Roger Brookhouse & Anor v The Environment Agency

[2026] UKUT 209 (LC)

Summary

Full compensation for injury caused by flood defence works should put the injured party fairly and reasonably in the position they occupied before the damage, so far as money can do so. Where the reasonable measure is the cost of remediation, the award must reflect a solution suited to the cause of the damage and the reasonable cost of carrying it out.

An earlier, unappealed determination of liability provides the basis for the subsequent assessment of compensation. Expert witnesses at the quantum hearing must nevertheless give their genuine opinions, even if those opinions differ from the earlier findings. Where future costs are compensated in advance, an allowance for inflation is generally unnecessary because the recipient can invest the award pending expenditure.

Factual background

Roger and Suzanne Brookhouse owned a historic riverside property in Sandwich. The Environment Agency built flood defences along its frontage. In an earlier, unappealed liability decision, the Upper Tribunal found that the works had raised groundwater levels and damaged the property. It left the amount of compensation to be determined.

The claimants sought the cost of repairing the house, restoring groundwater levels and meeting associated expenses under the Water Resources Act 1991. They also sought the cost of restoring the garden and replacing a swimming pool under a deed made with the Agency before the works. By consent, the parties referred the deed disputes to the Tribunal for arbitration.

The principal issues were the appropriate method and reasonable cost of restoring groundwater levels, the cost of associated repairs and garden restoration, and whether the Agency was liable to replace the pool.

Held

Compensation determined at £3,315,200, including VAT. The Tribunal assessed the statutory and deed claims on the basis of its unappealed liability findings. Experts were required to give their genuine opinions even where they disagreed with those findings. Their fresh evidence did not show that the earlier findings were wrong (paras 4, 112–123).

Under paragraph 5(1) of Schedule 21 to the Water Resources Act 1991, full compensation was a sum that would put the claimants fairly and reasonably in their pre-damage position, so far as money could do so. The Agency accepted remediation costs as the measure for all work except, potentially, restoration of groundwater levels. The Tribunal left unresolved the Agency’s contention that compensation for that item should be limited to the loss in value, since its assessed cost, including VAT, was below the property’s unblighted value of £1,850,000 (paras 39, 41–43, 179). The Tribunal used the compensatory principle stated in Ward v Cannock Chase District Council [1986] 1 Ch 546, quoting Munelly v Calcon Limited [1978] IR 387 (para 42).

The proposed replacement dock wall was the appropriate groundwater remedy. It addressed the identified inflow path and excessive tidal ingress. The alternative drain probably would be ineffective and was designed to address a different problem. The Tribunal assessed the dock wall works at £1,210,500 before VAT. It awarded £90,000 before VAT for the house and £221,000 before VAT for other statutory costs. It declined the separate claim for reinstating drains because damage to them by the Agency’s works had not been established (paras 81, 111–123, 179, 183, 192).

Future costs are generally awarded without an inflation allowance because the recipient can invest the money before expenditure. The Tribunal nevertheless included agreed inflation allowances or amounts where both experts allowed for inflation but differed on its calculation (para 48).

Under the deed, the Tribunal assessed garden restoration at £814,500 before VAT. The obligation to care for and monitor replacement landscaping for five years required practical care and replacement of failed plants, but did not transfer ordinary gardening costs to the Agency. The Agency was also liable for a replacement pool: the probable cause of the settlement and panel separation making the existing pool irreparable was its works. The replacement cost was £197,500 before VAT (paras 206–212, 227–231).

The court’s approach to earlier authorities

Available to signed-in members.

Appellate history

In an earlier stage of the same proceedings, the Upper Tribunal determined liability but left quantum for a later hearing: Brookhouse v Environment Agency [2023] UKUT 282 (LC) . That decision remained unappealed. The present decision determines the statutory compensation and the amount required to fulfil the Agency’s obligations under the deed.

Other judgments in these proceedings

2 judgments in these proceedings, earliest first. Linked by the shared court number LC-2020-14, and by appeals.

  1. Roger Brookhouse & Anor v The Environment Agency[2023] UKUT 282 (LC) · Upper Tribunal (Lands Chamber)
  2. Roger Brookhouse & Anor v The Environment Agency[2026] UKUT 209 (LC) · Upper Tribunal (Lands Chamber) · this judgment

Key cases cited

2 authorities cited.

  • Ward v Cannock Chase District Council [1986] Ch 546
  • Munelly v Calcon Limited [1978] IR 387