| Date | Case | Cited by |
|---|---|---|
| 19 Dec 2013 |
[2013] EWHC 4110 (TCC)
Specific performance may be ordered where damages would not adequately protect the claimant, including where the defendant’s financial position makes…
|
1 |
| 17 Dec 2013 |
[2013] EWHC 3948 (TCC)
On an application to strike out or obtain summary judgment, the court must decide whether the claim has a realistic, rather than fanciful, prospect of success.…
|
|
| 16 Dec 2013 |
[2013] EWHC 4030 (TCC)
A contractor’s failure to provide a revised programme may be a material breach where the programme is essential to monitoring progress and coordinating the…
|
4 |
| 13 Dec 2013 |
[2013] EWHC 4004 (TCC)
A fixed-price subcontractor’s obligation is determined by the contractual documents, including expressly incorporated amendments. A stated pipe size forming…
|
|
| 12 Dec 2013 |
[2013] EWHC 3949 (TCC)
Adjudicators’ decisions should be enforced summarily, even where the adjudicator expressed reservations about a difficult conclusion. A pending winding-up…
|
|
| 6 Dec 2013 |
[2013] EWHC 3723 (TCC)
The scope of an adjudication is defined by the Notice of Adjudication. A Referral Notice cannot narrow that scope where the Notice plainly encompasses the…
|
1 |
| 18 Nov 2013 |
[2013] EWHC 3576 (TCC)
An adjudicator’s decision may be jurisdictionally valid and prima facie enforceable even where the successful party is subject to a company voluntary…
|
3 |
| 15 Nov 2013 |
[2013] EWHC 3526 (TCC)
An application to strike out pleaded defences should ordinarily be made before the court has established a procedural framework for their trial. A late…
|
|
| 15 Nov 2013 |
[2013] EWHC 3468 (TCC)
Costs should reflect the parties’ conduct, the proportionality of the costs incurred and the requirements of the overriding objective. Where opposition to an…
|
|
| 11 Nov 2013 |
[2013] EWHC 3417 (TCC)
An adjudicator may decide an issue on a basis for which neither party expressly contended if the relevant material was before the parties and the resulting…
|
13 |
| 4 Nov 2013 |
[2013] EWHC 3375 (TCC)
An arbitration award should ordinarily be honoured when due. A short period may be allowed to arrange payment, but delay is not thereby excused. Where a party…
|
|
| 1 Nov 2013 |
[2013] EWHC 3275 (TCC)
A collateral contract or contractual warranty cannot be inferred from a funder’s involvement in a construction project without a clear and sufficiently certain…
|
|
| 29 Oct 2013 |
[2013] EWHC 3273 (TCC)
A negligence claim for economic loss caused by defective goods generally requires physical damage or injury to something other than the defective item itself…
|
|
| 28 Oct 2013 |
[2013] EWHC 3262 (TCC)
In adjudication enforcement proceedings, the scope of the referred dispute is identified by examining the essential claim, the parties’ communications and the…
|
5 |
| 24 Oct 2013 |
[2013] EWHC 3201 (TCC)
Interim relief may restrain a beneficiary from calling an on-demand performance guarantee where the underlying contract clearly and expressly prevents the…
|
2 |
| 24 Oct 2013 |
[2013] EWHC 3197 (TCC)
Under rule 8(2) of Schedule 4 to the Civil Jurisdiction and Judgments Act 1982, proceedings against a consumer may be brought only in the courts of the part of…
|
4 |
| 24 Oct 2013 |
[2013] EWHC 3183 (TCC)
When a party seeks permission to replace an expert after the pre-action process has begun, the court may require disclosure of earlier reports or documents…
|
7 |
| 21 Oct 2013 |
[2013] EWHC 3142 (TCC)
Under section 107(5) of the Housing Grants, Construction and Regeneration Act 1996, an exchange of written submissions may establish an agreement in writing…
|
|
| 18 Oct 2013 |
[2013] EWHC 3173 (TCC)
Expert evidence should be admitted where it may assist the court on issues in dispute and is reasonably required for the fair resolution of the proceedings.…
|
|
