πŸ”† πŸ“– βž• πŸ‘€

Statutory Instruments

2014 No. 1293

Electricity

Gas

The Electricity and Gas Appeals (Designation and Exclusion) Order 2014

Made

19th May 2014

Laid before Parliament

27th May 2014

Coming into force

18th June 2014

This Order is made in exercise of the powers conferred by section 173(2)(b), (d) and (7) of the Energy Act 2004( 1 ).

The Secretary of State, in accordance with the requirements of section 173(6) of that Act, has consulted the Gas and Electricity Markets Authority( 2 ) and such other persons as the Secretary of State considers appropriate.

Accordingly the Secretary of State makes the following Order:

Citation, commencement, extent and application

1. β€”(1) This Order may be cited as the Electricity and Gas Appeals (Designation and Exclusion) Order 2014 and comes into force on 18th June 2014.

(2) This Order does not extend to Northern Ireland.

(3) This Order applies to appeals under section 173 of the Act( 3 ) from decisions made by GEMA on or after the date on which this Order comes into force.

Interpretation

2. β€”(1) In this Orderβ€”

β€œthe Act” means the Energy Act 2004;

β€œdistribution licence” means a licence granted under section 6(1)(c) of the Electricity Act 1989( 4 );

β€œelectricity supply licence” means a licence granted under section 6(1)(d) of the Electricity Act 1989( 5 );

β€œgas supply licence” means a licence granted under section 7A of the Gas Act 1986( 6 );

β€œsmart meter communication licences” meansβ€”

(a)

the licence granted to Smart DCC Limited( 7 ) on 20th September 2013 under section 7AB(2) of the Gas Act 1986( 8 ); and

(b)

the licence granted to Smart DCC Limited on 20th September 2013 under section 6(1A) of the Electricity Act 1989( 9 );

β€œtransmission licence” means a licence granted under section 6(1)(b) of the Electricity Act 1989( 10 );

β€œtransportation licence” means a licence granted under section 7(2) of the Gas Act 1986( 11 ).

(2) Subject to paragraph (3), a reference in this Order toβ€”

(a) a Standard Condition or a Standard Special Condition of a licence, or

(b) a document designated by this Order,

is to the version current at the date on which this Order comes into force.

(3) At the time of any appeal under section 173 of the Act, the references mentioned in paragraph (2) are to the version of those conditions or documents current at the time of the decision by GEMA which is the subject of the appeal.

Designation of documents

3. The following documents are designated for the purposes of section 173 of the Actβ€”

(a) the Balancing and Settlement Code, being the document of that title required to be prepared pursuant to Standard Condition C3 of a transmission licence( 12 );

(b) the Connection and Use of System Code, being the document of that title required to be prepared pursuant to Standard Condition C10 of a transmission licence;

(c) the Network Code, being the document of that title required to be prepared pursuant to Standard Special Condition A11 of a transportation licence( 13 );

(d) the Uniform Network Code, being the document of that title required to be prepared pursuant to Standard Special Condition A11 of a transportation licence;

(e) the Uniform Network Code, being the document of that title required to be prepared pursuant to Standard Condition 9 of a transportation licence( 14 );

(f) the Supply Point Administration Agreement, being the document of that title required to be entered into pursuant to Standard Condition 30 of a gas supply licence( 15 );

(g) the Master Registration Agreement, being the document of that title required to be entered into pursuant to Standard Condition 11 of an electricity supply licence( 16 );

(h) the Distribution Connection and Use of System Agreement , being the document of that title referred to in Standard Condition 22 of a distribution licence( 17 );

(i) the Smart Energy Code, being the document of that title required to be maintained and in force pursuant to Condition 21 of smart meter communication licences( 18 ).

Exclusions

4. β€”(1) A right of appeal under section 173 of the Act is excluded in respect of a decision by GEMA relating to a document designated by article 3 ifβ€”

(a) in the case of a decision falling within any of articles 5 to 13, the condition specified for that decision is satisfied; or

(b) GEMA determines that the delay caused by the holding of the appeal against that decision is likely to have a material adverse effect on the availability of electricity or gas for meeting the reasonable demands of consumers in Great Britain.

(2) Where GEMA makes a determination under paragraph (1)(b), it must give notice of the determination in such manner as it considers appropriate for the purpose of bringing it to the attention of persons likely to be interested in it.

Balancing and Settlement Code

(2) In this article, the words β€œPanel” and β€œModification Report” have the same meanings as in the Balancing and Settlement Code.

Connection and Use of System Code

(2) In this articleβ€”

(a) β€œmajority recommendation” means a recommendation that is supported by the majority of those views of Panel Members which, in the reasonable opinion of GEMA, are clearly expressed in the Modification Report; and

(b) the words β€œPanel Members” and β€œModification Report” have the same meanings as in the Connection and Use of System Code.

