Summary
Under the former section 70(3) of the Arbitration Act 1996, the 28-day period for challenging an arbitral appeal award ran from its date where that award was not itself subject to further arbitral appeal or review. The notification-based exception concerned an appeal or review of the particular award under challenge. Delayed receipt created no entitlement to a fresh 28-day period; an extension depended on the circumstances, including reasonable use of the time remaining. An order striking out an out-of-time section 69 claim was made under section 80(5). The Court of Appeal could grant permission to appeal that order. The restrictions governing decisions granting or refusing permission to appeal an award, and decisions on a substantive appeal, did not encompass that strike-out order.
Factual background
JSC "Kazan Oil Plant", a Russian seller, contracted to supply sunflower oil to Aves Trade DMCC, the buyer. The contract provided for English law and arbitration under FOSFA rules. A first-tier tribunal awarded damages against the seller for non-delivery. On an arbitral appeal, the FOSFA Board of Appeal upheld liability but reduced the damages.
The appeal award was dated 26 March 2025. Difficulties arising from sanctions delayed payment of the fees required for its release, and the seller received it on 10 April. The seller commenced proceedings under section 69 of the Arbitration Act 1996 on 8 May, 28 days after receipt but 43 days after the award's date. Bright J struck out the claim as late and refused an extension of time: [2025] EWHC 2713 (Comm).
Following the judge's refusal of permission to appeal, the Court of Appeal considered permission and the substantive appeal together. The issues were whether it could grant permission to appeal the strike-out order, whether time ran from the appeal award's date or notification, and whether an extension should have been granted.
Held
Permission to appeal was granted on both grounds, but the appeal was dismissed unanimously. Phillips LJ gave the leading judgment, with which Miles and Moylan LJJ agreed.
The Court of Appeal had jurisdiction to grant permission to appeal the strike-out order for two independent but overlapping reasons. First, section 70(3) of the Arbitration Act 1996 prescribed a time limit without conferring a power to strike out. That power arose through section 80(5), which imported the procedural consequences of non-compliance, including CPR 3.4(2)(c). The order followed both the determination of the time limit and the refusal of an extension. Applying Peel v Coln Park LLP, an appeal against that order was unrestricted by the Act's special permission requirements (paras 42–46).
Secondly, section 69 distinguished applications for permission from substantive appeals. Section 69(8) applied only after permission to appeal the award had been granted. Section 69(6) covered decisions granting or refusing permission, and could not encompass an order striking out the claim. By choosing strike-out rather than refusing permission, the judge made an order outside section 69(6). The position concerning out-of-time challenges under sections 67 and 68 was left open (paras 47–51).
Under the applicable section 70(3), the notification-based exception concerned an arbitral appeal or review of the award being challenged. It did not apply merely because that award resulted from an appeal against an earlier award. This construction promoted certainty and protected access to the court while parties exhausted arbitral remedies. Those remedies might end without a further award, including through administrative dismissal. Time therefore ran from the appeal award's date, and the claim was late (paras 52–64).
An extension under section 80(5) involved the fact-sensitive discretion described in Kalmneft JSC v Glencore International AG. Relevant considerations included delay, its explanation, responsibility for it, prejudice, continuing arbitration, the strength of the application and overall fairness. Their weight reflected expedition and finality in international arbitration, with some allowance for relatively unsophisticated parties (paras 66–68).
Receipt of an award after its date created no presumptive entitlement to 28 days from receipt. The court considered all the circumstances, including use of the original period and the additional time reasonably needed. An extension was unjustified where proceedings could reasonably have been commenced within the time remaining (paras 69–71).
The judge was entitled to treat the reasonableness of the seller's mistake as decisive. Although the earlier Commercial Court observations were obiter and their reasoning differed, their agreement on the starting date, reinforced by leading textbooks, warned of the risk of delay. The finding that the seller had acted unreasonably, and the refusal to extend time, therefore stood (paras 72–76).
The court’s approach to earlier authorities
Available to signed-in members.
Appellate history
- Court of Appeal (Civil Division): [2026] EWCA Civ 1502 . Following a rolled-up hearing, granted permission on both grounds and unanimously dismissed the appeal, leaving the strike-out order and refusal of an extension in place.
- High Court, Commercial Court: Bright J, [2025] EWHC 2713 (Comm) , struck out the section 69 claim on 21 October 2025 as outside the section 70(3) time limit, refused an extension under section 80(5) of the Arbitration Act 1996, and refused permission to appeal.
- FOSFA Board of Appeal: By an award dated 26 March 2025, upheld the first-tier tribunal's liability findings but reduced damages from US$20,508,000 to US$20,010,000. The award was released on 10 April 2025.
- FOSFA first-tier tribunal: By an award dated 27 March 2024, found the seller liable for breach of contract and awarded US$20,508,000, together with interest and costs.
Appeal route
- Appealed from · 21 October 2025JSC “Kazan Oil Plant” v Aves Trade DMCC[2025] EWHC 2713 (Comm) High Court (Commercial Court)UpheldPermission to appeal granted on both grounds; appeal dismissed unanimously.
- This judgment · 24 November 2026 [2026] EWCA Civ 1502 Court of Appeal (Civil Division)
Other judgments in these proceedings
2 judgments in these proceedings, earliest first. Linked by appeals and by the court numbers the judgments share.
- 21 October 2025JSC “Kazan Oil Plant” v Aves Trade DMCC
- 24 November 2026JSC "KAZAN OIL PLANT" v AVES TRADE DMCC
Key cases cited
9 authorities cited.
- Inco Europe Ltd v First Choice Distribution [2000] 1 WLR 586
- The Czech Republic v Diag Human Se & Anor [2023] EWCA Civ 1518
- National Iranian Oil Company v Crescent Petroleum Company International Ltd & Anor [2023] EWCA Civ 826
- Peel v Coln Park LLP [2010] EWCA Civ 1602
- Sumukan Ltd v The Commonwealth Secretariat [2007] EWCA Civ 243
- A Ltd v B Ltd [2014] EWHC 1870 (Comm)
- PEC Ltd v Asia Golden Rice Co Ltd [2012] EWHC 846 (Comm)
- UR Power GmbH v Kuok Oils and Grains Pte Ltd [2009] EWHC 1940 (Comm)
- AOOT Kalmneft v Glencore International AG [2002] 1 All ER 76
Sign in to see how the court treated each authority. A free account is enough.
Cases citing this case
Available to signed-in members.