Swindon Borough Council v Thames Water Utilities Limited, R (on the application of)

[2026] EWCA Civ 1464

Summary

A highway authority may set permit fees to recover prescribed operating costs left unpaid in earlier financial years. Regulation 29 of the Traffic Management Permit Scheme (England) Regulations 2007 provides an annual method of calculating prescribed costs. Regulation 32 restricts the purposes for which fee income may be used, without requiring income and costs to relate to the same year. Fees may therefore reflect past deficits or surpluses, subject to the statutory limits and restrictions on their use. Regulation 28 concerns fixed penalty income and does not authorise spending surplus permit fees on wider transport purposes. Express provision for balancing income and costs across years in other legislation creates no general requirement for equivalent wording in this scheme.

Factual background

Swindon Borough Council, the local highway and permit authority, operated a scheme charging statutory undertakers for permits to carry out street works. Thames Water Utilities Limited was a statutory undertaker subject to those charges. After the scheme accumulated a deficit, the council introduced revised fees intended to recover it over subsequent years.

Thames Water sought judicial review, contending that fees could cover only prescribed costs arising in the same financial year. Permission was granted on that vires ground and refused on a consultation ground. Dias J allowed the claim and quashed the revised scheme: [2026] EWHC 1348 (Admin). The council appealed. The central issue was whether the statutory scheme permitted fees to be set at a level which recovered past deficits.

Held

Appeal allowed unanimously. Lieven LJ, with whom Miles and Newey LJJ agreed, held that the regulations permitted fees to be set to offset past deficits. The order quashing the permit scheme was set aside.

  1. Section 37(9) of the Traffic Management Act 2004 required the Secretary of State to seek to ensure that fees did not exceed prescribed costs. It specified no period over which that balance had to be achieved. Express provisions for carrying balances forward in other statutes created no general principle requiring equivalent wording here. Each statutory scheme required interpretation in its own context (paras 59–60).

  2. Regulation 29 of the Traffic Management Permit Scheme (England) Regulations 2007 prescribed the mechanics of calculating allowable costs by reference to a financial year. Regulation 32 governed the application of fee income. It confined that income to prescribed costs but did not require those costs to arise in the year of receipt. Read in their statutory context and purpose, the provisions permitted account to be taken of earlier deficits and surpluses (paras 61–62, 68).

  3. Regulation 28 concerned fixed penalty income. It allowed that income to meet remaining scheme costs, including costs outside the prescribed category, and required the net proceeds to serve the specified transport purposes. It neither imposed an annual restriction nor authorised surplus permit fees to be used for those wider purposes. The separation between sanctions in Part 5 and fees in Part 6 reinforced that distinction (paras 63–65).

  4. The annual-only construction left surplus fees without a coherent statutory destination. Frequent reviews within each year would also impose significant administrative burdens and costs. Regulation 16A contemplated annual evaluations initially and three-yearly evaluations thereafter. Although more frequent reviews were permitted, the scheme could not sensibly depend on them. Section 111 of the Local Government Act 1972 supplied no escape from the governing statutory scheme (paras 64–67).

  5. The extrinsic materials confirmed the construction reached from the regulations. The contemporaneous Explanatory Memorandum and attached impact assessment envisaged adjustments in subsequent years for deficits and surpluses. Statutory guidance was a mandatory consideration when preparing a scheme, but was not law and could not alter statutory meaning. Its weight was generally greater in reviewing discretionary decisions than in determining vires. Nevertheless, its express references to carrying surpluses forward and balancing income and costs over several years supported the same conclusion (paras 69–75).

The court’s approach to earlier authorities

Available to signed-in members.

Appellate history

  • Court of Appeal (Civil Division): [2026] EWCA Civ 1464 . Allowed the council’s appeal unanimously and set aside the order quashing the permit scheme.
  • High Court, King’s Bench Division, Administrative Court: [2026] EWHC 1348 (Admin). Dias J allowed judicial review and quashed the scheme because the council had increased fees to recover past deficits. Permission had previously been granted on the vires ground and refused on the consultation ground.

Appeal route

  1. Appealed fromUnknown case[2026] EWHC 1348 (Admin) EWHCReversedAppeal allowed unanimously; order quashing the permit scheme set aside
  2. This judgment · 19 November 2026 [2026] EWCA Civ 1464 Court of Appeal (Civil Division)