Network Code

7. β€”(1) For a decision relating to the Network Code, the specified condition is that the decision accords with a majority recommendation made by the Modification Panel in the Modification Report.

(2) In this article, the words β€œModification Panel” and β€œModification Report” have the same meanings as in the Uniform Network Code designated by article 3(d) .

Uniform Network Code required under transportation licence Standard Special Conditions

(2) In this article, the words β€œModification Panel” and β€œModification Report” have the same meanings as in the Uniform Network Code designated by article 3(d) .

Uniform Network Code required under transportation licence Standard Conditions

9. β€”(1) For a decision relating to the Uniform Network Code designated by article 3(e), the specified condition is that the decision is to give consent to the recommendation by the Panel Majority in respect of a proposed modification in a Final Modification Report.

(2) In this article, the words β€œFinal Modification Report” and β€œPanel Majority” have the same meaning as in the Uniform Network Code designated by article 3(e).

Supply Point Administration Agreement

(2) In this article, the words β€œChange Proposal” have the same meaning as in the Supply Point Administration Agreement.

Master Registration Agreement

(2) In this article, the words β€œMEC” and β€œChange Procedures” have the same meanings as in the Master Registration Agreement.

Distribution Connection and Use of System Agreement

(2) In this article, the words β€œParties” and β€œVoting Procedure” have the same meaning as in the Distribution Connection and Use of System Agreement.

Smart Energy Code

13. β€”(1) For a decision relating to the Smart Energy Code, the specified condition is that the decision accords withβ€”

(a) a recommendation by the relevant body in respect of a Path 1 Modification or a Path 2 Modification; or

(b) a decision by the Panel in respect of a Path 3 Modification.

(2) In paragraph (1)(a) , β€œrelevant body” meansβ€”

(a) the Change Board where, in accordance with section D8.1 of the Smart Energy Code, the Change Board has been established; or

(b) the Panel where, in accordance with section X2.3(d) of the Smart Energy Code, the Change Board has not been established and the Panel is performing the functions of the Change Board.

(3) In this article, the words β€œPanel”, β€œPath 1 Modification”, β€œPath 2 Modification”, β€œPath 3 Modification” and β€œChange Board” have the same meaning as in section A1 of the Smart Energy Code.

Revocation and transitional provision

14. β€”(1) The Orders listed in the Schedule are revoked, subject to the transitional provision in paragraph (2).

(2) The Orders listed in the Schedule continue to have effect in relation to any appeal under section 173 of the Act from a decision made by GEMA before the date on which this Order comes into force.

Verma

Parliamentary Under Secretary of State

Department of Energy and Climate Change

19th May 2014

Article 14

SCHEDULE

Orders revoked Reference
1 The Electricity and Gas Appeals (Designation and Exclusion) Order 2005 S.I. 2005/1646
2 The Electricity and Gas Appeals (Designation and Exclusion) Order 2009 S.I. 2009/648
3 The Electricity and Gas Appeals (Designation and Exclusion) Order 2013 S.I. 2013/2429
( 1 )

2004 c. 20 .

( 2 )

The Gas and Electricity Markets Authority, referred to as β€œGEMA” in accordance with section 196(1) of the Energy Act 2004, was established by section 1 of the Utilities Act 2000 (c.27) .

( 3 )

Section 173 has been amended by paragraphs 101 and 102 of Schedule 6 to the Enterprise and Regulatory Reform Act 2013 (c. 24) and section 81(4) of the Energy Act 2011 (c. 16) .

( 4 )

1989 c. 29 . Section 6 was substituted by section 30 of the Utilities Act 2000, and subsection (1)(c) was amended by Part 1 of Schedule 23 to the Energy Act 2004.

( 5 )

Section 6(1)(d) was amended by S.I. 2012/2400 .

( 6 )

1986 c. 44 . Section 7A was inserted by section 6(1) of the Gas Act 1995 (c. 45) ; amended by section 149 of the Energy Act 2004 and Schedule 8 to the Utilities Act 2000; and modified by section 3(2) of, and paragraphs 1 and 2 of Schedule 6 to the Utilities Act 2000.

( 7 )

A company registered in England and Wales with company number 08641679.

( 8 )

1986 c. 44 . Section 7AB was inserted by S.I. 2012/2400 . A smart meter communication licence authorises the carrying out of a smart meter communication service, which has the meaning given by section 5(11) of the Gas Act 1986; section 5 was substituted by section 3(1) of the Gas Act 1995, and subsection (11) was inserted by S.I. 2014/2400 .