| 18 Oct 2013 |
[2013] EWHC 3150 (TCC)
Whether permission is needed to advance a new head of loss depends on the substance of the case, not the label attached to it. Pleadings must identify the real…
|
2 |
| 17 Oct 2013 |
[2013] EWHC 3352 (TCC)
Where an amendment application fails because the claimant cannot satisfy a condition requiring adequate particulars, the court may order the claimant to pay…
|
|
| 17 Oct 2013 |
[2013] EWHC 3145 (TCC)
Under the amended overriding objective, the court must deal with cases justly and at proportionate cost. This requires particular attention to saving expense…
|
|
| 11 Oct 2013 |
[2013] EWHC 3025 (TCC)
The Late Payment of Commercial Debts (Interest) Act 1998 applies to qualifying debts arising from an obligation to pay the contractual price for goods or…
|
4 |
| 11 Oct 2013 |
[2013] EWHC 3010 (TCC)
For an interim injunction restraining a demand under an on-demand bond or guarantee, the claimant must show a strong case that the underlying contract prevents…
|
1 |
| 10 Oct 2013 |
[2013] EWHC 3202 (TCC)
Statutory interest on damages for commercial loss is generally assessed by reference to the normal commercial rate at which the claimant would have had to…
|
|
| 10 Oct 2013 |
[2013] EWHC 2916 (TCC)
In a detailed construction contract, an obligation to proceed with due diligence is assessed objectively by reference to the contractual objectives, programme…
|
1 |
| 4 Oct 2013 |
[2013] EWHC 2954 (TCC)
Contract terms must not undermine the statutory adjudication scheme by postponing payment of an adjudicator’s award or deterring a party from adjudicating.…
|
2 |
| 3 Oct 2013 |
[2013] EWHC 2959 (TCC)
Indemnity costs require conduct sufficiently unreasonable to justify departing from the standard basis. A party does not act unreasonably merely by advancing a…
|
|
| 2 Oct 2013 |
[2013] EWHC 2879 (TCC)
A referral notice under the Scheme starts time running when it identifies and refers the dispute in writing. Failure to provide supporting documents at the…
|
4 |
| 2 Oct 2013 |
[2013] EWHC 2868 (TCC)
Permission to amend a statement of case should be refused where the proposed pleading remains incoherent, vague or legally unsustainable after repeated…
|
|
| 26 Sep 2013 |
[2013] EWHC 2922 (TCC)
Transitional provisions for procurement remedies apply according to their clear terms. A contract-award procedure begun before the stated date remained…
|
20 |
| 25 Sep 2013 |
[2013] EWHC 2923 (TCC)
Costs budgets must be proportionate and reasonable in relation to the value and complexity of the dispute. The assessment may allow for necessary expert…
|
3 |
| 5 Sep 2013 |
[2013] EWHC 2722 (TCC)
An adjudicator may determine a broadly referred payment dispute by selecting a legal and contractual permutation arising from the parties’ submissions. A party…
|
2 |
| 3 Sep 2013 |
[2013] EWHC 2688 (TCC)
A contract naming an existing company will not be treated as a contract with another company merely because the latter performed the work or was intended…
|
6 |
| 3 Sep 2013 |
[2013] EWHC 2687 (TCC)
Liability in nuisance for tree-root subsidence requires foreseeability of the particular risk posed by the particular tree. General awareness that trees may…
|
|
| 30 Aug 2013 |
[2013] EWHC 2964 (TCC)
Early specific disclosure in procurement proceedings is exceptional and must be justified by the needs of an imminent application or hearing. The request must…
|
|
| 29 Aug 2013 |
[2013] EWHC 2665 (TCC)
A collateral warranty may constitute a construction contract under Part II of the Housing Grants, Construction and Regeneration Act 1996. The question is…
|
2 |
| 20 Aug 2013 |
[2013] EWHC 2576 (TCC)
In assessing damages for construction negligence, the claimant must establish the loss claimed, but the defendant bears the onus of proving a failure to…
|
|
| 14 Aug 2013 |
[2013] EWHC 2376 (TCC)
