Landsul Limited v Secretary of State for Energy Security and Net Zero

[2026] EWHC 2887 (Admin)

Summary

An indicative layout may provide evidence that land is required for development authorised by a development consent order. A competing layout may support the opposite conclusion. Neither is necessarily determinative: the examining authority must evaluate the evidence against the statutory condition.

A compelling case for compulsory acquisition may be established despite a technically feasible alternative if that alternative would unacceptably compromise reasonable operational requirements. In assessing proportionality, the court makes its own assessment while giving appropriate weight to the decision-maker’s institutional expertise.

An affected landowner’s right to a compulsory acquisition hearing encompasses a proper opportunity to address the key contentions underlying the whole objection, with knowledge of the applicant’s key responses. Further evidence does not automatically require another hearing. The inquisitorial examination procedure does not confer a general right to cross-examine the applicant’s witnesses.

Factual background

Landsul Limited owned land occupied by Munster Joinery (UK) Limited as an industrial and distribution site. Cory Environmental Holdings Limited sought development consent for a carbon capture facility serving two energy-from-waste generating stations. The Secretary of State made a development consent order authorising Cory to acquire Landsul’s land compulsorily.

Landsul and Munster had objected at the examination. Landsul relied on expert evidence and alternative layouts which, it said, showed that the facility could be built without its land. The examining authority recommended the order, finding the land required and a compelling public interest case for acquisition. The Secretary of State agreed.

Landsul challenged the order under section 118 of the Planning Act 2008. It disputed the application of the statutory compulsory acquisition conditions and the proportionality of the interference with its property rights. It also alleged unfairness in the refusal of a further compulsory acquisition hearing and cross-examination, and in the treatment of its expert evidence.

Held

The claim was dismissed.

  1. Under section 122(2) of the Planning Act 2008, an indicative layout can provide a proper evidential basis for deciding whether land is required for the authorised development. A competing layout can also inform that decision. The examining authority was entitled to weigh both layouts and their criticisms. It did not treat Cory’s indicative layout as conclusive or substitute it for the authorised development. It reasonably found that the proposed layout was not excessively dispersed and that Cory’s requirement for a contiguous operational site was reasonable. The technical feasibility of Landsul’s non-contiguous alternative did not compel a different conclusion ([138]–[148]).

  2. The compelling public interest condition in section 122(3) was for the Secretary of State to determine on the evidence, subject to conventional public law review. The examining authority properly considered the smaller proposed electricity substation. It could find that the alternative was too uncertain to displace Cory’s deliverable proposal. It could also find that provision for a heat transfer station was compellingly justified by national and local policy, despite uncertainty about connections, demand and commercial viability. The policy supported a realistic prospect of future use ([154]–[170]).

  3. The purpose of assembling land for the proposed scheme was legitimate. Applying Bank Mellat v HM Treasury (No. 2) [2013] UKSC 39 and Shvidler v Secretary of State for Foreign, Commonwealth and Development Affairs [2025] UKSC 30, the court made its own proportionality assessment and gave considerable weight to the examining authority’s informed findings. The less intrusive alternative would unacceptably compromise delivery and operation. The public benefits, the effect on the owner and occupier, and available compensation were weighed. Acquisition was reasonably necessary and struck a fair balance under article 1 of the First Protocol ([180]–[197]).

  4. Section 92(4) entitles an affected landowner to a proper opportunity to make oral representations covering the key contentions underlying the whole objection, informed by the applicant’s key responses. Fairness may require a further hearing if those requirements have not been met. The iterative submission of further evidence does not itself confer a right to another hearing. Landsul had been heard on its key objections and the parties’ positions had not materially changed afterwards. The refusal of a further hearing was fair and reasonable ([205]–[220]).

  5. The statutory examination is inquisitorial. Neither fairness nor article 6 establishes a general right for an affected landowner to cross-examine the applicant’s witnesses irrespective of that procedure. The examining authority reasonably led questioning and allowed supplementary questions. It was also entitled to assess the competing technical evidence for adequacy and persuasiveness. The formal requirements governing expert evidence in civil proceedings did not apply to the examination ([227]–[253]).

The court’s approach to earlier authorities

Available to signed-in members.

Appellate history

High Court (Planning Court): Permission to bring the claim was granted on 4 March 2026. The court dismissed the substantive challenge to the development consent order.

Key cases cited

16 authorities cited.

Sign in to see how the court treated each authority. A free account is enough.

Cases citing this case

Available to signed-in members.