming into force The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 Yes
The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 reg. 9 coming into force The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 Yes
The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 Sch. coming into force The Procurement Act 2023 (Commencement No. 3 and Transitional and Saving Provisions) Regulations 2024 2024 No. 716 Yes

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.