An implied contractual licence requires, viewed objectively, an intention to create legal relations. Where parties have not addressed payment or continuation…
|
|
| 2 Aug 2013 |
[2013] EWHC 3100 (TCC)
On an application to amend, the court should not conduct a mini-trial or reject a realistically arguable claim merely because it may fail. The claimant must…
|
|
| 31 Jul 2013 |
[2013] EWHC 2394 (TCC)
A beneficiary under an architectural collateral warranty is not treated as responsible for the contractor’s negligence merely because the warranty treats the…
|
|
| 30 Jul 2013 |
[2013] EWHC 2341 (TCC)
An occupier may owe a duty to protect users of adjoining land from dangers arising from visitors’ activities, including driving or parking vehicles. The duty…
|
|
| 30 Jul 2013 |
[2013] EWHC 2212 (TCC)
Interest on damages normally runs from the date the claimant was deprived of the money, which may be later than accrual of the cause of action. A claimant’s…
|
1 |
| 24 Jul 2013 |
[2013] EWHC 2227 (TCC)
Where a monetary Part 36 offer falls short of the judgment by any amount, it does not attract the automatic costs consequences of Part 36. The court should not…
|
3 |
| 18 Jul 2013 |
[2013] EWHC 2088 (TCC)
Amendments to a procurement claim which introduce complaints about the evaluation of a tender may constitute new claims, even where they arise from the same…
|
1 |
| 17 Jul 2013 |
[2013] EWHC 2071 (TCC)
Whether a party may set off against an adjudicator’s award depends primarily on construing the adjudicator’s decision in its contractual and procedural…
|
1 |
| 16 Jul 2013 |
[2013] EWHC 2001 (TCC)
An arbitration agreement may remain effective even where arbitration follows negotiation, dispute-board involvement and consensual procedures. The court must…
|
|
| 12 Jul 2013 |
[2013] EWHC 1983 (TCC)
An adjudicator’s error of fact, law or procedure does not ordinarily justify refusing enforcement. The court will intervene where there has been an actual or…
|
8 |
| 12 Jul 2013 |
[2013] EWHC 1940 (TCC)
An occupier or contractor is required to take reasonable care when investigating utility services and carrying out works; the obligation is not absolute. In an…
|
|
| 8 Jul 2013 |
[2013] EWHC 2082 (TCC)
Applications for specific disclosure before an urgent application to lift a statutory suspension must be determined by reference to fairness, necessity and…
|
3 |
| 4 Jul 2013 |
[2013] EWHC 1890 (TCC)
In exercising the costs discretion after settlement, the court must assess what is just in the circumstances of the case. Relevant matters include the parties’…
|
|
| 3 Jul 2013 |
[2013] EWHC 1898 (TCC)
An adjudicator’s decision will ordinarily be enforced, even where the successful party is insolvent, unless the paying party has real grounds for challenging…
|
2 |
| 1 Jul 2013 |
[2013] EWHC 2403 (TCC)
An architect responsible for design coordination must design, or procure the design of, architectural features and provide the criteria needed for delegated…
|
1 |
| 28 Jun 2013 |
[2013] EWHC 1825 (TCC)
Proceedings are commenced under the Civil Procedure Rules when the court issues the claim form, not when it is served. Contractual wording requiring…
|
1 |
| 27 Jun 2013 |
[2013] EWHC 1790 (TCC)
Amendments may be permitted where they rely on already pleaded breaches, even if they claim substantially increased damages or total replacement costs. A later…
|
|
| 24 Jun 2013 |
[2013] EWHC 1859 (TCC)
An indemnity costs order requires conduct or circumstances taking the case outside the ordinary run of litigation. The mere fact that a party lost, even…
|
4 |
| 24 Jun 2013 |
[2013] EWHC 1718 (TCC)
A professional is not negligent merely because an inspection fails to identify the true cause of a defect. The question is whether the advice fell below the…
|
|
| 17 Jun 2013 |
[2013] EWHC 1693 (TCC)
