Serapid Limited v Octavius Infrastructure Limited

[2026] EWHC 2695 (TCC)

Summary

Summary judgment to enforce an adjudicator’s decision should be refused where the respondent has a real prospect of establishing that no contract existed and the adjudicator therefore lacked jurisdiction. Contract formation is assessed objectively from the parties’ communicated words and conduct, including whether they intended legal relations and agreed essential terms. Unresolved terms do not invariably prevent a contract, but the court must assess the evidence without conducting a mini-trial. A claimant seeking to rely on an alternative contractual case outside its pleaded claim must obtain permission to amend. Here, the proposed oral-contract case was also too uncertain and dependent on disputed evidence to support summary judgment.

Factual background

Serapid, a lift manufacturer, applied for summary judgment to enforce an adjudicator’s decision ordering Octavius, a railway and road contractor, to pay £416,499 plus the adjudicator’s fees. The adjudicator had found that the parties made an NEC3 subcontract for lifts at Chalkwell railway station. Octavius resisted enforcement on the ground that no contract had been formed and the adjudicator lacked jurisdiction. Serapid’s pleaded case was that an NEC3 subcontract had been agreed in June 2025; it also advanced an alternative case of a simple oral contract, which had not been pleaded or referred to adjudication. The issue was whether Octavius had a real prospect of establishing that no contract existed.

Held

  1. Application dismissed. Octavius had a real prospect of establishing that the parties had not formed the NEC3 subcontract alleged by Serapid. The court did not determine the underlying contract dispute at trial; it decided only that the defence met the summary judgment threshold.
  2. Under Part 24.3 of the Civil Procedure Rules 1998, summary judgment requires both that the opposing party has no real prospect of success and that there is no other compelling reason for trial. The court applied the guidance in Easyair Ltd v Opal Telecom Ltd [2009] EWHC 339 (Ch), approved in AC Ward & Sons Ltd v Catlin (Five) Ltd [2009] EWCA Civ 1098: the court must distinguish realistic from fanciful prospects, avoid a mini-trial, and consider evidence reasonably expected to be available at trial where there are grounds to believe fuller investigation could affect the outcome.
  3. In adjudication enforcement, courts should scrutinise technical jurisdiction defences with appropriate scepticism, while refusing enforcement where the adjudicator exceeded jurisdiction. The court took account of the approach in Carillion Construction Ltd v Devonport Royal Dockyard Ltd [2005] EWCA Civ 1358 and the first-instance decision [2005] BLR 310.
  4. Contract formation depends objectively on what the parties communicated by words or conduct, whether they intended legal relations and whether they agreed the terms regarded, or required by law, as essential. Terms of economic significance that remain unsettled do not necessarily prevent a contract if the objective evidence shows they were not preconditions. The court applied RTS Flexible Systems v Molkerei GmbH & Co KG [2010] UKSC 14. It considered the circumstances akin to British Steel Corp v Cleveland Bridge and Engineering Co [1984] 1 All ER 504, where work had been requested pending a formal subcontract.
  5. The evidence gave Octavius a realistic prospect of showing that neither side regarded itself as bound in June. Although key terms had largely been agreed, communications referred to a signed subcontract, negotiations continued, Serapid later sought to reopen the price, and its execution strategy suggested it was proceeding at commercial risk. Procurement had also begun before the alleged agreement, so commencing manufacture did not itself establish that contractual terms had been agreed. Relevant conversations remained disputed and could not be resolved on the documents alone.
  6. Serapid’s alternative oral-contract case was rejected. It was not pleaded and was not the contract referred to or decided in the adjudication; permission to amend was required. The alleged offer, acceptance, price and scope were unclear, and resolving the case would require disputed witness evidence. The court therefore found a real prospect that no contract existed at all. It did not need to decide the jurisdictional complexities arising where either of two possible contractual bases might engage the same statutory scheme.

The court’s approach to earlier authorities

Available to signed-in members.

Appellate history

This was a first-instance summary judgment application. The judgment records an earlier adjudication and the adjudicator’s decision, but identifies no prior court decision.

Cases on related points

  1. Viridis UK Ltd v Mulalley & Company Ltd[2014] EWHC 268 (TCC) · High Court (Technology and Construction Court)Relies on 2 of the same authorities
  2. RMP Construction Services Ltd v Chalcroft Ltd[2015] EWHC 3737 (TCC) · High Court (Technology and Construction Court)Relies on 2 of the same authorities
  3. Williams (t/a Sanclair Construction) v Noor (t/a India Kitchen)[2007] EWHC 3467 (TCC) · High Court (Technology and Construction Court)Relies on 2 of the same authorities

Key cases cited

7 authorities cited.

Sign in to see how the court treated each authority. A free account is enough.

Cases citing this case

Available to signed-in members.