Vivid Housing Limited v Allianz Global Corporate & Specialty SE

[2026] EWCA Civ 1389

Summary

Insurance against a defect causing a threat of imminent destruction or physical damage requires an objective, prospective assessment of whether the damage is sufficiently likely to happen sufficiently soon. Imminence is a question of fact and degree in the context of the policy. Fire safety defects do not automatically satisfy that requirement. Whether such defects create the required threat, and require immediate remedial measures to prevent damage during the insurance period, may require determination at trial. The severity of the risk bears on the urgency of remedial measures. Statements in a claim notification about urgent repairs are not determinative. A waking watch may arguably constitute a remedial measure, but its qualification remains a factual issue.

Factual background

Vivid Housing Limited owned the freehold of a block of 72 flats and was insured under a housing warranty policy issued on behalf of Allianz Global Corporate & Specialty SE. Shortly before the insurance period expired, Vivid notified defects concerning combustible cladding, missing or defective cavity barriers and building debris. The policy covered a defect causing a threat of imminent destruction or physical damage which required immediate remedial measures to prevent destruction or damage within the insurance period.

Allianz sought summary judgment. For that application, it accepted that the alleged defects were defects within the policy and did not rely on a fire-related exclusion. Jefford J substantially dismissed the application in [2025] EWHC 3315 (TCC). Allianz appealed, arguing that her construction deprived imminence and immediacy of effective meaning. The central issue was whether she had applied the correct construction and could properly leave the assessment of the fire risks and remedial measures for trial.

Held

The appeal was dismissed unanimously. Stuart-Smith LJ gave the substantive judgment, with which Phillips and Peter Jackson LJJ agreed.

  1. Imminence required consideration, prospectively and objectively, of whether a reasonable observer would regard the damage as sufficiently likely to happen sufficiently soon. That assessment was a question of fact and degree in the context of the policy. The formulation in Gerling General Insurance Co and others v Canary Wharf plc [2003] EWHC 2234 (Comm) was applied. The judge had adopted that formulation and had expressly considered both likelihood and timing ([16]–[18]).

  2. The insured peril was a defect causing a threat of imminent destruction or physical damage, rather than the threat of fire itself. The judge had not adopted the proposition that fire damage was always imminent. She was entitled to conclude that Vivid had a real prospect of establishing that a reasonable observer would identify a serious risk of fire and consequent destruction or damage sufficiently soon. She had properly refrained from deciding the ultimate assessment before the evidence was developed at trial ([18]–[20]).

  3. The requirement for immediate remedial measures also involved matters of fact and degree. The severity of the risk had an obvious relationship with the urgency of remedial repairs. The notification's statements about urgent repairs were not determinative, while the expert prioritisation of compartmentation defects was informative. It was at least tenable that a waking watch constituted a remedial step because it reduced the risk of fire spreading. The evidence concerning other remedial works and their timing had not been established. These were matters for trial, and the refusal of summary judgment was upheld ([21]).

  4. The alternative constructions advanced in Vivid's respondent's notice did not require determination, and the court expressed no view on them ([22]).

The court’s approach to earlier authorities

Available to signed-in members.

Appellate history

  • Court of Appeal (Civil Division): In [2026] EWCA Civ 1389 , unanimously dismissed Allianz's appeal and upheld the refusal of summary judgment concerning the defects in issue.
  • High Court, Technology and Construction Court: Jefford J, in [2025] EWHC 3315 (TCC) , dated 16 December 2025, dismissed the majority of Allianz's application for summary judgment. She held that Vivid's case had a real prospect of success concerning all alleged defects other than Defect 4.

Appeal route

  1. Appealed from · 18 December 2025Vivid Housing Limited v Allianz Global Corporate & Specialty SE[2025] EWHC 3315 (TCC) High Court (Technology and Construction Court)UpheldAppeal dismissed unanimously.
  2. This judgment · 3 November 2026 [2026] EWCA Civ 1389 Court of Appeal (Civil Division)

Other judgments in these proceedings

2 judgments in these proceedings, earliest first. Linked by appeals and by the court numbers the judgments share.

  1. 18 December 2025Vivid Housing Limited v Allianz Global Corporate & Specialty SE[2025] EWHC 3315 (TCC) · High Court (Technology and Construction Court)
  2. 3 November 2026VIVID HOUSING LIMITED v ALLIANZ GLOBAL CORPORATE & SPECIALTY SE[2026] EWCA Civ 1389 · Court of Appeal (Civil Division) · this judgment

Key cases cited

1 authority cited.

  • Gerling General Insurance Co and others v Canary Wharf plc [2003] EWHC 2234 (Comm)

Sign in to see how the court treated each authority. A free account is enough.