A photocopy of a sealed claim form sent by Document Exchange will generally not constitute valid service within the jurisdiction. The relevant document is…
|
8 |
| 14 Jun 2013 |
[2013] EWHC 1643 (TCC)
Indemnity costs require conduct unreasonable to a high degree or circumstances taking the case outside the norm. An arguable but unsuccessful claim does not…
|
13 |
| 24 May 2013 |
[2013] EWHC 1191 (TCC)
A contractual completion date may be extended where delay is caused by the other party’s acts or omissions and falls beyond the consultant’s reasonable…
|
3 |
| 23 May 2013 |
[2013] EWHC 2524 (TCC)
Adjudication decisions should generally be enforced promptly because adjudication is intended to maintain cashflow. A stay of execution may be justified where…
|
|
| 23 May 2013 |
[2013] EWHC 2356 (TCC)
On an application under section 18 of the Arbitration Act 1996, the court should not determine underlying disputes about the contract or arbitration agreement.…
|
|
| 23 May 2013 |
[2013] EWHC 1322 (TCC)
A party required to pay under an adjudicator’s temporarily binding decision does not automatically acquire a new cause of action, running from payment, to…
|
1 |
| 22 May 2013 |
[2013] EWHC 1242 (TCC)
The court has a discretion to extend time for serving Particulars of Claim after the claim form has been served, but the discretion must be exercised…
|
5 |
| 14 May 2013 |
[2013] EWHC 1161 (TCC)
A repairing covenant requires deterioration from a previous physical condition and remedial work judged against the age, character and locality of the…
|
|
| 9 May 2013 |
[2013] EWHC 1186 (TCC)
In adjudication enforcement proceedings, a natural justice challenge is waived only by a clear and unequivocal act, undertaken with knowledge of the relevant…
|
4 |
| 8 May 2013 |
[2013] EWHC 1151 (TCC)
A dispute referred to adjudication may contain several issues or financial strands. Whether it is one dispute is a question of fact, assessed against the…
|
9 |
| 3 May 2013 |
[2013] EWHC 1121 (TCC)
Discretionary interest is primarily compensatory rather than punitive. The usual starting point is interest from the date loss was incurred, subject to the…
|
4 |
| 29 Apr 2013 |
[2013] EWHC 681 (TCC)
A contractual obligation to complete a development so that individual premises are fit for occupation and the building complies with regulatory requirements…
|
1 |
| 23 Apr 2013 |
[2013] EWHC 967 (TCC)
In valuing a contractual variation involving both omitted and additional work, the Engineer must identify the contribution made by the omitted work to the…
|
|
| 22 Apr 2013 |
[2013] EWHC 978 (TCC)
Commercial contracts must be interpreted objectively by reference to the contract as a whole and the background reasonably available to the parties. Where…
|
2 |
| 19 Apr 2013 |
[2013] EWHC 944 (TCC)
A repairing covenant is assessed by reference to the age, character and locality of the premises, and to the requirements of the relevant class of tenant, at…
|
|
| 19 Apr 2013 |
[2013] EWHC 933 (TCC)
In procurement challenges, an unsuccessful tenderer is generally entitled to prompt disclosure of essential contemporaneous material showing how the evaluation…
|
16 |
| 18 Apr 2013 |
[2013] EWHC 932 (TCC)
Leave to appeal an arbitral award under Arbitration Act 1996, section 69, requires a clear-cut satisfaction of the statutory threshold. A construction issue…
|
|
| 16 Apr 2013 |
[2013] EWHC 872 (TCC)
Approved costs budgets are not ordinarily revised or rectified merely because a party later identifies an omission or under-valuation. Parties are expected to…
|
1 |
| 16 Apr 2013 |
[2013] EWHC 868 (TCC)
A construction professional is liable for loss caused by negligent design, inspection or coordination, but damages must reflect what would probably have…
|
2 |
| 16 Apr 2013 |
[2013] EWHC 1376 (TCC)
A binding compromise may arise from communicated acceptance even though the parties later expect to record it in a Tomlin order. The essential question is…