( 9 )

1989 c. 29 . Section 6 was substituted by section 30 of the Utilities Act 2000. Subsection (1A) was inserted by S.I. 2012/2400 . A smart meter communication licence authorises the carrying out of a smart meter communication service within the meaning of section 4(3G) of the Electricity Act 1989; subsection (3G) was inserted by S.I. 2012/2400 .

( 10 )

Subsection (1)(b) was substituted by section 136(1) of the Energy Act 2004.

( 11 )

Section 7 was substituted by section 5 of the Gas Act 1995. Subsection (2) was amended by section 76 of, and paragraphs 1 and 4 of Schedule 6 to, the Utilities Act 2000 and by S.I. 2011/2704 ; and modified by section 3(2) of the Utilities Act 2000.

( 13 )

A consolidated version of the standard special conditions for a transportation licence can be found here: https://epr.ofgem.gov.uk//Content/Documents/Standard%20Special%20Condition%20-%20PART%20A%20Consolidated%20-%20Current%20Version.pdf .

( 14 )

A consolidated version of the standard conditions for a transportation licence can be found here: https://epr.ofgem.gov.uk//Content/Documents/Gas_transporter_SLCs_consolidated%20-%20Current%20Version.pdf .

( 15 )

A consolidated version of the standard conditions for a gas supply licence can be found here: https://epr.ofgem.gov.uk//Content/Documents/Gas%20supply%20standard%20licence%20conditions%20consolidated%20-%20Current%20Version.pdf .

( 16 )

A consolidated version of the standard conditions for an electricity supply licence can be found here: https://epr.ofgem.gov.uk//Content/Documents/Electricity%20Supply%20Standard%20Licence%20Conditions%20Consolidated%20-%20Current%20Version.pdf .

( 17 )

A consolidated version of the standard conditions for a distribution licence can be found here: https://epr.ofgem.gov.uk//Content/Documents/Electricity%20Distribution%20Consolidated%20Standard%20Licence%20Conditions%20-%20Current%20Version.pdf .

( 18 )

The Smart Energy Code came into force on 23rd September 2013 and is available at www.gemserv.com .

Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
The Electricity and Gas Appeals (Designation and Exclusion) Order 2014 (2014/1293)

Displaying information

Status of this instrument

footnotecommentarytransitional and savingsin force statusrelated provisionsgeo extentinsert/omitsource countin force adj
Defined TermSection/ArticleIDScope of Application
Change Boardart. 13.Change_Boa_rttnYtJ
Change Proceduresart. 11.Change_Pro_rtULqta
Change Proposalart. 10.Change_Pro_rt3iMzR
distribution licenceart. 2.distributi_rtkOIDv
electricity supply licenceart. 2.electricit_rtQTfz5
Final Modification Reportart. 9.Final_Modi_rtj6c3I
gas supply licenceart. 2.gas_supply_rtw1upJ
majority recommendationart. 6.majority_r_rtSypdo
MECart. 11.MEC_rtJJP9J
Modification Panelart. 7.Modificati_rtQpB6M
Modification Panelart. 8.Modificati_rtkXcgm
Modification Reportart. 5.Modificati_rtXrSr4
Modification Reportart. 6.Modificati_rtwues2
Modification Reportart. 7.Modificati_rtOYMFt
Modification Reportart. 8.Modificati_rtGyhQH
Panelart. 13.Panel_rtcO4k8
Panelart. 5.Panel_rtWLjCN
Panel Majorityart. 9.Panel_Majo_rtHOMpF
Panel Membersart. 6.Panel_Memb_rtTbDwh
Partiesart. 12.Parties_rtDMbPl
Path 1 Modificationart. 13.Path_1_Mod_rtXTtDH
Path 2 Modificationart. 13.Path_2_Mod_rtMZaXf
Path 3 Modificationart. 13.Path_3_Mod_rtOjqdS
relevant bodyart. 13.relevant_b_rtRDcc2
smart meter communication licencesart. 2.smart_mete_rtdOmNx
the Actart. 2.the_Act_rt7IsYJ
transmission licenceart. 2.transmissi_rtQ0x0c
transportation licenceart. 2.transporta_rtfRk7X
Voting Procedureart. 12.Voting_Pro_rtpE8tq
This instrument is derived from the version at www.legislation.gov.uk. To see a list of all amendments (including any to be made) check the resources page for this instrument on their website. Note, the status of this instrument is given above.
This instrument is derived from the version at www.legislation.gov.uk. To see original commencement information, check the resources page associated with this instrument. n.b. commencement information for marked amendments is embedded in the relevant footnote.

Status of changes to instrument text

The list includes made instruments, both those in force and those yet to come into force. Typically, instruments that are not yet in force (hence their changes are not incorporated into the text above) are indicated by description 'not yet' in the changes made column.