Natalie Barstow v Green Generation Energy Networks Cymru Ltd

[2026] EWHC 1698 (Admin)

Summary

An acquiring authority exercising powers under Part 7 of the Housing and Planning Act 2016 must give notice of intended entry to every owner and every occupier. Notice does not run with the land. Ordinary post may suffice without proof of actual receipt, following reasonable enquiries into ownership and occupation.

A notice need not specify the first day of entry, but must provide for contact with its recipient before entry. It must have regard to the Code of Practice on Powers of Entry and provide reasonably practicable details of what is proposed, where and when. The period for which notice remains effective and whether entry is at a reasonable time depend on the activity, the notice and the circumstances of the land and those concerned.

Factual background

Natalie Barstow occupied family farmland over which Green Generation Energy Networks Cymru Ltd, a licensed electricity distribution network operator and acquiring authority, sought to conduct surveys for proposed grid connections. The Campaign for the Protection of Rural Wales and The Land Justice Coalition Ltd joined her claim. They challenged the company's notices and entries under Part 7 of the Housing and Planning Act 2016, including a survey entry onto the family land.

The claimants sought declarations about the statutory powers and Convention rights, and relief concerning data obtained through surveys. The court considered the requirements for notice and reasonable timing, the exercise of the powers in relation to equality and environmental duties, and the collection and processing of data. Interim relief had restrained some entries while allowing time-critical surveys to proceed.

Held

Declarations granted. Part 7 of the Housing and Planning Act 2016 balances the acquiring authority's need for information against owners' and occupiers' interests. Section 174 requires notice to every owner and every occupier. The authority must make reasonable enquiries about ownership and occupation. Ordinary post can suffice without proof of actual receipt; affixing notice to the land may be necessary where enquiries produce no or uncertain results. A notice does not run with the land. UKI (Kingsway) Ltd v Westminster City Council [2019] 1 WLR 104 did not establish otherwise ([117]–[128], [200]).

Section 174 does not require the notice to identify the first day of entry. It must, however, provide for contact with the recipient before entry. Notice must be framed with regard to the Code of Practice on Powers of Entry and give details with the precision reasonably practicable at service, explaining what is proposed, where and when. It should invite information about circumstances relevant to entry. A standard form can be a lawful starting point, but cannot by itself account for the circumstances of particular land and its owners and occupiers ([140]–[143], [149], [200]).

The effective life of a notice and what constitutes a reasonable time under section 172 depend on the circumstances, including the activity, its location, timing, frequency, duration and impact, and whether recipients could reasonably prepare. Project scale does not alter the statutory balance. R (Sharp) v Northumbrian Water Limited [2020] EWHC 84 concerned a different issue and did not assist the defendant. A corporate body may be authorised, but the defendant's scheme-wide authorisations lacked sufficient specificity ([130]–[145]).

The first claimant and the occupiers had been given notice, although the occupiers' notice was discarded unopened. The notice failed to comply with the Code. The entry onto the family land was minor and inadvertent; it was a mistake, not irrational conduct. The court found no separate public law error concerning biodiversity duties. Determining the first claimant's remaining Convention arguments would be academic, and the evidence did not permit a broad assessment of other individuals' circumstances ([150], [153]–[157], [163]–[174]).

The third claimant had not established that it qualified as a representative body for data subjects. The Administrative Court was not barred from hearing a data protection claim, but the specialist statutory arrangements and other circumstances made relief inappropriate here. The court considered the processing necessary for the infrastructure project and lawful under article 6 of the UK GDPR ([179]–[191]).

The court refused to quash notices: that relief had first been sought after the draft judgment and would be unfair in light of the pleaded case. It also declined supervision or liberty to apply. There was no order for the costs of interim relief. The claimants were awarded 60% of their substantive costs, namely £21,000 ([213]–[218], [239]–[240]).

The court’s approach to earlier authorities

Available to signed-in members.

Appellate history

Permission was refused on the papers. Limited permission was granted on renewal, and further permission was granted to argue the interpretation of section 174 and the data protection grounds. Interim relief restrained entry subject to exceptions for surveys. The High Court subsequently determined the substantive claim and granted declarations.

Key cases cited

10 authorities cited.

Sign in to see how the court treated each authority. A free account is enough.

Cases citing this case

Available to signed-in members.