|
1 |
| 15 Apr 2013 |
[2013] EWHC 812 (TCC)
A party should not obtain an increased payment into court merely because a claim has been enlarged or additional evidence has been assembled after an earlier…
|
|
| 12 Apr 2013 |
[2013] EWHC 842 (TCC)
Under section 106 of the Building Act 1984, compensation is payable where a local authority’s exercise of its statutory powers causes damage which would…
|
|
| 9 Apr 2013 |
[2013] EWHC 798 (TCC)
For adjudication under a construction contract, the fundamental requirement is referral of the dispute to the adjudicator within seven days of the notice. A…
|
4 |
| 9 Apr 2013 |
[2013] EWHC 721 (TCC)
Under section 3(5) of the Charging Orders Act 1979, the court has a discretion to discharge or vary a charging order. The discretion is not exercised lightly.…
|
|
| 14 Mar 2013 |
[2013] EWHC 509 (TCC)
Solicitors and counsel responsible for drawing up a court order must produce a draft that fairly reflects the directions actually given. They must not use the…
|
|
| 7 Mar 2013 |
[2013] EWHC 463 (TCC)
In a terminal dilapidations claim, damages are limited to the lower of the reasonable cost of remedying the breaches, including consequential loss, and the…
|
2 |
| 28 Feb 2013 |
[2013] EWHC 347 (TCC)
Under rule 32.14 of the Civil Procedure Rules 1998, a false statement verified by a statement of truth may amount to contempt where its maker knew it was false…
|
21 |
| 27 Feb 2013 |
[2013] EWHC 376 (TCC)
For the purposes of the residential occupier exception in section 106 of the Housing Grants (Construction and Regeneration) Act 1996, occupation is not…
|
1 |
| 22 Feb 2013 |
[2013] EWHC 237 (TCC)
A construction contract may allocate primary responsibility for safe working to the contractor while requiring the employer physically to isolate its own plant…
|
|
| 21 Feb 2013 |
[2013] EWHC 288 (TCC)
Under section 1 of the Defective Premises Act 1972, the statutory duty applies where work for the provision of a dwelling is arranged in the course of a…
|
|
| 8 Feb 2013 |
[2013] EWHC 149 (TCC)
Litigation privilege must be established by the party asserting it. Documents are privileged only where contemplated litigation was their sole or dominant…
|
|
| 8 Feb 2013 |
[2013] EWHC 110 (TCC)
Permission to appeal an arbitral award on a question of law under Arbitration Act 1996, section 69, requires satisfaction of the statutory conditions and…
|
1 |
| 1 Feb 2013 |
[2013] EWHC 139 (TCC)
Section 68 of the Arbitration Act 1996 is a longstop remedy for serious procedural irregularity causing substantial injustice. It does not provide a route for…
|
1 |
| 31 Jan 2013 |
[2013] EWHC 97 (TCC)
CPR 3.1 confers wide case-management powers which must be exercised to further the overriding objective, rather than to punish procedural default. The court…
|
3 |
| 31 Jan 2013 |
[2013] EWHC 104 (TCC)
A preliminary issue should be ordered only where it offers a real procedural advantage. The court must consider whether it may dispose of all or a substantial…
|
1 |
| 29 Jan 2013 |
[2013] EWHC 87 (TCC)
In adjudication enforcement proceedings, an adjudicator’s decision will generally be enforced even if the adjudicator may have erred in fact or law. A previous…
|
1 |
| 18 Jan 2013 |
[2013] EWHC 147 (TCC)
On an application for security for costs, the defendant must first establish a threshold condition under CPR 25.13. The burden is to show reason to believe…
|
9 |
| 17 Jan 2013 |
[2013] EWHC 27 (TCC)
On an application for summary judgment or strike out, the court must decide whether the claim has a realistic prospect of success without conducting a…
|
|
| 15 Jan 2013 |
[2013] EWHC 21 (TCC)
Damages for repudiatory breach are assessed to restore the claimant to the position that proper performance would have produced. Overpayments and reasonable…
|